• EN 60071-2:1997

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    Insulation co-ordination - Part 2: Application guide

    Available format(s): 

    Superseded date:  01-05-2018

    Language(s): 

    Published date:  03-01-1997

    Publisher:  European Committee for Standards - Electrical

    Pure ENs are not available for sale, please purchase a suitable national adoption

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    1 General
        1.1 Scope
        1.2 Normative references
        1.3 List of symbols and definitions
    2 Representative voltage stresses in service
        2.1 Origin and classification of voltage stresses
        2.2 Characteristics of overvoltage protective devices
        2.3 Representative voltages and overvoltages
    3 Co-ordination withstand voltage
        3.1 Insulation strength characteristics
        3.2 Performance criterion
        3.3 Insulation co-ordination procedures
    4 Required withstand voltage
        4.1 General remarks
        4.2 Atmospheric correction
        4.3 Safety factors
    5 Standard withstand voltage and testing procedures
        5.1 General remarks
        5.2 Test conversion factors
        5.3 Determination of insulation withstand by type tests
    6 Special considerations for overhead lines
        6.1 General remarks
        6.2 Insulation co-ordination for operating voltages
              and temporary overvoltages
        6.3 Insulation co-ordination for slow-front overvoltages
        6.4 Insulation co-ordination for lightning overvoltages
    7 Special considerations for substations
        7.1 General remarks
        7.2 Insulation co-ordination for overvoltages
    Tables
    1 Recommended creepage distances
    2 Test conversion factors for range I, to convert required
        switching impulses withstand voltages to short-
        duration power-frequency and lightning impulse
        withstand voltages
    3 Test conversion factors for range II to convert required
        short-duration power-frequency withstand voltages to
        switching impulse withstand voltages
    4 Selectivity of test procedures B and C of IEC 60-1
    A.1 Correlation between standard lightning impulse withstand
        voltages and minimum air clearances
    A.2 Correlation between standard switching impulse withstand
        voltages and minimum phase-to-earth air clearances
    A.3 Correlation between standard switching impulse withstand
        voltages and minimum phase-to-phase air clearances
    C.1 Breakdown voltage versus cumulative flashover
        probability - single insulation and 100 parallel
        insulations
    F.1 Corona damping constant Kco
    F.2 Factor A for various overhead lines
    G.1 Typical gap factors K for switching impulse breakdown
        phase-to-earth
    G.2 Gap factors for typical phase-to-phase geometries
    H.1 Summary of minimum required withstand voltages obtained
        for example H.1.1
    H.2 Summary of required withstand voltages obtained for
        example H.1.2
    H.3 Values related to the insulation co-ordination
        procedure for example H.3
    Figures
    1 Range of 2% slow-front overvoltages at the receiving end
        due to line energization and re-energization
    2 Ratio between the 2% values of slow-front overvoltages
        phase-to-phase and phase-to-earth
    3 Diagram for surge arrester connection to the
        protected object
    4 Distributive discharge probability of self-restoring
        insulation described on a linear scale
    5 Disruptive discharge probability of self-restoring
        insulation described on a Gaussian scale
    6 Evaluation of deterministic co-ordination factor Kcd
    7 Evaluation of the risk of failure
    8 Risk of failure of external insulation for slow-front
        overvoltages as a function of the statistical co-
        ordination factor Kcs
    9 Dependence of exponent m on the co-ordination switching
        impulse withstand voltage
    10 Probability P of an equipment to pass the test dependent
        on the difference K between the actual and the rated
        impulst withstand voltage
    11 Example of a schematic substation layout used for the
        overvoltage stress location (see 7.1)
    B.1 Earth-fault factor k on a base ofXo/X1 for R1/X1=0
    B.2 Relationship between Ro/X1 for constant values of
        earth-fault factor k where R1 = 0
    B.3 Relationship between Ro/X1 et Xo/X1 for constant values
        of earth-fault factor k where R1 - 0.5 X1
    B.4 Relationship between Ro/X1 et Xo/X1 for constant values of
        earth-fault factor k where R1 = X1
    B.5 Relationship between Ro/X1 et Xo/X1 for constant values
        of earth-fault k where R1 = X1
    C.1 Conversion chart for the reduction of the withstand
        voltage due to phasing insulation configurations in
        parallel
    D.1 Example for bivariate phase-to-phase overvoltage curves
        with constant probability density and tangents giving
        the relevant 2% values
    D.2 Principle of the determination of the representative
        phase-to-phase overvoltage Upre
    D.3 Schematic phase-phase-earth insulation configuration
    D.4 Description of the 50% switching impulse flashover
        voltage of a phase-phase-earth insulation
    D.5 Inclination angle of the phase-to-phase insulation
        characteristic in range b dependent on the ratio of
        the phase-phase-clearance D to the height Ht above earth
    E.1 Distributed capacitances of the windings of a transformer
        and the equivalent circuit describing the windings
    E.2 Values of factor J describing the effect of the
        winding connections rn the inductive surge transference
    Annexes
    A Clearances in air to assure a specified impulse withstand
        voltage installation
    B Determination of temporary overvoltages due to earth
        faults
    C Weibull probability distributions
    D Determination of the representative slow-front over-
        voltage due to line energization and re-energization
    E transferred overvoltages in transformers
    F Lightning overvoltages
    G Calculation of air gap breakdown strength from
        experimental data
    H Examples of insulation co-ordination procedure
    J Bibliography
    ZA (normative) Normative references to international
        publications with their corresponding European
        publications

