FAA AC 43-214 : 2016
Current
The latest, up-to-date edition.
REPAIRS AND ALTERATIONS TO COMPOSITE AND BONDED AIRCRAFT STRUCTURE
Hardcopy , PDF
English
01-01-2016
1. PURPOSE
2. DEFINITIONS
3. RELATED READING MATERIAL (current editions)
4. BACKGROUND
5. ENGINEERING DATA AND PROCEDURES
6. RAW MATERIAL INSPECTION PROCEDURES
7. MATERIAL HANDLING AND STORAGE PROCEDURES
8. HANGARS, FACILITIES, AND EQUIPMENT
9. FABRICATION AND PROCESSES PROCEDURES
10. NDI PROCEDURES
11. PERSONNEL QUALIFICATION
12. INSPECTION RECORDS PROCEDURES
Gives information and guidance concerning an acceptable means, but not the only means, of demonstrating compliance with the requirements of Title 14 of the Code of Federal Regulations (14 CFR) parts 21, 23, 25, 26, 27, 29, 31, 33, 35, 43, 91, 121, 125, 129 (U.S.-registered airplanes), 133, 135, 137, and 145 regarding procedures and facilities for repairs and alterations of structures consisting of adhesively-bonded (including metal bond) and fiber-reinforced materials (e.g., carbon, aramid, and glass-reinforced polymeric materials mentioned in the current edition of AC 20-107, Composite Aircraft Structure).
DocumentType |
Standard
|
Pages |
25
|
PublisherName |
Federal Aviation Administration
|
Status |
Current
|
SAE AIR 4938 : 2017 | COMPOSITE AND BONDED STRUCTURE TECHNICIAN/SPECIALIST TRAINING DOCUMENT |
SAE AIR 6291 : 2014 | GUIDELINES FOR REPAIR PROCESS EVALUATION OF ALUMINUM BONDED STRUCTURE |
FAA AC 65-33 : 2017 | DEVELOPMENT OF TRAINING/QUALIFICATION AND CERTIFICATION PROGRAMS FOR COMPOSITE MAINTENANCE TECHNICIANS |
FAA AC 43.13-2 : 2008 | ACCEPTABLE METHODS, TECHNIQUES, AND PRACTICES - AIRCRAFT ALTERATIONS |
FAA AC 65-33 : 2017 | DEVELOPMENT OF TRAINING/QUALIFICATION AND CERTIFICATION PROGRAMS FOR COMPOSITE MAINTENANCE TECHNICIANS |
SAE ARP 5319 : 2002 | IMPREGNATION OF DRY FABRIC AND PLY LAY-UP |
SAE ARP 5606 : 2011 | COMPOSITE HONEYCOMB NDI REFERENCE STANDARDS |
SAE ARP 5089 : 1996 | COMPOSITE REPAIR NDT/NDI HANDBOOK |
FAA 8300.16 : 2014 | MAJOR REPAIR AND ALTERATION DATA APPROVAL |
SAE AIR 5416 : 2016 | MAINTENANCE LIFE CYCLE COST MODEL |
SAE ARP 4977 : 1996 | DRYING OF THERMOSETTING COMPOSITE MATERIALS |
FAA AC 120-77 : 0 | MAINTENANCE AND ALTERATION DATA |
SAE ARP 5256 : 2014 | MIXING RESINS, ADHESIVES AND POTTING COMPOUNDS |
FAA AC 00-56 : 2015 | VOLUNTARY INDUSTRY DISTRIBUTOR ACCREDITATION PROGRAM |
FAA AC 20-107 : 2009 | COMPOSITE AIRCRAFT STRUCTURE |
FAA AC 65-31 : 2014 | TRAINING, QUALIFICATION, AND CERTIFICATION OF NONDESTRUCTIVE INSPECTION PERSONNEL |
SAE ARP 4916 : 1997 | MASKING AND CLEANING OF EPOXY AND POLYESTER MATRIX THERMOSETTING COMPOSITE MATERIALS |
SAE AIR 5431 : 2004 | REPAIR TOOLING |
SAE AIR 5719 : 2009 | TEACHING POINTS FOR AN AWARENESS CLASS ON 'CRITICAL ISSUES IN COMPOSITE MAINTENANCE AND REPAIR' |
FAA AC 23-20 : 2003 | ACCEPTANCE GUIDANCE ON MATERIAL PROCUREMENT AND PROCESS SPECIFICATIONS FOR POLYMER MATRIX COMPOSITE SYSTEMS |
SAE ARP 4991 : 2014 | CORE RESTORATION OF THERMOSETTING COMPOSITE COMPONENTS |
SAE ARP 5605 : 2011 | SOLID COMPOSITE LAMINATE NDI REFERENCE STANDARDS |
FAA AC 21-26 : 2010 | QUALITY SYSTEM FOR THE MANUFACTURE OF COMPOSITE STRUCTURES |
SAE AIR 4938 : 2014 | COMPOSITE AND BONDED STRUCTURE TECHNICIAN/SPECIALIST TRAINING DOCUMENT |
FAA AC 43.13-1 : 0 | ACCEPTABLE METHODS, TECHNIQUES, AND PRACTICES - AIRCRAFT INSPECTION AND REPAIR |
SAE AIR 5279 : 2016 | COMPOSITE AND BONDED STRUCTURE INSPECTOR: TRAINING DOCUMENT |
SAE AIR 5278 : 2016 | COMPOSITE AND BONDED STRUCTURE ENGINEERS: TRAINING DOCUMENT |
FAA AC 43-210 : 2016 | STANDARDIZED PROCEDURES FOR OBTAINING APPROVAL OF DATA USED IN THE PERFORMANCE OF MAJOR REPAIRS AND MAJOR ALTERATIONS |
SAE AIR 4844 : 1999 | COMPOSITES AND METAL BONDING GLOSSARY |
SAE ARP 5143 : 2002 | VACUUM BAGGING OF THERMOSETTING COMPOSITE AND METALBOND REPAIRS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.