ENA ER G5-4 : ISSUE 4 2001
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
PLANNING LEVELS FOR HARMONIC VOLTAGE DISTORTION & THE CONNECTION OF NON-LINEAR EQUIPMENT TO TRANSMISSION SYSTEMS & DISTRIBUTION NETWORKS IN THE UNITED KINGDOM
23-07-2013
12-01-2013
Gives the procedure for connecting single and three phase non-linear loads to PES supply networks. It contains connection limits in terms of plant loading for convertors and regulations, emission limits for Consumer's loads in terms of harmonic current, and total Harmonic Voltage Distortion planning limits for supply networks operating at 132 kV and below.
DocumentType |
Standard
|
PublisherName |
Energy Networks Association (UK)
|
Status |
Superseded
|
SupersededBy |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.