I.S. EN 13290-2:2001
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
SPACE PROJECT MANAGEMENT - GENERAL REQUIREMENTS - PART 2: PROJECT BREAKDOWN STRUCTURE
Hardcopy , PDF
19-02-2015
English
01-01-2001
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Dates of withdrawal of national standards are available from NSAI.
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
3.2 Abbreviated terms
4 Principles for creating the project breakdown
structures
4.1 General
4.2 Function tree
4.3 Product tree
4.4 Identification of models: model matrix
4.5 Work breakdown structure (WBS)
4.6 Other structures
4.7 Work package description
5 Requirements
5.1 General
5.2 Product tree
5.3 Model matrix
5.4 Work breakdown structure
5.5 Other structures
5.6 Work package description
Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.