    Abstract - (Show below) - (Hide below)

    Gives guidance for the determination of the rated withstand voltages for ranges I and II of EN 60071-1 and justifies the association of these rated values with the standardized highest voltages for equipment. It covers phase-to-phase, phase-to-earth and longitudinal insulation of three-phase systems with nominal voltages above 1kV

    General Product Information - (Show below) - (Hide below)

    Committee CLC/SR 28
    Development Note Redesignated as EN IEC 60071-2. (05/2018)
    Document Type Standard
    Publisher European Committee for Standards - Electrical
    Status Superseded
    Superseded By
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    UNE-EN 50124-1:2017 Railway applications - Insulation coordination - Part 1: Basic requirements - Clearances and creepage distances for all electrical and electronic equipment
    UNE-EN 50341-1:2017 Overhead electrical lines exceeding AC 1 kV - Part 1: General requirements - Common specifications
    BS EN 61869-1:2009 Instrument transformers General requirements
    BS EN 50341-2-20:2015 Overhead electrical lines exceeding AC 45 kV National Normative Aspects (NNA) for ESTONIA (based on EN 50341-1:2012)
    UNE-EN 61400-24:2011 Wind turbines - Part 24: Lightning protection
    BS EN 60143-4:2010 Series capacitors for power systems Thyristors controlled series capacitors
    BS EN 62823:2015 Thyristor valves for thyristor controlled series capacitors (TCSC). Electrical testing
    BS EN 61000-2-12:2003 Electromagnetic compatibility (EMC). Environment Compatibility levels for low-frequency conducted disturbances and signalling in public medium-voltage power supply systems
    I.S. EN 50341-1:2012 OVERHEAD ELECTRICAL LINES EXCEEDING AC 1 KV - PART 1: GENERAL REQUIREMENTS - COMMON SPECIFICATIONS
    15/30298489 DC : 0 BS EN 50124-1 - RAILWAY APPLICATIONS - INSULATION COORDINATION - PART 1: BASIC REQUIREMENTS - CLEARANCES AND CREEPAGE DISTANCES FOR ALL ELECTRICAL AND ELECTRONIC EQUIPMENT
    CEI EN 62252 : 2005 MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - RADAR FOR CRAFT NOT IN COMPLIANCE WITH IMO SOLAS CHAPTER V - PERFORMANCE REQUIREMENTS, METHODS OF TEST AND REQUIRED TEST RESULTS
    I.S. EN 60143-4:2010 SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS
    I.S. EN 50110-1:2013 OPERATION OF ELECTRICAL INSTALLATIONS - PART 1: GENERAL REQUIREMENTS
    EN 62271-1:2017 High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear
    I.S. EN 60071-5:2015 INSULATION CO-ORDINATION - PART 5: PROCEDURES FOR HIGH-VOLTAGE DIRECT CURRENT (HVDC) CONVERTER STATIONS
    BS EN 50341-1:2012 Overhead electrical lines exceeding AC 1 kV General requirements. Common specifications
    UNE-EN 60099-4:2016 Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems
    BS EN 60204-11 : 2001 SAFETY OF MACHINERY - ELECTRICAL EQUIPMENT OF MACHINES - PART 11: REQUIREMENTS FOR HV EQUIPMENT FOR VOLTAGES ABOVE 1000 V A.C. OR 1500 V D.C. AND NOT EXCEEDING 36 KV
    I.S. EN 60945:2002 MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - GENERAL REQUIREMENTS - METHODS OF TESTING AND REQUIRED TEST RESULTS
