GR 282 CORE : ISSUE 4
Current
The latest, up-to-date edition.
SOFTWARE RELIABILITY AND QUALITY ACCEPTANCE CRITERIA (SRQAC)
12-01-2013
Preface
1 General Information
2 Introduction
2.1 Scope
2.2 Related Bellcore Documents
2.2.1 TR-NWT-000179
2.2.2 TR-NWT-000284 and TR-NWT-000418
2.2.3 GR-929-CORE
2.2.4 GR-1315-CORE
2.3 Requirements Terminology
2.4 Requirement Labeling Conventions
2.4.1 Numbering of Requirement and Related Objects
2.4.2 Requirement, Conditional Requirement, and
Objective Object Identification
2.5 Reasons for Reissue
3 Acceptance Criteria for System Test
3.1 General
3.2 System Test Planning
3.2.1 System Test Plan
3.2.2 Performance Objectives
3.2.3 System Configuration and Network
3.2.4 Software Patches
3.2.5 Documentation Process
3.2.6 In-Process Quality Metrics (IPQM)
3.2.7 Root Cause Analysis
3.2.8 Enhanced Testing
3.2.9 Advanced FOA Planning
3.3 System Testing
3.3.1 Entry Criteria
3.3.1.1 In-Process Quality Metrics (IPQM)
3.3.1.2 Exceptions to Entry Criteria
3.3.2 System Robustness
3.3.3 Exit Criteria for System Test
3.3.3.1 Software Releases
3.3.3.2 In-Process Quality Metrics (IPQM)
3.3.3.3 Software Patches
3.3.3.3.1 Software Patch
Monitoring
3.3.3.3.2 Patch Assurance
3.3.3.4 Exceptions to Exit Criteria
3.4 Planning for FOA
3.4.1 FOA Test Plan
3.4.2 Application Resource Access Control
3.4.3 FOA Support
3.4.4 Release and Change Status
4 Acceptance Criteria for First Office Application (FOA)
4.1 Entry Criteria for FOA
4.1.1 System Configuration
4.2 FOA Testing
4.2.1 Test Execution
4.2.2 System Robustness
4.2.3 Regression Testing
4.3 Exit Criteria for FOA
4.3.1 In-Process Quality Metrics (IPQM)
4.3.2 Test Coverage and Unresolved Faults
4.3.3 Software Performance
4.3.4 Change of Performance
4.3.5 Software Patches
4.3.6 Final Status Reports (FOA Testing)
4.3.7 Exceptions to Exit Criteria
5 Acceptance Criteria for General Availability (GA)
5.1 Entry Criteria for GA
5.1.1 Software Releases
5.1.2 Software Patches
5.1.2.1 Patch Monitoring
5.1.2.2 Patch Assurance
5.1.2.3 Patch Sequence Numbers and
Identification:
5.1.2.4 Patch Propagation to other
Releases
5.1.2.5 Patch Space
5.1.2.6 Defective Patches:
5.1.2.7 Writable Firmware Devices
5.1.2.8 Feature Patching
5.1.2.9 Patch Information:
5.1.2.9.1 Patch Information
Available from the
System
5.1.2.9.2 Patch Content
Information
5.1.2.10 Patching Tools
6 Acceptance Criteria for Interoperability Testing
6.1 Planning for Interoperability Testing
6.2 Entry Criteria for Interoperability Testing
6.3 Interoperability Testing of Advanced Intelligent
Networks (AIN)
6.4 Interoperability Testing of Broadband Video Networks
6.5 Interoperability Testing of Business Broadband Networks
6.6 Interoperability Testing of Residential Broadband
Networks
6.7 Exit Criteria for Interoperability Testing
7 Acceptance Criteria for Interoperability Testing of
Third Party Software
7.1 Entry Criteria for Interoperability Testing of Third
Party Software
7.2 Interoperability Testing of Third Party Software
7.3 Exit Criteria for Interoperability Testing of
Third Party Software
References
Glossary
List of Figures
Figure 2-1 Transition from System Test to GA
Figure 2-2 Transition to Interoperability Testing
Describes the Telcordia view of the software reliability and quality acceptance criteria for telecommunications software in switching, transport, voice mail, service control, support systems, and more.
DevelopmentNote |
Supersedes TR TSY 000282. Included in FR 796. (04/2001) Included in FD 29 (12/2003) Included in FR RQ 01. (02/2012)
|
DocumentType |
Standard
|
PublisherName |
Telcordia Technologies
|
Status |
Current
|
Supersedes |
GR 2963 CORE : ISSUE 3 | NETWORK ELEMENT CONFIGURATION MANAGEMENT - SOFTWARE MANAGEMENT |
GR 454 CORE : ISSUE 1 | GENERIC REQUIREMENTS FOR SUPPLIER-PROVIDED DOCUMENTATION |
GR 2878 CORE : ISSUE 4 | GENERIC REQUIREMENTS FOR CCS NODES SUPPORTING ATM HIGH-SPEED SIGNALING LINKS (HSLS) |
SR 3645 : ISSUE 1 | COMPENDIUM OF REQUIREMENTS FOR THE USER INTERFACE TO TELEPHONE NETWORK EQUIPMENT |
GR 301 CORE : ISSUE 2 | PUBLIC PACKET SWITCHED NETWORK GENERIC REQUIREMENTS (PPSNGR) |
GR 82 CORE : ISSUE 15 | SIGNALING TRANSFER POINT (STP) GENERIC REQUIREMENTS |
GR 2945 CORE : ISSUE 1 | YEAR 2000 GENERIC REQUIREMENTS: SYSTEMS AND INTERFACES |
SR 4037 : ISSUE 1 | DEGRADATION IN TRANSMISSION PERFORMANCE OF FIBER OPTIC VIDEO CIRCUITS |
GR 284 CORE : ISSUE 1 | RELIABILITY AND QUALITY SWITCHING SYSTEMS GENERIC REQUIREMENTS (RQSSGR) |
GR 929 CORE : ISSUE 8 | RELIABILITY AND QUALITY MEASUREMENTS FOR TELECOMMUNICATIONS SYSTEMS (RQMS-WIRELINE) |
GR 1315 CORE : ISSUE 2 | IN-PROCESS QUALITY METRICS GENERIC REQUIREMENTS |
GR 418 CORE : ISSUE 2 | GENERIC RELIABILITY ASSURANCE REQUIREMENTS FOR FIBER OPTIC TRANSPORT SYSTEMS |
GR 815 CORE : ISSUE 2 | GENERIC REQUIREMENTS FOR NETWORK ELEMENT/NETWORK SYSTEM (NE/NS) SECURITY |
TR NWT 000179 : ISSUE 2 | QUALITY SYSTEM GENERIC REQUIREMENTS FOR SOFTWARE |
GR 474 CORE : ISSUE 2 | NETWORK MAINTENANCE: ALARM AND CONTROL FOR NETWORK ELEMENTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.