FAA AC 150/5300-14 : 2008
Current
The latest, up-to-date edition.
DESIGN OF AIRCRAFT DEICING FACILITIES
Hardcopy , PDF
English
01-01-2008
CHAPTER 1. INTRODUCTION
1-1 Overview
1-2 Definitions
1-3 Project Input
1-4 Related Reading Material
CHAPTER 2. SIZING AND SITING DEICING FACILITIES
2-1 General
2-2 FAA Clearance and Separation Standards Affecting
Deicing Facilities
2-3 Capacity of Deicing Facilities
2-4 Factors Affecting Number of Aircraft Deicing Pads
and Deicing Facilities
2-5 Factors Affecting Facility Location and Size
2-6 Fluid Handling Requirements at Deicing Facilities
2-7 Nighttime Lighting
2-8 Bypass Taxiing Capability
2-9 Multiple Deicing Queues
2-10 Topography
2-11 Utilities
2-12 The Airport Layout Plan (ALP) and Sizing and
Siting Facilities
CHAPTER 3. DESIGN OF AIRCRAFT DEICING PADS
3-1 Aircraft Deicing Pads
3-2 Separation Standards for Off-gate Aircraft Deicing Pads
3-3 Fixed Fluid Applicators
3-4 Pavement Markings for Off-gate Deicing Facilities
3-5 Deicing Pad Layouts
3-6 Electronic Message Boards for Off-gate Deicing Facilities
3-7 Apron Designs for Off-gate Deicing Facilities
CHAPTER 4. AIRCRAFT ACCESS AND VEHICLE SERVICE ROADS
4-1 Aircraft Access Routes
4-2 Vehicle Service Roads
CHAPTER 5. DESIGN OF INFRA-RED AIRCRAFT DEICING FACILITIES
5-1 Overview
5-2 Design Airplane
5-3 Infra-red Deicing Facilities (IDFs)
5-4 Siting of Infra-red Deicing Facilities
5-5 Entrance Taxiway
5-6 Infra-red Deicing Structure
5-7 Nighttime Lighting
5-8 Sizing Infra-red Deicing Structures
5-9 Optional Equipment - Ice Detection Cameras
5-10 Facility Operations Shelter
5-11 Computer-Controlled Gas-Powered Infra-red EU
Systems
5-12 Installation of Infra-red EU Systems
5-13 Infra-red EU System Configuration
5-14 Computer Hardware/Performance
5-15 Anti-icing Capability
5-16 Exit Taxiway
5-17 Bypass Taxiing Capability
5-18 Runoff Mitigation
CHAPTER 6. WATER QUALITY MITIGATION
6-1 Runoff Mitigation Structures
6-2 Mitigation Alternatives
6-3 Publicly Owned Treatment Works (POTWs)
6-4 Detention Basins
6-5 Underground Storage Tanks (USTs)
6-6 Recycling Glycol Fluids
6-7 Anaerobic Bioremediation Systems
Outlines standards, specifications, and guidance for designing aircraft deicing facilities.
DocumentType |
Standard
|
Pages |
35
|
PublisherName |
Federal Aviation Administration
|
Status |
Current
|
SAE ARP 4737 : 2017 | AIRCRAFT DEICING/ANTI-ICING METHODS |
ASHRAE 161 : 2018 | AIR QUALITY WITHIN COMMERCIAL AIRCRAFT |
FAA AC 150/5070-6 : 2007 | AIRPORT MASTER PLANS |
SAE ARP 4902 : 2018 | DESIGN OF AIRCRAFT DEICING FACILITIES |
IES RP 37 : 2015 | OUTDOOR LIGHTING FOR AIRPORT ENVIRONMENTS |
FAA AC 150/5320-15 : 2008 | MANAGEMENT OF AIRPORT INDUSTRIAL WASTE |
FAA AC 150/5300-13 : 2008 | AIRPORT DESIGN |
SAE AS 5681 : 2016 | MINIMUM OPERATIONAL PERFORMANCE SPECIFICATION FOR REMOTE ON-GROUND ICE DETECTION SYSTEMS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.