    I.S. EN 50124-1:2017 RAILWAY APPLICATIONS - INSULATION COORDINATION - PART 1: BASIC REQUIREMENTS - CLEARANCES AND CREEPAGE DISTANCES FOR ALL ELECTRICAL AND ELECTRONIC EQUIPMENT
    I.S. EN 61000-2-12:2003 ELECTROMAGNETIC COMPATIBILITY (EMC) - ENVIRONMENT - COMPATIBILITY LEVELS FOR LOW-FREQUENCY CONDUCTED DISTURBANCES AND SIGNALLING IN PUBLIC MEDIUM-VOLTAGE POWER SUPPLY SYSTEMS
    UNE-EN 61140:2017 Protection against electric shock - Common aspects for installation and equipment
    EN 60071-5:2015 Insulation co-ordination - Part 5: Procedures for high-voltage direct current (HVDC) converter stations
    EN 60099-4:2014 Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems
    EN 60071-1:2006/A1:2010 INSULATION CO-ORDINATION - PART 1: DEFINITIONS, PRINCIPLES AND RULES
    EN 62271-109:2009/A1:2013 HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 109: ALTERNATING-CURRENT SERIES CAPACITOR BY-PASS SWITCHES (IEC 62271-109:2008/A1:2013)
    HD 637 S1:1999/corrigendum:2005 POWER INSTALLATIONS EXCEEDING 1 KV A.C.
    EN 60204-11:2000/corrigendum:2010 SAFETY OF MACHINERY - ELECTRICAL EQUIPMENT OF MACHINES - PART 11: REQUIREMENTS FOR HV EQUIPMENT FOR VOLTAGES ABOVE 1000 V A.C. OR 1500 V D.C. AND NOT EXCEEDING 36 KV
    EN 60143-1:2015/AC:2017-05 Series capacitors for power systems - Part 1: General
    EN 61000-2-12:2003 Electromagnetic compatibility (EMC) - Part 2-12: Environment - Compatibility levels for low-frequency conducted disturbances and signalling in public medium-voltage power supply systems
    EN 60945:2002 Maritime navigation and radiocommunication equipment and systems - General requirements - Methods of testing and required test results
    EN 61230:2008 LIVE WORKING - PORTABLE EQUIPMENT FOR EARTHING OR EARTHING AND SHORT-CIRCUITING
    PREN 50124-1 : DRAFT 2015 RAILWAY APPLICATIONS - INSULATION COORDINATION - PART 1: BASIC REQUIREMENTS - CLEARANCES AND CREEPAGE DISTANCES FOR ALL ELECTRICAL AND ELECTRONIC EQUIPMENT
    BS EN 50186-1:1999 Live-line washing systems for power installations with nominal voltages above 1 kV Common requirements
    I.S. EN 60726:2003 DRY-TYPE POWER TRANSFORMERS
    CEI EN 60945 : 2003 MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - GENERAL REQUIREMENTS - METHODS OF TESTING AND REQUIRED TEST RESULTS
    I.S. EN 61071:2007 CAPACITORS FOR POWER ELECTRONICS
    EN 50341-2-20:2015 Overhead electrical lines exceeding AC 1 kV - Part 2-20: National Normative Aspects (NNA) for ESTONIA (based on EN 50341-1:2012)
    CEI EN 60099-5 : 2014 SURGE ARRESTERS - PART 5: SELECTION AND APPLICATION RECOMMENDATIONS
    EN 50124-1:2017 Railway applications - Insulation coordination - Part 1: Basic requirements - Clearances and creepage distances for all electrical and electronic equipment
    CLC/TR 50488:2006 Railway applications - Safety measures for the personnel working on or near overhead contact lines
    CEI EN 60099-4 : 2015 SURGE ARRESTERS - PART 4: METAL-OXIDE SURGE ARRESTERS WITHOUT GAPS FOR A.C. SYSTEMS
    CEI EN 60143-4 : 2012 SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS
