EN 62680-3 : 2013
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
UNIVERSAL SERIAL BUS INTERFACES FOR DATA AND POWER - PART 3: USB BATTERY CHARGING SPECIFICATION, REVISION 1.2 (IEC 62680-3:2013)
07-02-2022
23-10-2013
1 Introduction
2 Dead Battery Provision
3 Charging Port Detection
4 Charging Port and Portable Device Requirements
5 Parameter Values
6 Accessory Charger Adapter
Describes limits as well as detection, control and reporting mechanisms to permit devices to draw current in excess of the USB 2.0 specification for charging and/or powering up from Dedicated chargers, hosts, hubs and charging downstream ports.
Committee |
TC 100X
|
DocumentType |
Standard
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
IEC 62680-3:2013 | Identical |
NF EN 62680-3 : 2014 | Identical |
NBN EN 62680-3 : 2013 | Identical |
NEN EN IEC 62680-3 : 2013 | Identical |
I.S. EN 62680-3:2013 | Identical |
PN EN 62680-3 : 2014 | Identical |
UNE-EN 62680-3:2013 | Identical |
BS EN 62680-3:2013 | Identical |
CEI EN 62680-3 : 2014 | Identical |
DIN EN 62680-3:2014-06 | Identical |
PNE-FprEN 62680-3 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.