EN 61158-5-7:2008
Current
The latest, up-to-date edition.
Industrial communication networks - Fieldbus specifications - Part 5-7: Application layer service definition - Type 7 elements
07-03-2008
INTRODUCTION
1 Scope
1.1 Overview
1.2 Specifications
1.3 Conformance
2 Normative references
3 Terms, definitions, symbols, abbreviations and conventions
3.1 ISO/IEC 7498-1 terms
3.2 ISO/IEC 8822 terms
3.3 ISO/IEC 9545 terms
3.4 ISO/IEC 8824 terms
3.5 Fieldbus data-link layer terms
3.6 Fieldbus application layer specific definitions
3.7 Abbreviations and symbols
3.8 Conventions
4 Concepts
5 Data type ASE
5.1 Overview
5.2 Formal definition of data type objects
5.3 FAL defined data types
6 Communication model specification
6.1 Concepts
6.2 ASEs
6.3 ARs
Annex ZA (normative) - Normative references to international
publications with their corresponding European
publications
Bibliography
It provides user programs with a means to access the fieldbus communication environment. In this respect, the FAL can be viewed as a 'window between corresponding application programs.' This standard provides common elements for basic time-critical and non-time-critical messaging communications between application programs in an automation environment. The term 'time-critical' is used to represent the presence of a time-window, within which one or more specified actions are required to be completed with some defined level of certainty. Failure to complete specified actions within the time window risks failure of the applications requesting the actions, with attendant risk to equipment, plant and possibly human life. It includes the following significant changes with respect to the previous edition deletion of the former Type 6 fieldbus, and the placeholder for a Type 5 fieldbus data-link layer, for lack of market relevance; addition of new types of fieldbuses; division of this part into multiple parts numbered.
| Committee |
CLC/TC 65X
|
| DevelopmentNote |
Together with EN 61158-5-16, EN 61158-5-17, EN 61158-5-18, EN 61158-5-19, EN 61158-5-20, EN 61158-5-8, EN 61158-5-9, EN 61158-5-10, EN 61158-5-11, EN 61158-5-12, EN 61158-5-13, EN 61158-5-14, EN 61158-5-15, EN 61158-5-3, EN 61158-5-4, EN 61158-5-5 and EN 61158-5-2 supersedes EN 61158-5. (05/2008)
|
| DocumentType |
Standard
|
| PublisherName |
European Committee for Standards - Electrical
|
| Status |
Current
|
| Supersedes |
| Standards | Relationship |
| IEC 61158-5-7:2007 | Identical |
| NF EN 61158-5-7 : 2016 | Identical |
| NBN EN 61158-5-7 : 2008 | Identical |
| NEN EN IEC 61158-5-7 : 2008 | Identical |
| I.S. EN 61158-5-7:2008 | Identical |
| PN EN 61158-5-7 : 2008 | Identical |
| BS EN 61158-5-7:2008 | Identical |
| CEI EN 61158-5-7 : 2009 | Identical |
| DIN EN 61158-5-7:2008-09 | Identical |
| UNE-EN 61158-5-7:2008 | Identical |