    EN 61936-1 : 2010 AMD 1 2014 POWER INSTALLATIONS EXCEEDING 1 KV A.C. - PART 1: COMMON RULES (IEC 61936-1:2010/A1:2014)
    EN 50341-1:2012 Overhead electrical lines exceeding AC 1 kV - Part 1: General requirements - Common specifications
    I.S. EN 60099-4:2014 SURGE ARRESTERS - PART 4: METAL-OXIDE SURGE ARRESTERS WITHOUT GAPS FOR A.C. SYSTEMS
    VDE 0674-1 : 2001-12 TESTS ON INDOOR AND OUTDOOR POST INSULATORS OF CERAMIC MATERIAL OR GLASS FOR SYSTEMS WITH NOMINAL VOLTAGES GREATER THAN 1 KV
    DIN EN 50186-1 : 1999 LIVE-LINE WASHING SYSTEMS FOR POWER INSTALLATIONS WITH RATED VOLTAGES ABOVE 1 KV - PART 1: GENERAL REQUIREMENTS
    DIN IEC/TR 62543 : 2018 HIGH-VOLTAGE DIRECT CURRENT (HVDC) POWER TRANSMISSION USING VOLTAGE SOURCED CONVERTERS (VSC) (IEC/TR 62543:2011 + A1:2013 + A2:2017)
    DIN EN 60168 : 2001-12 TESTS ON INDOOR AND OUTDOOR POST INSULATORS OF CERAMIC MATERIAL OR GLASS FOR SYSTEMS WITH NOMINAL VOLTAGES GREATER THAN 1 KV
    VDE 0553-543 : 2018 HIGH-VOLTAGE DIRECT CURRENT (HVDC) POWER TRANSMISSION USING VOLTAGE SOURCED CONVERTERS (VSC) (IEC/TR 62543:2011 + A1:2013 + A2:2017)
    EN 60529:1991/AC:2016-12 DEGREES OF PROTECTION PROVIDED BY ENCLOSURES (IP CODE) (IEC 60529 EDITION 2.2 CORRIGENDUM 2:2015)
    CEI EN 50110-1 : 2014 OPERATION OF ELECTRICAL INSTALLATIONS - PART 1: GENERAL REQUIREMENTS
    UNE-EN 60071-5:2015 Insulation co-ordination - Part 5: Procedures for high-voltage direct current (HVDC) converter stations
    I.S. EN 62252:2004 MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - RADAR FOR CRAFT NOT IN COMPLIANCE WITH IMO SOLAS CHAPTER 5 - PERFORMANCE REQUIREMENTS, METHODS OF TEST AND REQUIRED TEST RESULTS
    BS EN 62271-1:2017 High-voltage switchgear and controlgear Common specifications for alternating current switchgear and controlgear
    I.S. EN 61140:2016 PROTECTION AGAINST ELECTRIC SHOCK - COMMON ASPECTS FOR INSTALLATION AND EQUIPMENT
    I.S. EN 60099-9:2014 SURGE ARRESTERS - PART 9: METAL-OXIDE SURGE ARRESTERS WITHOUT GAPS FOR HVDC CONVERTER STATIONS
    CEI EN 50341-1 : 2013 OVERHEAD ELECTRICAL LINES EXCEEDING AC 1 KV - PART 1: GENERAL REQUIREMENTS - COMMON SPECIFICATIONS
    CEI EN 60871-1 : 2015 SHUNT CAPACITORS FOR A.C. POWER SYSTEMS HAVING A RATED VOLTAGE ABOVE 1000 V - PART 1: GENERAL
    UNE-EN 61472:2014 Live working - Minimum approach distances for a.c systems in the voltage range 72,5 kV to 800 kV - A method of calculation
    I.S. EN 60204-11:2000 SAFETY OF MACHINERY - ELECTRICAL EQUIPMENT OF MACHINES PART 11: REQUIREMENTS FOR HV EQUIPMENT FOR VOLTAGES ABOVE 1000 V A.C. OR 1500 V D.C. AND NOT EXCEEDING 36 KV
    EN 62823:2015 Thyristor valves for thyristor controlled series capacitors (TCSC) - Electrical testing
    UNE-EN 61869-1:2010 Instrument transformers -- Part 1: General requirements
    UNE-EN 62271-100:2011 High-voltage switchgear and controlgear -- Part 100: Alternating-current circuit-breakers
    I.S. EN 50341-2-20:2015 OVERHEAD ELECTRICAL LINES EXCEEDING AC 45 KV - PART 2-20: NATIONAL NORMATIVE ASPECTS (NNA) FOR ESTONIA (BASED ON EN 50341-1:2012)
    BS EN 60071-5:2015 Insulation co-ordination Procedures for high-voltage direct current (HVDC) converter stations
