• There are no items in your cart

FM 1364 : 2013

Current

Current

The latest, up-to-date edition.

EXPANSION CHAMBERS

Published date

06-03-2013

Sorry this product is not available in your region.

1. INTRODUCTION
2. GENERAL INFORMATION
3. GENERAL REQUIREMENTS
4. PERFORMANCE REQUIREMENTS
5. OPERATIONS REQUIREMENTS
APPENDIX A - UNITS OF MEASUREMENT
APPENDIX B - FM APPROVALS CERTIFICATION MARKS
APPENDIX C - OPERATIONAL TEST SETUP DIAGRAM
APPENDIX D - SAMPLE LISTING
APPENDIX E - TOLERANCE

Pertains to any component intended for use in sprinkler system piping to reduce pressure changes from temperature cycling in sprinkler systems, or to account for thermal expansion or pressure changes in anti-freeze systems.

DocumentType
Standard
PublisherName
Factory Mutual Research Corporation
Status
Current

ISO/IEC 17025:2005 General requirements for the competence of testing and calibration laboratories
AWWA C606 : 2015 GROOVED AND SHOULDERED JOINTS
IEEE/ASTM SI_10-2010 American National Standard for Metric Practice
NFPA 13 : 2016 INSTALLATION OF SPRINKLER SYSTEMS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.