GR 2591 CORE : ISSUE 1
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
OBJECT ORIENTED PROCESS METRICS (OOPM)
23-07-2013
12-01-2013
Gives a proposed set of object oriented process metrics that can be implemented during the development and maintenance of objected oriented software by a supplier for a typical bellcore client company.
DocumentType |
Standard
|
PublisherName |
Telcordia Technologies
|
Status |
Withdrawn
|
GR 929 CORE : ISSUE 8 | RELIABILITY AND QUALITY MEASUREMENTS FOR TELECOMMUNICATIONS SYSTEMS (RQMS-WIRELINE) |
GR 1315 CORE : ISSUE 2 | IN-PROCESS QUALITY METRICS GENERIC REQUIREMENTS |
TR NWT 000179 : ISSUE 2 | QUALITY SYSTEM GENERIC REQUIREMENTS FOR SOFTWARE |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.