    12/30260570 DC : 0 BS EN 50341-1 - OVERHEAD ELECTRICAL LINES EXCEEDING AC 1 KV - PART 1: GENERAL REQUIREMENTS - COMMON SPECIFICATIONS
    CEI EN 61400-24 : 2011 WIND TURBINES - PART 24: LIGHTNING PROTECTION
    BS EN 60945:2002 Maritime navigation and radiocommunication equipment and systems. General requirements. Methods of testing and required test results
    BS EN 50110-1:2013 Operation of electrical installations General requirements
    BS EN 61071:2007 Capacitors for power electronics
    CEI CLC/TR 50488 : 2007 RAILWAY APPLICATIONS - SAFETY MEASURES FOR PERSONNEL WORKING NEAR OVERHEAD CONTACT LINES
    BS EN 62252:2004 Maritime navigation and radiocommunication equipment and systems. Radar for craft not in compliance with IMO SOLAS Chapter V. Performance requirements methods of test and required test results
    BS EN 60099-9:2014 Surge arresters Metal-oxide surge arresters without gaps for HVDC converter stations
    BS EN 60099-5:2013 Surge arresters Selection and application recommendations
    UNE-EN 50110-1:2014 Operation of electrical installations - Part 1: General requirements
    I.S. EN 62823:2015 THYRISTOR VALVES FOR THYRISTOR CONTROLLED SERIES CAPACITORS (TCSC) - ELECTRICAL TESTING
    EN 62271-100 : 2009 AMD 2/COR 18 HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 100: ALTERNATING-CURRENT CIRCUIT-BREAKERS (IEC 62271-100:2008/A2:2017/COR1:2018)
    S.R. CLC/TR 50488:2007 RAILWAY APPLICATIONS - SAFETY MEASURES FOR THE PERSONNEL WORKING ON OR NEAR OVERHEAD CONTACT LINES
    VDE 0143-1 : 1999 LIVE-LINE WASHING SYSTEMS FOR POWER INSTALLATIONS WITH RATED VOLTAGES ABOVE 1 KV - PART 1: GENERAL REQUIREMENTS
    I.S. EN 61936-1:2010 POWER INSTALLATIONS EXCEEDING 1 KV A.C. - PART 1: COMMON RULES
    I.S. EN 60071-1:2006 INSULATION CO-ORDINATION - PART 1: DEFINITIONS, PRINCIPLES AND RULES
    I.S. EN 60099-5:2013 SURGE ARRESTERS - PART 5: SELECTION AND APPLICATION RECOMMENDATIONS (IEC 60099-5:2013 (EQV))
    BS EN 61140 : 2002 PROTECTION AGAINST ELECTRIC SHOCK - COMMON ASPECTS FOR INSTALLATION AND EQUIPMENT
    BS EN 61936-1 : 2010 POWER INSTALLATIONS EXCEEDING 1 KV A.C - PART 1: COMMON RULES
    UNE-EN 61936-1:2012 Power installations exceeding 1 kV a.c. -- Part 1: Common rules
    PREN 50341-1 : DRAFT 2012 OVERHEAD ELECTRICAL LINES EXCEEDING AC 1 KV - PART 1: GENERAL REQUIREMENTS - COMMON SPECIFICATIONS
    EN IEC 60099-5:2018 Surge arresters - Part 5: Selection and application recommendations
    BS EN 61472:2013 Live working. Minimum approach distances for a.c systems in the voltage range 72,5 kV to 800 kV. A method of calculation
    CEI EN 61071 : 2007 CAPACITORS FOR POWER ELECTRONICS
    BS EN 61230:2008 Live working. Portable equipment for earthing or earthing and short-circuiting
    BS EN 60143-1:2015 Series capacitors for power systems General
    BS EN 50124-1:2017 Railway applications. Insulation coordination Basic requirements. Clearances and creepage distances for all electrical and electronic equipment
    I.S. EN 60529:1993 DEGREES OF PROTECTION PROVIDED BY ENCLOSURES (IP CODE)
