EN 62439-5 : 2018
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP)
21-03-2022
12-01-2013
Defines a redundancy protocol that is based on the duplication of the network, the redundancy protocol being executed within the end nodes, as opposed to a redundancy protocol built in the switches.
Committee |
TC 65X
|
DevelopmentNote |
Together with EN 62439-1, EN 62439-2, EN 62439-3, EN 62439-4 and EN 62439-6 supersedes EN 62439. (04/2010) Redesignated as EN IEC 62439-5. (03/2018)
|
DocumentType |
Standard
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Withdrawn
|
Supersedes |
Standards | Relationship |
CEI EN 62439-5 : 2011 | Identical |
BS EN 62439-5:2010 | Identical |
NF EN 62439-5 : 2015 | Identical |
DIN EN 62439-5:2010-09 | Identical |
I.S. EN 62439-5:2010 | Identical |
IEC 62439-5:2016 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.