FC 1-300-09N : Change 3
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
FACILITIES CRITERIA - NAVY AND MARINE CORPS DESIGN PROCEDURES
04-07-2023
14-09-2016
CHAPTER 1 - INTRODUCTION
CHAPTER 2 - POLICY
CHAPTER 3 - ROLES AND RESPONSIBILITIES
CHAPTER 4 - DELIVERABLE: FIELD INVESTIGATION
CHAPTER 5 - DELIVERABLE: BASIS OF DESIGN
CHAPTER 6 - DELIVERABLE: CALCULATIONS
CHAPTER 7 - DELIVERABLE: DRAWINGS
CHAPTER 8 - DELIVERABLE: SPECIFICATIONS
CHAPTER 9 - DELIVERABLE: COST ESTIMATES
CHAPTER 10 - DELIVERABLE: CONTRACTING REQUIREMENTS
CHAPTER 11 - DELIVERABLE: DESIGN-BUILD REQUEST FOR PROPOSAL (RFP)
CHAPTER 12 - ELECTRONIC DESIGN DELIVERABLES (EDD) FORMAT
CHAPTER 13 - PHASE: PREDESIGN SUBMITTALS
CHAPTER 14 - PHASE: CONCEPT DESIGN SUBMITTALS (10-15%)
CHAPTER 15 - PHASE: DESIGN DEVELOPMENT SUBMITTALS (35% - 50%)
CHAPTER 16 - PHASE: PRE-FINAL DESIGN SUBMITTALS (100%)
CHAPTER 17 - PHASE: FINAL DESIGN SUBMITTALS
CHAPTER 18 - PHASE: POST-DESIGN OR POST-RFP DEVELOPMENT SUBMITTAL REQUIREMENTS
CHAPTER 19 - PHASE: POST-CONSTRUCTION DOCUMENTS
APPENDIX A - REFERENCES
APPENDIX B - GLOSSARY of abbreviations
APPENDIX C - SAMPLE DELIVERABLES
TABLES
FIGURES
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.