    I.S. EN IEC 60099-5:2018 SURGE ARRESTERS - PART 5: SELECTION AND APPLICATION RECOMMENDATIONS
    BS EN 61400-24:2010 Wind turbines Lightning protection
    I.S. EN 60143-1:2015 SERIES CAPACITORS FOR POWER SYSTEMS - PART 1: GENERAL
    CEI EN 60099-9 : 2015 SURGE ARRESTERS - PART 9: METAL-OXIDE SURGE ARRESTERS WITHOUT GAPS FOR HVDC CONVERTER STATIONS
    BS EN 60099-4:2014 Surge arresters Metal-oxide surge arresters without gaps for a.c. systems
    I.S. EN 61400-24:2010 WIND TURBINES - PART 24: LIGHTNING PROTECTION
    BS EN 60071-1 : 2006 INSULATION CO-ORDINATION - PART 1: DEFINITIONS, PRINCIPLES AND RULES
    I.S. HD 637:1999 POWER INSTALLATIONS EXCEEDING 1 KV A.C.
    I.S. EN 62271-1:2017 HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 1: COMMON SPECIFICATIONS FOR ALTERNATING CURRENT SWITCHGEAR AND CONTROLGEAR
    I.S. EN 62271-100:2009 HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 100: ALTERNATING-CURRENT CIRCUIT-BREAKERS
    I.S. EN 62271-109:2009 HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 109: ALTERNATING-CURRENT SERIES CAPACITOR BY-PASS SWITCHES (IEC 62271-109:2008 (EQV))
    EN 61140:2016 Protection against electric shock - Common aspects for installation and equipment
    EN 61869-1:2009 Instrument transformers - Part 1: General requirements
    EN 60099-9:2014 Surge arresters - Part 9: Metal-oxide surge arresters without gaps for HVDC converter stations
    EN 60143-4 : 2010 SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS
    EN 62252:2004 Maritime navigation and radiocommunication equipment and systems - Radar for craft not in compliance with IMO SOLAS Chapter V - Performance requirements, methods of test and required test results
    EN 61400-24:2010 Wind turbines - Part 24: Lightning protection
    EN 61472:2013/AC:2015 LIVE WORKING - MINIMUM APPROACH DISTANCES FOR A.C SYSTEMS IN THE VOLTAGE RANGE 72,5 KV TO 800 KV - A METHOD OF CALCULATION (IEC 61472:2013)
    EN 61071:2007 Capacitors for power electronics
    EN 50110-1:2013 Operation of electrical installations - Part 1: General requirements
    EN 60099-5:2013 Surge arresters - Part 5: Selection and application recommendations

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 60099-4:2014 Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems
    IEC 60056:1987 High-voltage alternating-current circuit-breakers
    IEC 60505:2011 Evaluation and qualification of electrical insulation systems
    IEC 60099-1:1991+AMD1:1999 CSV Surge arresters - Part 1: Non-linear resistor type gapped surge arresters for a.c. systems
    IEC 60099-5:2013 Surge arresters - Part 5: Selection and application recommendations
    IEC 60060-1:2010 High-voltage test techniques - Part 1: General definitions and test requirements
    IEC 60507:2013 Artificial pollution tests on high-voltage ceramic and glass insulators to be used on a.c. systems
    IEC 60071-1:2006+AMD1:2010 CSV Insulation co-ordination - Part 1: Definitions, principles and rules
    IEC 60721-2-3:2013 Classification of environmental conditions - Part 2-3: Environmental conditions appearing in nature - Air pressure
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective