Foreword
Introduction
1 Scope
2 Normative references
3 Terminology, definitions, symbols and abbreviations
3.1 General terminology
3.2 Definitions
3.3 Symbols
3.4 Abbreviations
4 Design limits of the system
5 Storage, transport and handling
5.1 General
5.2 Transport
5.3 Storage
5.4 Handling on site
6 Installation
6.1 General recommendations for installation
6.2 Recommendations for above-ground installation
6.3 Recommendations for installation in buried
conditions
6.4 Jointing procedure
7 Special precautions
7.1 Concreting of thermoplastics systems within the
building structure
7.2 Foaming of thermoplastics systems
7.3 Prevention of additional stresses in pipe work
8 Jointing to other materials or other constructions
8.1 General
8.2 Solvent-cement joints
8.3 Ring seal joints
8.4 Jointing to non-thermoplastics components
8.5 Adaptors
9 Environmental aspects
10 Fire resistance of pipe work
11 Testing and inspection of installations
11.1 Testing
11.2 General inspection
12 Maintenance and cleaning of installations
12.1 General
12.2 Cleaning and descaling techniques
13 Chemical resistance of thermoplastics materials
Bibliography