• Shopping Cart
    There are no items in your cart

GR 82 ILR : ISSUE 2A

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

SIGNALING TRANSFER POINT (STP) GENERIC REQUIREMENTS ISSUES LIST REPORT

Withdrawn date

23-07-2013

Published date

12-01-2013

Sorry this product is not available in your region.

Preface
    Comments and Issues List Report Mechanism
    GR-82-ILR Status and Plans
    Formatting Comments
    Where and When to Submit Comments
1 Introduction
2 Issues List Summary Report
3 Full Report Issues
4 Issues List Description
5 Detailed Description for Issue #10: Proposed
    Changes to Link Outage Event Reporting
    5.1 Problems With Current Link Outage Notification
          Requirements
    5.2 New Proposed Link Outage Notifications
    5.3 Proposed New Link Outage Reporting Requirements
          (Excerpt)
          5.3.1 Link Outage Event Report
          5.3.2 Link Available Event Report
          5.3.3 Sustained Link Failure/Craft Referral
                  Event Report
          5.3.4 Unavailable-Link Minor State Change
                  Event Report
6 Detailed Description for Issue #113: Proposed
    Requirements for OPC-DPC Routing for SS7 Messages
    6.1 Memory Administration
    6.2 Routing Algorithm
    6.3 Network Management
    6.4 Data Operations
    6.5 Network Data Collection
    6.6 Surveillance

Contains set of outstanding issues relevant to GR-82-CORE. Includes such outstanding issues as are open, deferred or resolved. Open issues are at present being investigated and proposals for resolving the issues are forthcoming. Deferred issues have been set aside until more information is obtained. The resolved issues are included in the ILR if not already included in the GR.

DevelopmentNote
Included in GR 82 CORE. (03/2003)
DocumentType
Standard
PublisherName
Telcordia Technologies
Status
Withdrawn

GR 82 CORE : ISSUE 15 SIGNALING TRANSFER POINT (STP) GENERIC REQUIREMENTS
GR 246 CORE : ISSUE 10 TELCORDIA TECHNOLOGIES SPECIFICATION OF SIGNALLING SYSTEM NUMBER 7
GR 778 CORE : ISSUE 1 SEAS (TM) - STP GATEWAY FUNCTION INTERFACE SPECIFICATION: USER PROGRAM LAYER (UPL) APPLICATION MESSAGE DESCRIPTIONS AND FUNCTIONAL REQUIREMENTS
GR 1241 CORE : ISSUE 7 SUPPLEMENTAL SERVICE CONTROL POINT (SCP) GENERIC REQUIREMENTS
GR 2878 CORE : ISSUE 4 GENERIC REQUIREMENTS FOR CCS NODES SUPPORTING ATM HIGH-SPEED SIGNALING LINKS (HSLS)
GR 606 CORE : ISSUE 6 LSSGR: COMMON CHANNEL SIGNALING, SECTION 6.5
GR 2936 CORE : ISSUE 3 LOCAL NUMBER PORTABILITY (LNP) CAPABILITY SPECIFICATION: SERVICE PROVIDER PORTABILITY
GR 310 CORE : ISSUE 3 CCS OPERATIONS SYSTEM (CCS OS) - STP INTERFACE SPECIFICATION

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.