• Shopping Cart
    There are no items in your cart

GR 2951 CORE : ISSUE 1

Current

Current

The latest, up-to-date edition.

OBJECT ORIENTED PROCESS METRICS (OOPM)

Published date

12-01-2013

Sorry this product is not available in your region.

Preface
1 Introduction
1.1 Purpose
1.2 OOPM overview
1.2.1 Audience for OOPM
1.2.2 Life cycle model
1.2.3 Concept of OO managed entity
1.3 OOPM threshold
1.4 OOPM control criteria
1.5 OOPM action plans
1.6 Bases for OOPM
2 Approach
2.1 Measurement framework
2.2 Measurement methodology
2.3 Measurement coverage
3 Class size
3.1 Purpose
3.2 Affecting factors
4 Method size
4.1 Purpose
4.2 Affecting factors
5 Class inheritance
5.1 Purpose
5.2 Affecting factors
6 Method inheritance
6.1 Purpose
6.2 Affecting factors
7 Class internal
7.1 Purpose
7.2 Affecting factors
8 Class external
8.1 Purpose
8.2 Affecting factors
9 Class quality
9.1 Purpose
9.2 Affecting factors
10 Class library
10.1 Purpose
10.2 Affecting factors
Appendix A: OOPM threshold control criteria
A.1 OOPM scoring scheme
A.1.1 Condition GREEN
A.1.2 Condition YELLOW
A.1.3 Condition RED
A.1.3.1 Scoring example
Appendix B: OOPM action plan
B.1 Action plan details
References
Glossary
Requirement-object list

The aim of this document is to define a framework for Object Oriented Process Metrics (OOPMs) that could be implemented during the development and maintenance of Objected Oriented (OO) software.

DocumentType
Standard
PublisherName
Telcordia Technologies
Status
Current

GR 929 CORE : ISSUE 8 RELIABILITY AND QUALITY MEASUREMENTS FOR TELECOMMUNICATIONS SYSTEMS (RQMS-WIRELINE)
GR 1315 CORE : ISSUE 2 IN-PROCESS QUALITY METRICS GENERIC REQUIREMENTS
TR NWT 000179 : ISSUE 2 QUALITY SYSTEM GENERIC REQUIREMENTS FOR SOFTWARE

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.