Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Quality assurance and factory production control
5 Factory production control requirements
6 Handling, storage, packaging and delivery
7 Training of personnel
Annex A (normative) Inspection and testing tables of
insulating glass units
Annex B (normative) Periodic testing and inspections
Annex C (normative) Fogging test
Annex D (informative) Two component sealants, check
on the thoroughness of mixing
Annex E (informative) Sealants, hardness measurements
Annex F (informative) Seals, adherence measurements
Annex G (informative) Volatile test
Annex H (informative) Tightness check of hollow spacer
closed by welding on the back
Annex J (informative) Adhesion test for leaded light strip
Annex K (informative) Desiccant, adsorption capacity check
Bibliography