FIPS PUB 87 : 0
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
GUIDELINES FOR ADP CONTINGENCY PLANNING
24-07-2023
1. INTRODUCTION
2. ROLE OF MANAGEMENT
2.1 Risk Analysis
2.2 Critical Dependencies
2.3 Management Review and Approval
3. THE ADP CONTINGENCY PLAN
3.1 Plan Structure and Contents
3.2 Part One - Preliminary Planning
3.2.1 Purpose
3.2.2 Scope
3.2.3 Assumptions
3.2.4 Responsibilities
3.2.5 Strategy
3.2.6 Record of Changes
3.2.7 Security of the Plan
3.3 Part Two - Preparatory Actions
3.3.1 People
3.3.2 Data
3.3.3 Software
3.3.4 Hardware
3.3.5 Communication
3.3.6 Supplies
3.3.7 Transportation
3.3.8 Space
3.3.9 Power and Environmental Controls
3.3.10 Documentation
3.4 Part Three - Action Plan
3.4.1 Emergency Response
3.4.2 Backup Operations
3.4.3 Recovery Actions
4. TESTING
4.1 Test Plans
4.2 Conducting Testing
4.3 Test Plan Documentation
5. REFERENCES AND ADDITIONAL READINGS
6. APPENDIX ONE
7. GLOSSARY
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.