I.S. EN 12952-13:2003
Current
The latest, up-to-date edition.
WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 13: REQUIREMENTS FOR FLUE GAS CLEANING SYSTEMS
Hardcopy , PDF
English
01-01-2003
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Dates of withdrawal of national standards are available from NSAI.
Foreword
1 Scope
2 Normative references
3 Design, calculation, construction and manufacture
4 Equipment and erection
5 Inspection and testing
5.1 Inspection of workmanship and leakage testing
5.2 Final inspection before putting into operation
6 Operating manual and instructions
Annex A (informative) Guidance on operation matters
Annex ZA (informative) Clauses of this European
Standard addressing essential requirements
or other provisions of EU Directives
Bibliography
Applies to the design of equipment for boiler plants to reduce air pollutants in the flue gases.
DocumentType |
Standard
|
Pages |
18
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Current
|
Standards | Relationship |
UNE-EN 12952-13:2003 | Identical |
UNI EN 12952-13 : 2004 | Identical |
DIN EN 12952-13:2003-06 | Identical |
BS EN 12952-13:2003 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.