CLC/TS 50562:2011
|
Railway applications - Fixed installations - Process, measures and demonstration of safety for electric traction systems |
CEI CLC/TS 50562 : 2012
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PROCESS, MEASURES AND DEMONSTRATION OF SAFETY FOR ELECTRIC TRACTION SYSTEMS |
CEI CLC/TS 61850-80-1 : 2012
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED DATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104 |
EN 61400-25-4:2017
|
Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
EN 60870-5-6:2009
|
Telecontrol equipment and systems - Part 5-6: Guidelines for conformance testing for the EN 60870-5 companion standards |
EN 61850-7-420:2009
|
Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
EN 50562:2018
|
Railway applications - Fixed installations - Process, protective measures and demonstration of safety for electric traction systems |
PD CLC/TR 50608:2013
|
Smart grid projects in Europe |
16/30314785 DC : 0
|
BS EN 50562 - RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PROCESS, PROTECTIVE MEASURES AND DEMONSTRATION OF SAFETY FOR ELECTRIC TRACTION SYSTEMS |
CEI EN 62689-1 : 1ED 2017
|
CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS |
S.R. CLC/TS 50549-2:2015
|
REQUIREMENTS FOR GENERATING PLANTS TO BE CONNECTED IN PARALLEL WITH DISTRIBUTION NETWORKS - PART 2: CONNECTION TO A MV DISTRIBUTION NETWORK |
I.S. EN 62689-1:2016
|
CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS |
S.R. CLC/TR 50608:2013
|
SMART GRID PROJECTS IN EUROPE |
CLC/TS 61850-80-1:2010
|
Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
CEI EN 61400-25-4 : 2009
|
WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
DD CLC/TS 61850-80-1:2010
|
Communication networks and systems for power utility automation Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
I.S. EN 50562:2018
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PROCESS, PROTECTIVE MEASURES AND DEMONSTRATION OF SAFETY FOR ELECTRIC TRACTION SYSTEMS |
EN 62689-1:2016
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements |
DD CLC/TS 50562:2011
|
Railway applications. Fixed Installations. Process, measures and demonstration of safety for electric traction systems |
CLC/TS 50549-2:2015
|
Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network |
S.R. CLC/TS 50562:2011
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PROCESS, MEASURES AND DEMONSTRATION OF SAFETY FOR ELECTRIC TRACTION SYSTEMS |
PREN 50562 : DRAFT 2016
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PROCESS, PROTECTIVE MEASURES AND DEMONSTRATION OF SAFETY FOR ELECTRIC TRACTION SYSTEMS |
CEI CLC/TR 50608 : 2014
|
SMART GRID PROJECTS IN EUROPE |
S.R. CLC/TS 61850-80-1:2010
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED ATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104 |
BS EN 60870-5-6:2009
|
Marine energy. Wave, tidal and other water current converters Scale testing of tidal stream energy systems |
BS EN 62689-1:2016 (published 2017-01)
|
Current and voltage sensors or detectors, to be used for fault passage indication purposes General principles and requirements |
I.S. EN 61400-25-4:2017
|
WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE |
BS EN 61850-7-420:2009
|
Communication networks and systems for power utility automation Basic communication structure. Distributed energy resources logical nodes |
I.S. EN 61850-7-420:2009
|
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES |
CLC/TR 50608 : 2013
|
SMART GRID PROJECTS IN EUROPE |