• EN 61869-2 : 2012

    Current The latest, up-to-date edition.

    INSTRUMENT TRANSFORMERS - PART 2: ADDITIONAL REQUIREMENTS FOR CURRENT TRANSFORMERS

    Available format(s): 

    Language(s): 

    Published date:  16-11-2012

    Publisher:  European Committee for Standards - Electrical

    Pure ENs are not available for sale, please purchase a suitable national adoption

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    1 Scope
    2 Normative references
    3 Terms and definitions
    5 Ratings
    6 Design and construction
    7 Tests
    Annex 2A (normative) - Protective current transformers
             classes P, PR
    Annex 2B (normative) - Protective current transformer
             classes for transient performance
    Annex 2C (normative) - Proof of low-leakage reactance
             type
    Annex 2D (informative) - Technique used in temperature
             rise test of oil-immersed transformers to determine
             the thermal constant by an experimental estimation
    Annex 2E (informative) - Alternative measurement of the
             ratio error (varepsilon)
    Annex 2F (normative) - Determination of the turns ratio
             error
    Annex ZA (normative) - Normative references to
             international publications with their
             corresponding European publications

    Abstract - (Show below) - (Hide below)

    IEC 61869-2:2012 is applicable to newly manufactured inductive current transformers for use with electrical measuring instruments and/or electrical protective devices having rated frequencies from 15 Hz to 100 Hz.

    General Product Information - (Show below) - (Hide below)

