• Shopping Cart
    There are no items in your cart

ENA ER G74 : ISSUE 1 1992

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

PROCEDURE TO MEET THE REQUIREMENTS OF IEC 909 FOR THE CALCULATION OF SHORT-CIRCUIT CURRENTS IN THREE-PHASE AC POWER SYSTEMS

Superseded date

10-12-2021

Superseded by

ENA ER G74 ISSUE 2:2021

Published date

12-01-2013

Sorry this product is not available in your region.

Specifies an outline procedure for a computer-based method for calculating circuit breaker short-circuit making and breaking currents in three-phase ac power systems having a nominal voltage range 380 V to 400 kV. These currents are used for assessing the adequacy of switchgear to perform the required duty. The recommended procedure is also applicable for the calculation of short-circuit currents for other purposes, such as the determination of protection relay settings or the calculation of mechanical forces arising form short- circuit currents.

DocumentType
Standard
PublisherName
Energy Networks Association (UK)
Status
Superseded
SupersededBy

ENA ER G81-4 : ISSUE 3 2016 FRAMEWORK FOR NEW INDUSTRIAL AND COMMERCIAL UNDERGROUND CONNECTIONS - PART 4: DESIGN AND PLANNING
ENA ER G81-1 : ISSUE 3 2016 FRAMEWORK FOR NEW LOW VOLTAGE HOUSING DEVELOPMENT INSTALLATIONS - PART 1: DESIGN AND PLANNING
ENA ER P25 : ISSUE 2 2018 THE SHORT-CIRCUIT CHARACTERISTICS OF SINGLE-PHASE AND THREE-PHASE LOW VOLTAGE DISTRIBUTION NETWORKS
ENA ER G83/2 : ISSUE 2 2012 RECOMMENDATIONS FOR THE CONNECTION OF TYPE TESTED SMALL-SCALE EMBEDDED GENERATORS (UP TO 16A PER PHASE) IN PARALLEL WITH LOW-VOLTAGE DISTRIBUTION SYSTEMS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.