ETR 075-3 : 20001
Current
The latest, up-to-date edition.
TERMINAL EQUIPMENT (TE); STUDY AND INVESTIGATION INTO THE FEASIBILITY OF FURTHER HARMONIZATION OF THE REQUIREMENTS AND ASSOCIATED TESTS OF ETS 300 001 (NET 4); PART 3: SPECIAL STUDIES
Hardcopy , PDF
English
Foreword
1 Scope
2 References
3 Definitions
4 Basis of the special studies
4.1 SECTION 1: Report on DC masks for Chapter 2
(subclause 2.3 of ETS 300 001)
4.2 SECTION 2: Report on Input Impedance in the On-line
condition (subclause 4.1.2)
4.3 SECTION 3: Annex to the Chapter 4.2, Degree of Unbalance
about earth
4.4 SECTION 4: Harmonization feasibility for testing methods
Preliminary Report
Annex A: DC current and loop resistance, Country DC masks
A.1 PSTN interfaces and feeding condition in the various
call progress phases
A.2 Mask area definitions for the DC characteristic
masks study
A.3 Superimposition area by area of the 19 country DC
characteristic dots
A.4 Sorting out of the 19 DC masks by shape category
A.5 Maximal and maximal feeding condition superimposition
for 19 country DC masks
A.6 Common allowed area inside the 19 country masks
A.7 Statistical study on the DC characteristics of the
19 country masks
A.8 Suggested target mask 1
A.9 Critical points with respect to the target mask 1
A.10 Target mask 1 compared to the common allowed area
A.11 Superimposition of the 4 DC masks of the widest PSTN
network in Europe
A.12 Comparison of the (D, F, I, GB) masks with respect to
the target mask 1
A.13 Suggested target mask 2
A.14 Nineteen Country DC mask by category
Annex B: Reference impedance in loop condition and country
return-loss
B.1 Summary of the various impedance in the European
countries
B.2 Reference impedance and return loss limits for the
19 countries by category
Annex C: Degree of unbalance about earth graphs
C.1 Degree of unbalance about earth LCL-QC one port-TE
C.2 Degree of unbalance about earth LCL-LC one port-TE
C.3 Degree of unbalance about earth LCL-QC two ports-TE
C.4 Degree of unbalance about earth LCL-LC one port-TE
C.5 Degree of unbalance about earth LCL-QC & LC two
ports-TE
Annex D: Effects of the testing arrangements and MFPB signal
timing
D.1 Feeding bridge effects
D.2 DC current and loop resistance testing method and
testing topology
D.3 LCL unbalance about earth testing method
D.4 MFPB signal timing
History
Provides a detailed analysis of the requirements dealing with the DC Characteristic, the Input Impedance in loop conditions, the Degree of Unbalance about Earth, and a preliminary report for the harmonization feasibility for testing methods.
Committee |
TE 5
|
DevelopmentNote |
NOV 95 is a historical version. (09/2004)
|
DocumentType |
Standard
|
Pages |
158
|
PublisherName |
European Telecommunications Standards Institute
|
Status |
Current
|
ETR 075-2 : 20001 | TERMINAL EQUIPMENT (TE); STUDY AND INVESTIGATION INTO THE FEASIBILITY FOR FURTHER HARMONIZATION OF THE REQUIREMENTS AND ASSOCIATED TESTS OF ETS 300 001 (CANDIDATE NET 4) PART 2: COMPREHENSIVE STUDY |
ETR 075-1 : 20001 | TERMINAL EQUIPMENT (TE); STUDY AND INVESTIGATION INTO THE FEASIBILITY OF FURTHER HARMONIZATION OF THE REQUIREMENTS AND ASSOCIATED TESTS OF ETS 300 001 (CANDIDATE NET 4) PART 1: OVERVIEW AND CONCLUSIONS |
ETS 300 001 : 20004 | ATTACHMENTS TO THE PUBLIC SWITCHED TELEPHONE NETWORK (PSTN); GENERAL TECHNICAL REQUIREMENTS FOR EQUIPMENT CONNECTED TO AN ANALOGUE SUBSCRIBER INTERFACE IN THE PSTN |
ETR 075-2 : 20001 | TERMINAL EQUIPMENT (TE); STUDY AND INVESTIGATION INTO THE FEASIBILITY FOR FURTHER HARMONIZATION OF THE REQUIREMENTS AND ASSOCIATED TESTS OF ETS 300 001 (CANDIDATE NET 4) PART 2: COMPREHENSIVE STUDY |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.