ENA TS 43-4 : ISSUE 2 AMD 1 1993
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
DESIGN OF FOUNDATIONS FOR STEEL TOWERS FOR OVERHEAD TRANSMISSION LINES AT 132 KV AND HIGHER VOLTAGES
Superseded date
29-03-2015
Superseded by
Published date
12-01-2013
Publisher
Sorry this product is not available in your region.
Includes standard foundations of the pyramid and augered types, non-standard foundations and special foundations.
DocumentType |
Standard
|
PublisherName |
Energy Networks Association (UK)
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
ENA TS 43-5 : ISSUE 2 AMD 1 1993 | FABRICATION AND GALVANIZING OF TOWER AND FOUNDATION STEELWORK FOR OVERHEAD TRANSMISSION LINES AT 132 KV AND HIGHER VOLTAGES |
ENA TS 43-11 : ISSUE 1 AMD 1 1996 | 400 KV STEEL TOWER TRANSMISSION LINES - SPECIFICATION L.12 (2 X 700 MM[2] AAAC PER PHASE) (1 X 425 MM[2] AAAC EARTH WIRE) |
ENA TS 43-6 : ISSUE 2 AMD 1 1996 | CONSTRUCTION OF OVERHEAD TRANSMISSION LINES ON STEEL TOWERS FOR 132 KV AND HIGHER VOLTAGES |
ENA TS 43-1 : ISSUE 2 AMD 1 1993 | SURVEY AND PREPARATION OF GROUND LINE PROFILES AND PLOTTING OF TOWER POSITIONS FOR STEEL TOWER OVERHEAD TRANSMISSION LINES AT 132 KV AND HIGHER VOLTAGES |
ENA TS 43-7 : ISSUE 4 2013 | 132 KV STEEL TOWER TRANSMISSION LINES: SPECIFICATION L4(M) |
ENA TS 43-9 : ISSUE 3 2013 | 132 KV STEEL TOWER TRANSMISSION LINES: SPECIFICATION L7(C) |
BS 8110-2:1985 | STRUCTURAL USE OF CONCRETE - PART 2: CODE OF PRACTICE FOR SPECIAL CIRCUMSTANCES |
ENA TS 43-1 : ISSUE 2 AMD 1 1993 | SURVEY AND PREPARATION OF GROUND LINE PROFILES AND PLOTTING OF TOWER POSITIONS FOR STEEL TOWER OVERHEAD TRANSMISSION LINES AT 132 KV AND HIGHER VOLTAGES |
ENA TS 43-6 : ISSUE 2 AMD 1 1996 | CONSTRUCTION OF OVERHEAD TRANSMISSION LINES ON STEEL TOWERS FOR 132 KV AND HIGHER VOLTAGES |
BS 8110-1:1985 | Structural use of concrete Code of practice for design and construction |
ENA TS 43-5 : ISSUE 2 AMD 1 1993 | FABRICATION AND GALVANIZING OF TOWER AND FOUNDATION STEELWORK FOR OVERHEAD TRANSMISSION LINES AT 132 KV AND HIGHER VOLTAGES |
ENA TS 43-11 : ISSUE 1 AMD 1 1996 | 400 KV STEEL TOWER TRANSMISSION LINES - SPECIFICATION L.12 (2 X 700 MM[2] AAAC PER PHASE) (1 X 425 MM[2] AAAC EARTH WIRE) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.