FAA AC 150/5200-30 : 2008
Current
The latest, up-to-date edition.
AIRPORT WINTER SAFETY AND OPERATIONS
Hardcopy , PDF
English
01-01-2008
1. PURPOSE
2. CANCELLATION
3. APPLICATION
4. PRINCIPAL CHANGES
5. METRIC UNITS
Chapter 1 - Introduction
1-1 Snow and Ice Control Committee
1-2 Airport Snow and Ice Control Committee (SICC)
1-3 Snow Control Center (SCC)
1-4 Airfield Clearing Priorities for the Snow and Ice Control
Plan (SICP)
1-5 Terminal and Landside - Ground Side Priority
1-6 Airfield Clearance Times
1-7 Sizing and Staffing Snow and Ice Control Equipment Fleet
1-8 Storage of Snow and Ice Control Equipment
1-9 Definitions
Chapter 2 - The Snow and Ice Control Plan
2-1 Safety Requirements
2-2 Topics for Pre- and Post-Season SICC Meetings
2-3 Outlining a Snow and Ice Control Plan (SICP)
2-4 Topics for Writing Instructions and Procedures for
Winter Operations and Notification
2-5 Runway Incursion Mitigation and Operations During
Non-Towered Air Traffic Control Periods
2-6 Staff Training and Recordkeeping
2-7 Other Related Items
Chapter 3 - Snow Clearing Operations and Preventive Measures
3-1 Weather Forecasting
3-2 FAA Forecasting Research and Development for Airport
Operators
3-3 Forecasting Runway Surface Conditions
Chapter 4 - Snow Clearing Operations and Ice Prevention
4-1 Introduction
4-2 Snow Clearing Principles
4-3 Controlling Snow Drifts
4-4 Snow Disposal
4-5 Methods for Ice Control and Removal
4-6 Approved Chemicals
4-7 Runway Friction Improvements
4-8 Sand
Sieve Designation
Percent by Weight Passing
Chapter 5 - Runway Surface Assessment and Reporting
5-1 Introduction
5-2 Runway Condition Reporting
5-3 Runway Friction Surveys
5-4 FAA-Approved Runway Friction Measuring Equipment
5-5 Friction Assessment Reporting
5-6 Requirements For Runway Closures
5-7 Continuous Monitoring
APPENDIX 1 - Development of Recommended Snow Bank Height
Profiles
APPENDIX 2 - Snow and Ice Control as a Materials-Handling
Problem
A2-1 Introduction
A2-2 Snow
A2-3 Ice
A2-4 Slush
APPENDIX 3 - FAA-Approved Decelerometers
A4-1 Scope
A4-2 Certification (General)
A4-3 Certification (Electronic Only)
A4-4 Decelerometer Calibration
A4-5 Training
Specifies guidance to assist airport operators in developing a snow and ice control plan, conducting and reporting runway friction surveys, and establishing snow removal and control procedures.
DevelopmentNote |
Supersedes FAA AC 150/5220-13. (09/2007)
|
DocumentType |
Standard
|
Pages |
65
|
PublisherName |
Federal Aviation Administration
|
Status |
Current
|
Supersedes |
FAA AC 150/5390-2 : 2004 | HELIPORT DESIGN |
FAA AC 150/5200-28 : 2008 | NOTICES TO AIRMEN (NOTAMS) FOR AIRPORT OPERATORS |
FAA AC 150/5380-5 : 0 | DEBRIS HAZARDS AT CIVIL AIRPORTS |
FAA AC 150/5200-18 : 0 | AIRPORT SAFETY SELF-INSPECTION |
FAA AC 150/5320-12 : 2007 | MEASUREMENT, CONSTRUCTION AND MAINTENANCE OF SKID-RESISTANT AIRPORT PAVEMENT SURFACES |
FAA AC 150/5070-6 : 2007 | AIRPORT MASTER PLANS |
SAE ARP 5623 : 2013 | MOBILE DIGITAL INFRARED PAVEMENT SURFACE, AMBIENT AIR AND DEW POINT TEMPERATURE SENSOR SYSTEM |
SAE ARP 5564 : 2016 | AIRPORT RUNWAY BROOMS |
FAA AC 150/5210-20 : 2008 | GROUND VEHICLE OPERATIONS ON AIRPORTS |
FAA AC 150/5210-22 : 0 | AIRPORT CERTIFICATION MANUAL (ACM) |
SAE ARP 5539 : 2013 | ROTARY PLOW WITH CARRIER VEHICLE |
SAE ARP 5943 : 2013 | SNOWPLOWS AND HITCHES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.