FAA AC 150/5370-13 : 2006
Current
The latest, up-to-date edition.
OFFPEAK CONSTRUCTION OF AIRPORT PAVEMENTS USING HOT-MIX ASPHALT
Hardcopy , PDF
English
01-01-2006
SECTION 1 - BACKGROUND
1. JUSTIFICATION
2. PURPOSE
3. OFF-PEAK TIMES
SECTION 2 - PROJECT PLANNING
4. POTENTIAL
5. FEASIBILITY
6. STAGING
7. CONSIDERATIONS
8. COORDINATION
9. COST ESTIMATES
SECTION 3 - COORDINATION
10. BACKGROUND
11. INITIAL COORDINATION
SECTION 4 - PROJECT MANAGEMENT
12. PROJECT MANAGER
13. CONSTRUCTION MANAGER
14. RESIDENT ENGINEER
SECTION 5 - DESIGN CONSIDERATIONS
15. PLANS AND SPECIFICATIONS
16. PAVEMENT SURVEY
17. SPECIAL DETAILS
18. SPECIFICATIONS
SECTION 6 - TESTING AND INSPECTION
19. TESTING
20. INSPECTION
SECTION 7 - OPERATIONAL SAFETY PROCEDURES
21. GENERAL
22. SAFETY PLAN
23. CONSTRUCTION ACTIVITIES
24. POST-CONSTRUCTION INSPECTION
SECTION 8 - CONSTRUCTION PRACTICES
25. PRECONSTRUCTION CONFERENCE
26. PROJECT SUBMITTALS
27. TESTING AND INSPECTION
28. CONSTRUCTION PROGRESS MEETINGS
29. WEATHER
30. COMMUNICATION
31. SECURITY DURING CONSTRUCTION
32. ASSEMBLY OF EQUIPMENT
SECTION 9 - CONSTRUCTION TECHNIQUES
33. TEST SECTIONS
34. LIMITS OF OVERLAY OPERATIONS
35. PLACEMENT OF HOT-MIX ASPHALT
36. TRANSITION RAMPS
37. IN-PAVEMENT LIGHTING
38. PAVEMENT MARKING
39. WORK AREA CLEANUP
40. MILLED SURFACES
SECTION 10 - SUMMARY
41. GENERAL
APPENDIX A - RELATED READING MATERIAL
Gives guidance for the planning, coordination, management, design, testing, inspection, and execution of offpeak construction of airport pavements using hot mix asphalt paving materials.
DocumentType |
Standard
|
Pages |
42
|
PublisherName |
Federal Aviation Administration
|
Status |
Current
|
FAA AC 150/5340-1 : 2008 | AIRPORT MARKINGS |
FAA AC 150/5370-2 : E | OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION |
FAA AC 150/5320-6 : 0 | AIRPORT PAVEMENT DESIGN AND EVALUATION |
FAA AC 150/5300-13 : 2008 | AIRPORT DESIGN |
FAA AC 150/5300-9 : 0 | PREDESIGN, PREBID AND PRECONSTRUCTION CONFERENCES FOR AIRPORT GRANT PROJECTS |
FAA AC 150/5370-10 : 2007 | STANDARDS FOR SPECIFYING CONSTRUCTION OF AIRPORTS |
FAA AC 150/5320-12 : 2007 | MEASUREMENT, CONSTRUCTION AND MAINTENANCE OF SKID-RESISTANT AIRPORT PAVEMENT SURFACES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.