GR 1502 CORE : ISSUE 2010
Current
The latest, up-to-date edition.
CENTRAL OFFICE/NETWORK ENVIRONMENT DETAIL ENGINEERING GENERIC REQUIREMENTS
12-01-2013
1 Introduction
2 Equipment Layout
3 Cross-Connect Systems
4 Power Facilities - Battery/Rectifiers (AC/DC)
5 Power Facilities - Converters (DC/DC)
6 Power Facilities - Inverters (DC/AC)
7 Power Facilities - Uninterruptable Power Supplies (UPS)
8 Power Facilities - Standby AC Power
9 Power Facilities - Power Systems Monitor/Controller (PSMC)
10 Power Facilities - DC Power Distribution
11 Power Facilities - Ring, Tone, and Cadence Plants
12 Central Office Grounding
13 Cable Rack and Auxiliary Framing - Cable Rack
14 Cable Rack and Auxiliary Framing - Auxiliary Framing -
Low-Type
15 Cable Rack and Auxiliary Framing - Auxiliary Framing -
High-Type
16 Rolling Ladders
17 Bracing
18 Cable Distribution Systems (CDSs)
19 Frame and Aisle Lighting - Fluorescent Type Lighting
20 Appliance Outlets and Miscellaneous Raceway
21 Frame and Aisle Lighting - Emergency Lighting
22 Operations Systems (OS)
23 Alarms
24 Wire and Cable Requirements
25 General Interface Requirements
26 Central Office Equipment (COE) Building Environment
Requirements
27 Central Office Equipment (COE) Records - Introduction
28 Office Record Index, Serial Numbers, and Central Office
Listing (COL)
29 Numbering System
30 Central Office Base Records
31 Supplier Standard Drawings/Documents
32 Interconnect Drawings
33 Central Office Base Record Marking and Creation
34 Procedures and Flows
35 Items Common to All Records
36 Document Types/Dash Numbers
37 Detail Engineering Service Provider (DESP) Output
Appendix A: References
Appendix B: Glossary
Requirement-Object Index
List of Figures
List of Tables
Presents the Telcordia view of proposed engineering generic requirements that Detail Engineering Service Provides (DESPs) are expected to provide with their services.
DevelopmentNote |
Included in FR INSTALL 19. (04/2001) To be read in conjunction with GR 1275 CORE. Included in FR EP 01. (06/2011)
|
DocumentType |
Standard
|
PublisherName |
Telcordia Technologies
|
Status |
Current
|
GR 1275 CORE : ISSUE 2010 | CENTRAL OFFICE/NETWORK ENVIRONMENT EQUIPMENT INSTALLATION/REMOVAL GENERIC REQUIREMENTS |
SCTE 186 : 2016 | PRODUCT ENVIRONMENTAL REQUIREMENTS FOR CABLE TELECOMMUNICATIONS |
SCTE 203 : 2014 | PRODUCT ENVIRONMENTAL REQUIREMENTS FOR CABLE TELECOMMUNICATIONS FACILITIES - TEST METHODS |
GR 3160 CORE : ISSUE 2 | GENERIC REQUIREMENTS FOR TELECOMMUNICATIONS DATA CENTER EQUIPMENT AND SPACES |
GR 383 CORE : ISSUE 3 | COMMON LANGUAGE(R) EQUIPMENT CODES (CLEI (TM) CODES) - GENERIC REQUIREMENTS FOR PRODUCT LABELS |
FR 64 : ISSUE 2011 | LATA SWITCHING SYSTEMS GENERIC REQUIREMENTS (LSSGR) |
GR 347 CORE : ISSUE 3 | GENERIC REQUIREMENTS FOR TELECOMMUNICATIONS POWER CABLE |
GR 1275 CORE : ISSUE 2010 | CENTRAL OFFICE/NETWORK ENVIRONMENT EQUIPMENT INSTALLATION/REMOVAL GENERIC REQUIREMENTS |
FR 440 : ISSUE 2011 | TRANSPORT SYSTEMS GENERIC REQUIREMENTS (TSGR) |
GR 295 CORE : ISSUE 1 | ISOLATED AND MESH BONDING NETWORKS: DEFINITION AND APPLICATION TO TELEPHONE CENTRAL OFFICES |
GR 449 CORE : ISSUE 3 | GENERIC REQUIREMENTS AND DESIGN CONSIDERATIONS FOR FIBER DISTRIBUTING FRAMES |
GR 356 CORE : ISSUE 2 | GENERIC REQUIREMENTS FOR OPTICAL CABLE INNERDUCT, ASSOCIATED CONDUIT, AND ACCESSORIES |
FR 2063 : ISSUE 2011 | NETWORK EQUIPMENT-BUILDING SYSTEM (NEBS[TM]) FAMILY OF REQUIREMENTS (NEBSFR) |
FR INSTALL 19 : ISSUE 2011 | CENTRAL OFFICE NETWORK ENVIRONMENT INSTALLATION REQUIREMENTS AND SERVICES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.