GR 2951 CORE : ISSUE 1
Current
The latest, up-to-date edition.
Preface
1 Introduction
1.1 Purpose
1.2 OOPM overview
1.2.1 Audience for OOPM
1.2.2 Life cycle model
1.2.3 Concept of OO managed entity
1.3 OOPM threshold
1.4 OOPM control criteria
1.5 OOPM action plans
1.6 Bases for OOPM
2 Approach
2.1 Measurement framework
2.2 Measurement methodology
2.3 Measurement coverage
3 Class size
3.1 Purpose
3.2 Affecting factors
4 Method size
4.1 Purpose
4.2 Affecting factors
5 Class inheritance
5.1 Purpose
5.2 Affecting factors
6 Method inheritance
6.1 Purpose
6.2 Affecting factors
7 Class internal
7.1 Purpose
7.2 Affecting factors
8 Class external
8.1 Purpose
8.2 Affecting factors
9 Class quality
9.1 Purpose
9.2 Affecting factors
10 Class library
10.1 Purpose
10.2 Affecting factors
Appendix A: OOPM threshold control criteria
A.1 OOPM scoring scheme
A.1.1 Condition GREEN
A.1.2 Condition YELLOW
A.1.3 Condition RED
A.1.3.1 Scoring example
Appendix B: OOPM action plan
B.1 Action plan details
References
Glossary
Requirement-object list
The aim of this document is to define a framework for Object Oriented Process Metrics (OOPMs) that could be implemented during the development and maintenance of Objected Oriented (OO) software.
DocumentType |
Standard
|
PublisherName |
Telcordia Technologies
|
Status |
Current
|
GR 929 CORE : ISSUE 8 | RELIABILITY AND QUALITY MEASUREMENTS FOR TELECOMMUNICATIONS SYSTEMS (RQMS-WIRELINE) |
GR 1315 CORE : ISSUE 2 | IN-PROCESS QUALITY METRICS GENERIC REQUIREMENTS |
TR NWT 000179 : ISSUE 2 | QUALITY SYSTEM GENERIC REQUIREMENTS FOR SOFTWARE |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.