• There are no items in your cart

ENA ER S5-1 : ISSUE 1 AMD 2 1970

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

EARTHING INSTALLATIONS IN SUBSTATIONS

Withdrawn date

23-07-2013

Published date

12-01-2013

Applies to fixed earthing installations for all substations. This wide coverage requires that all size references in the document must be related to the whole range of substations; further, because substation circumstances vary widely, it is not possible to define in voltages terms like "large", "very small", etc. These must be interpreted according to the context. In large substations the designer will often have to provide for a large earth fault current as well as a large area, thus requiring an extensive installation. In other substations little may be required if, for example, the earth fault current is relatively small and the substation serves any underground cable network which itself affords a low impedance connection with the earth. While the theoretical considerations apply to all substations, in practice much of this document relates mainly to large substations.

DocumentType
Standard
PublisherName
Energy Networks Association (UK)
Status
Withdrawn

ENA ER P24 : ISSUE 1 ADD 1 1990 AC TRACTION SUPPLIES TO BRITISH RAIL

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.