FAA AC 90-98 : 2003
Current
The latest, up-to-date edition.
SIMULTANEOUS CLOSELY SPACED PARALLEL OPERATIONS AIRPORTS USING PRECISION RUNWAY MONITOR SYSTEMS (PRM)
Hardcopy , PDF
English
01-01-2003
1. PURPOSE
2. BACKGROUND
3. GUIDANCE
4. PROCEDURES
5. USER REQUIREMENTS
Informs pilots and operators about the establishment of specific Air Traffic procedures to conduct flight operations into airports identified for Simultaneous Closely Spaced Parallel Approaches using Precision Runway Monitor Systems (PRM).
DocumentType |
Standard
|
Pages |
7
|
PublisherName |
Federal Aviation Administration
|
Status |
Current
|
FAA AC 150/5070-6 : 2007 | AIRPORT MASTER PLANS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.