• Shopping Cart
    There are no items in your cart

EN 61064:1993

Current

Current

The latest, up-to-date edition.

Acceptance tests for steam turbine speed control systems

Published date

11-02-1993

Sorry this product is not available in your region.

Cooperating organizations
National foreword
Foreword
1 Scope and object
2 Normative reference
3 Terms, symbols, definitions and units
4 Guiding principles
4.1 Matters on which agreement shall be reached
4.2 Time of carrying out tests
4.3 Preparation for acceptance tests
4.4 Instruments
4.5 Test report
5 Speed governing system tests
5.1 Turbine at standstill
5.2 Turbine at no-load
5.2.1 Overview
5.2.2 Test procedure for determination of static
        characteristics
5.2.3 Determination of dead band
5.2.4 Speed range determination
5.2.5 Stability
5.3 Turbine on load
5.3.1 Overview
5.3.2 Test conditions
5.3.3 Load-steam flow demand relationship
5.3.4 Dead band determination - Overview
5.3.5 Dead band determination - Method 1
5.3.6 Dead band determination - Method 2
5.3.7 Determination of steady-state speed regulation -
        Method 1
5.3.8 Determination of steady-state speed regulation -
        Method 2
5.3.9 Determination of incremental speed regulation -
        Method 1
5.3.10 Determination of incremental speed regulation -
        Method 2
5.3.11 Stability
5.4 Dynamic tests of the speed governing system by
        sudden load rejection to no-load
5.4.1 Overview
5.4.2 Operating conditions
5.4.3 Test procedure
5.4.4 Test results
5.4.5 Stability
6 Overspeed protection system tests
6.1 Turbine at standstill
6.2 Turbine at no-load
6.3 Turbine on load
6.4 Dynamic testing of overspeed protection system
        by turbine trip from maximum load
6.4.1 Overview
6.4.2 Operating conditions
6.4.3 Test procedure
6.4.4 Test results
Annex
A General guidance
Figures
National annex NA (informative) Committees responsible
National annex NB (informative) Cross-references

Contains recommendations for the conduct of tests of speed control systems of steam turbines. Applies primarily to constant speed steam turbines but may be applied where appropriate for other types of turbines. The purpose of the tests described in this publication is to verify the criteria guaranteed by the manufacturer and to check compliance with EN 60045-1.

Committee
CLC/SR 5
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Current

Standards Relationship
PN EN 61064 : 1998 Identical
NBN EN 61064 : 1994 Identical
I.S. EN 61064:1993 Identical
NEN 11064 : 1994 Identical
UNE-EN 61064:1992 Identical
SN EN 61064 : 1993 Identical
CEI EN 61064 : 1996 Identical
NF EN 61064 : 1993 Identical
BS EN 61064:1993 Identical
IEC 61064:1991 Corresponds

CEI EN 60045-1 : 1996 STEAM TURBINES - PART 1: SPECIFICATIONS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.