• There are no items in your cart

ENA TS 41-18 : ISSUE 2 1995

Current

Current

The latest, up-to-date edition.

PARTIAL DISCHARGE TESTING OF BUSHINGS, CAPACITORS, INSTRUMENT TRANSFORMERS AND SWITCHGEAR OF RATED VOLTAGE 7.2 - 420 KV INCLUSIVE

Published date

12-01-2013

1 Scope
2 References
3 Discharge detector
4 Test circuit
5 Measurement and calibration
6 Highest voltage for equipment Um (rated voltage)
7 Type tests
8 Routine tests
9 Test levels and limits
Tables
1 Bushings fitted to reactors and power transformers
2 Separately mounted bushings, bushings and
    insulating components fitted to switchgear
3 Capacitors fitted to switching devices and voltage
    transformers
4 Current transformers (live tank and dead tank)
5 Electromagnetic voltage transformers connected
    live to earth
6 Electromagnetic voltage transformers connected line
    to line
7 Switchgear

Details the partial discharge testing of specified equipments, following manufacture, for use on three-phase 50 Hz systems and for specified capacitor applications. It details the levels of test voltage and permissible maximum discharge magnitude, and supplements BS 4828 in respect of the test method.

DocumentType
Standard
PublisherName
Energy Networks Association (UK)
Status
Current
Supersedes

ENA TS 41-26 : ISSUE 1 AMD 4 1999 DISTRIBUTION SWITCHGEAR FOR SERVICE UP TO 36 KV (CABLE CONNECTED)
ENA TS 41-27 : ISSUE 1 AMD 3 OUTDOOR DISTRIBUTION SWITCHGEAR FOR SERVICE UP TO 36 KV (OVERHEAD CONDUCTOR CONNECTED)

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.