    Committee TC 38
    Development Note To be read in conjunction with EN 61869-1. Supersedes EN 60044-1 and EN 60044-6. (11/2012)
    Document Type Standard
    Publisher European Committee for Standards - Electrical
    Status Current
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    CEI EN 61869-6 : 1ED 2017 INSTRUMENT TRANSFORMERS - PART 6: ADDITIONAL GENERAL REQUIREMENTS FOR LOW-POWER INSTRUMENT TRANSFORMERS
    BS EN 60255-121:2014 Measuring relays and protection equipment Functional requirements for distance protection
    EN 61400-12-1:2017 Wind energy generation systems - Part 12-1: Power performance measurement of electricity producing wind turbines
    PREN 50152-3-2 : DRAFT 2015 RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR A.C. SWITCHGEAR - PART 3-2: MEASUREMENT, CONTROL AND PROTECTION DEVICES FOR SPECIFIC USE IN A.C. TRACTION SYSTEMS - SINGLE-PHASE CURRENT TRANSFORMERS
    I.S. EN 60255-121:2014 MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 121: FUNCTIONAL REQUIREMENTS FOR DISTANCE PROTECTION
    I.S. EN 61869-6:2016 INSTRUMENT TRANSFORMERS - PART 6: ADDITIONAL GENERAL REQUIREMENTS FOR LOW-POWER INSTRUMENT TRANSFORMERS
    EN 60255-121:2014 Measuring relays and protection equipment - Part 121: Functional requirements for distance protection
    EN 61869-4:2014/AC:2014 INSTRUMENT TRANSFORMERS - PART 4: ADDITIONAL REQUIREMENTS FOR COMBINED TRANSFORMERS (IEC 61869-4:2013)
    EN 61869-6:2016 Instrument transformers - Part 6: Additional general requirements for low-power instrument transformers
    EN 50152-3-2:2016 Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 3-2: Measurement, control and protection devices for specific use in a.c. traction systems - Current transformers
    BS EN 62053-24 : 2015 ELECTRICITY METERING EQUIPMENT (A.C.) - PARTICULAR REQUIREMENTS - PART 24: STATIC METERS FOR REACTIVE ENERGY AT FUNDAMENTAL FREQUENCY (CLASSES 0,5 S, 1 S AND 1) (IEC 62053-24:2014)
    BS EN 61869-4:2014 Instrument transformers Additional requirements for combined transformers
    CEI EN 61869-4 : 2014 INSTRUMENT TRANSFORMERS - PART 4: ADDITIONAL REQUIREMENTS FOR COMBINED TRANSFORMERS
    CEI EN 60255-121 : 2014 MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 121: FUNCTIONAL REQUIREMENTS FOR DISTANCE PROTECTION
    BS EN 61869-6:2016 INSTRUMENT TRANSFORMERS - PART 6: ADDITIONAL GENERAL REQUIREMENTS FOR LOW-POWER INSTRUMENT TRANSFORMERS
    BS EN IEC 61400-12-2:2013 Wind turbines Power performance of electricity-producing wind turbines based on nacelle anemometry
    I.S. EN 61400-12-2:2013 WIND TURBINES - PART 12-2: POWER PERFORMANCE OF ELECTRICITYPRODUCING WIND TURBINES BASED ON NACELLE ANEMOMETRY
    I.S. EN 60076-19:2015 POWER TRANSFORMERS - PART 19: RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS
    I.S. EN 50152-3-2:2016 RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR A.C. SWITCHGEAR - PART 3-2: MEASUREMENT, CONTROL AND PROTECTION DEVICES FOR SPECIFIC USE IN A.C. TRACTION SYSTEMS - SINGLE-PHASE CURRENT TRANSFORMERS
    I.S. EN 61400-12-1:2017 WIND POWER GENERATION SYSTEMS - PART 12-1: POWER PERFORMANCE MEASUREMENT OF ELECTRICITY PRODUCING WIND TURBINES
    UNE-EN 60076-19:2016 Power transformers - Part 19: Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors
    UNE-EN 50152-3-2:2016 Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 3-2: Measurement, control and protection devices for specific use in a.c. traction systems - Current transformers
    15/30314792 DC : 0 BS EN 50152-3-2 - RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR A.C. SWITCHGEAR - PART 3-2: MEASUREMENT, CONTROL AND PROTECTION DEVICES FOR SPECIFIC USE IN A.C. TRACTION SYSTEMS - SINGLE-PHASE CURRENT TRANSFORMERS
    BS EN 61400-12-1:2017 Wind power generation systems Power performance measurement of electricity producing wind turbines
    EN 62689-1:2016 Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements
    UNE-EN 61869-4:2017 Instrument transformers - Part 4: Additional requirements for combined transformers
    CEI EN 61400-12-2 : 2013 WIND TURBINES - PART 12-2: POWER PERFORMANCE OF ELECTRICITY PRODUCING WIND TURBINES BASED ON NACELLE ANEMOMETRY
    CEI EN 50152-3-2 : 2001 RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR A.C. SWITCHGEAR - PART 3-2: MEASUREMENT, CONTROL AND PROTECTION DEVICES FOR SPECIFIC USE IN A.C. TRACTION SYSTEMS - CURRENT TRANSFORMERS
    CEI EN 61400-12-1 : 2007 WIND POWER GENERATION SYSTEMS - PART 12-1: POWER PERFORMANCE MEASUREMENT OF ELECTRICITY PRODUCING WIND TURBINES
    BS EN 62689-1:2016 Current and voltage sensors or detectors, to be used for fault passage indication purposes General principles and requirements
    I.S. EN 61869-4:2014 INSTRUMENT TRANSFORMERS - PART 4: ADDITIONAL REQUIREMENTS FOR COMBINED TRANSFORMERS
    I.S. EN 62689-1:2016 CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS
    EN 61400-12-2:2013/AC:2016-10 WIND TURBINES - PART 12-2: POWER PERFORMANCE OF ELECTRICITYPRODUCING WIND TURBINES BASED ON NACELLE ANEMOMETRY (IEC 61400-12-2:2013/COR1:2016)
    UNE-EN 50152-3-3:2016 Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 3-3: Measurement, control and protection devices for specific use in a.c. traction systems - Voltage transformers
    BS EN 60076-19:2015 Power transformers Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors
    EN 60076-19:2015 Power transformers - Part 19: Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61869-1:2007 Instrument transformers - Part 1: General requirements
    EN 61869-1:2009 Instrument transformers - Part 1: General requirements
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective