GR 839 CORE : ISSUE 1
Current
The latest, up-to-date edition.
GENERIC REQUIREMENTS FOR SUPPLIER-PROVIDED TRAINING
12-01-2013
1 Introduction
1.1 Use of These Requirements
1.2 Purpose of This Document
1.3 Scope
1.4 Relation to Other Bellcore Documents
1.5 Requirements Terminology
1.6 Requirement Labelling Conventions
1.7 Tier I/Tier II Terminology
1.8 Organization of This Document
1.9 Seven-Phase Training Development and Delivery
Process
1.10 Relationship of Training and Documentation
1.11 New Requirements Sections in This Issue
1.12 TR-839 Sections Discontinued
1.13 Expected Training Support
1.14 Expected End-of-Phase and Continuing Output
Documents
2 Needs Analysis
2.1 General Requirements
2.2 End-of-Phase Output: Needs Analysis Document
3 Job Study
3.1 Purpose of a Job Study
3.2 General Requirements
3.3 End-of-Phase Output: Job Study Document
4 Course and Curriculum Design and Development
4.1 General Requirements
4.2 Course Developer Qualifications
4.3 Course Numbering and Naming
4.4 Modular Course Design
4.5 Design of Computer-Based/Multimedia-Based
Training (CBT/MBT)
4.6 CBT/MBT Interoperability Testing and Support
4.7 CBT/MBT Usability Testing and Support (Human
Factors Perspective)
4.8 Tier I Maintenance Training
4.9 Tier II Maintenance Training
4.10 Differences Training
4.11 Assistance to BCCs
4.12 End-of-Phase Output: Course Design Document
5 Course Materials Development
5.1 General Requirements
5.2 Instructional Documentation Material
5.3 Media
5.4 Training Aids, Databases, Job Aids, Facilities,
and Equipment
5.5 Student Tests and Evaluation Tools
5.6 End-of-Phase Output: Administrator and Instructor
Guides; Draft Course Materials
6 Review and Field Test
6.1 General Requirement
6.2 Review
6.3 Field Test
6.4 End-of-Phase Output: Successful Field Test/
Field Trial Report
7 Course Delivery
7.1 General Requirements
7.2 Instructor Qualifications
7.3 Instructor-Led Training Delivery
7.4 Self-Training Delivery
7.5 Computer-Based/Multimedia-Based Training
(CBT/MBT) Delivery
7.6 Distance Learning Delivery
7.7 Continuing Output: Student Accomplishments
During Training
7.8 Continuing Output: Product and Training
Availability Matrix
8 Evaluation and Update
8.1 General Requirements
8.2 Evaluation
8.3 Update
8.4 End-of-Phase Output: Evaluation Reports
Appendix A: Quality Assurance/Conformance Checklist
Appendix B: Course Developer and Instructor Training
References
Glossary
Defines Telcordia's view of the generic requirements for training that a service provider would typically expect suppliers to provide with their products purchased by the service provider. Includes training on both hardware- and software-related network element products (mainly switching and transport systems), operations systems, and any other training required by a service provider, whether the training is given directly by system suppliers or by third party (contracted) course developers or training providers.
DevelopmentNote |
Replaces TR OPT 000839. Included in FR 64, FR 440 and FR 484. (08/1999) Included in FR 439. (05/2009)
|
DocumentType |
Standard
|
PublisherName |
Telcordia Technologies
|
Status |
Current
|
Supersedes |
GR 180 CORE : ISSUE 1 | GENERIC REQUIREMENTS FOR HARDWARE ATTACHMENTS FOR STEEL, CONCRETE, AND FIBERGLASS POLES |
GR 2919 CORE : ISSUE 1 | GENERIC REQUIREMENTS FOR HYBRID SPLICE/CONNECTOR FOR SINGLE-MODE OPTICAL FIBER |
GR 950 CORE : ISSUE 3 | GENERIC REQUIREMENTS FOR OPTICAL NETWORK UNIT (ONU) CLOSURES |
GR 2963 CORE : ISSUE 3 | NETWORK ELEMENT CONFIGURATION MANAGEMENT - SOFTWARE MANAGEMENT |
GR 356 CORE : ISSUE 2 | GENERIC REQUIREMENTS FOR OPTICAL CABLE INNERDUCT, ASSOCIATED CONDUIT, AND ACCESSORIES |
GR 3152 CORE : ISSUE 1 | GENERIC REQUIREMENTS FOR HARDENED MULTI-FIBER OPTICAL CONNECTORS (HMFOCS) |
GR 60 CORE : ISSUE 1 | GENERIC REQUIREMENTS FOR WOODEN UTILITY POLES |
GR 454 CORE : ISSUE 1 | GENERIC REQUIREMENTS FOR SUPPLIER-PROVIDED DOCUMENTATION |
GR 378 CORE : ISSUE 4 | GENERIC REQUIREMENTS FOR TIMING SIGNAL GENERATORS |
GR 2957 CORE : ISSUE 1 | GENERIC REQUIREMENTS FOR BELOW-GROUND FLYWHEEL ENERGY STORAGE SYSTEMS |
GR 1244 CORE : ISSUE 4 | CLOCKS FOR THE SYNCHRONIZED NETWORK: COMMON GENERIC CRITERIA |
GR 1110 CORE : ISSUE 4 | BROADBAND SWITCHING SYSTEM (BSS) GENERIC REQUIREMENTS |
GR 3159 CORE : ISSUE 2 | GENERIC REQUIREMENTS FOR FIBERGLASS-REINFORCED POLYMER (FRP) UTILITY POLES |
GR 301 CORE : ISSUE 2 | PUBLIC PACKET SWITCHED NETWORK GENERIC REQUIREMENTS (PPSNGR) |
GR 487 CORE : ISSUE 5 | GENERIC REQUIREMENTS FOR ELECTRONIC EQUIPMENT CABINETS |
GR 3115 CORE : ISSUE 2 | GENERIC REQUIREMENTS FOR COPPER CROSS-CONNECT CABINETS |
GR 3120 CORE : ISSUE 2 | GENERIC REQUIREMENTS FOR HARDENED FIBER OPTIC CONNECTORS (HFOCS) AND HARDENED FIBER OPTIC ADAPTERS (HOFAS) |
GR 253 CORE : ISSUE 5 | SYNCHRONOUS OPTICAL NETWORK (SONET) TRANSPORT SYSTEMS: COMMON GENERIC CRITERIA |
GR 2961 CORE : ISSUE 1 | GENERIC REQUIREMENTS FOR MULTI-PURPOSE FIBER OPTIC CABLE |
GR 82 CORE : ISSUE 15 | SIGNALING TRANSFER POINT (STP) GENERIC REQUIREMENTS |
GR 2923 CORE : ISSUE 2 | GENERIC REQUIREMENTS FOR FIBER OPTIC CONNECTOR CLEANING PRODUCTS |
GR 499 CORE : ISSUE 4 | TRANSPORT SYSTEMS GENERIC REQUIREMENTS (TSGR): COMMON REQUIREMENTS |
FR 64 : ISSUE 2011 | LATA SWITCHING SYSTEMS GENERIC REQUIREMENTS (LSSGR) |
GR 82 CORE : ISSUE 15 | SIGNALING TRANSFER POINT (STP) GENERIC REQUIREMENTS |
FR 271 : ISSUE 2011 | OPERATOR SERVICES SYSTEMS GENERIC REQUIREMENTS (OSSGR) |
FR 439 : ISSUE 2011 | OPERATIONS TECHNOLOGY GENERIC REQUIREMENTS (OTGR) |
FR 440 : ISSUE 2011 | TRANSPORT SYSTEMS GENERIC REQUIREMENTS (TSGR) |
TR TSY 000454 : ISSUE 1 | SUPPLIER DOCUMENTATION FOR NETWORK ELEMENTS |
TR TSY 000301 : REVISION 2 | PUBLIC PACKET SWITCHED NETWORK GENERIC REQUIREMENTS (PPSNGR) |
TR NWT 000840 : ISSUE 1 | SUPPLIER SUPPORT GENERIC REQUIREMENTS (SSGR) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.