I.S. EN 14160:2002
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
SPACE ENGINEERING - SOFTWARE
Hardcopy , PDF
13-09-2014
English
01-03-2002
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Dates of withdrawal of national standards are available from NSAI.
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
3.2 Abbreviated terms
4 Space system software engineering
4.1 Introduction
4.2 Organisation of this standard
4.3 Space system software engineering processes
4.3.1 General
4.3.2 Software requirements engineering process
4.3.3 Software design engineering process
4.3.4 Software verification and validation
(qualification) process
4.3.5 Software operations engineering process
4.3.6 Software maintenance process
4.4 Relation to space project management and space product
assurance standards
4.4.1 General
4.4.2 Software product assurance
4.4.3 Software project management
4.5 Verification engineering
5 General requirements
5.1 Introduction
5.2 System engineering processes related to software
5.2.1 Introduction
5.2.2 System requirements analysis
5.2.3 System partitioning
5.2.4 System level requirements for software verification
and validation
5.2.5 System level integration of software
5.2.6 Software operations
5.3 Software management
5.3.1 Introduction
5.3.2 Software life cycle
5.3.3 Interface management
5.3.4 Technical budget and margin management
5.4 Software requirements engineering process
5.4.1 Introduction
5.4.2 Software requirements analysis
5.4.3 Software top-level architectural design
5.4.4 Software verification and validation
5.5 Software design engineering process
5.5.1 Introduction
5.5.2 Design of software items
5.5.3 Coding and testing
5.5.4 Integration
5.6 Software verification and validation (qualification)
process
5.6.1 Introduction
5.6.2 Milestones
5.6.3 Verification and validation processes
5.6.4 Verification process implementation
5.6.5 Validation process implementation
5.6.6 Verification process
5.6.7 Validation process
5.6.8 Joint technical review process
5.7 Software operations engineering process
5.7.1 Introduction
5.7.2 Operation process
5.7.3 Process implementation
5.7.4 Operational testing
5.7.5 System operation
5.7.6 User support
5.8 Software maintenance process
5.8.1 Introduction
5.8.2 Process implementation
5.8.3 Problem and modification analysis
5.8.4 Modification implementation
5.8.5 Maintenance review and acceptance
5.8.6 Software migration
5.8.7 Software retirement
6 Special requirements
6.1 Introduction
6.2 Space segment software
6.2.1 General
6.2.2 Critical functions
6.2.3 System interfaces
6.2.4 Inflight software modifications
6.3 Ground segment software
6.4 Software re-use
6.4.1 General
6.4.2 Developing software for intended re-use
6.4.3 Re-using software from other projects
6.5 Man-machine interfaces
6.6 Critical software
Annex A (normative) Software documentation
A.1 Introduction
A.2 The requirements baseline (RB)
A.2.1 General
A.2.2 Requirements baseline contents at SRR
A.2.3 Interface requirements document (IRD)
A.3 Technical specification (TS)
A.3.1 General
A.3.2 Interface control document (ICD)
A.3.3 Software maintenance plan
A.3.4 Operations manual
A.4 Design justification file (DJF)
A.5 Design definition file (DDF)
A.6 System level documentation
A.6.1 Introduction
A.6.2 Operations, maintenance, migration and
retirement documentation
Annex B (informative) Requirement cross references
Annex C (informative) References to other space standards
Bibliography
Specifies the space software engineering process and its interfaces with the space project management standards and space product assurance standards and explains how they apply in the software engineering process.
DocumentType |
Standard
|
Pages |
64
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Withdrawn
|
SupersededBy |
Standards | Relationship |
BS EN 14160:2002 | Identical |
NF EN 14160 : 2002 | Identical |
NEN EN 14160 : 2002 | Identical |
NBN EN 14160 : 2002 | Identical |
SN EN 14160 : 2001 | Identical |
UNI EN 14160 : 2002 | Identical |
NS EN 14160 : 1ED 2002 | Identical |
UNE-EN 14160:2002 | Identical |
EN 14160:2001 | Identical |
DIN EN 14160:2002-10 | Identical |
EN 13290-1:1999 | Space project management - General requirements - Part 1: Policy and principles |
EN 13292:1999 | Space engineering standards - Policy and principles |
EN 13290-7:2001 | Space project management - General requirements - Part 7: Cost and schedule management |
EN 13290-2:2001 | Space project management - General requirements - Part 2: Project breakdown structure |
EN 13290-3:2001 | Space project management - General requirements - Part 3: Project organization |
EN 13290-5:2001 | Space project management - General requirements - Part 5: Configuration management |
ISO 8402:1994 | Quality management and quality assurance — Vocabulary |
IEEE 1062-1998 | IEEE Recommended Practice for Software Acquisition, 1998 Edition |
EN 13701:2001 | Space systems - Glossary of terms |
ISO/IEC 12207:2008 | Systems and software engineering — Software life cycle processes |
EN 13290-4:2001 | Space project management - General requirements - Part 4: Project phasing and planning |
EN 13290-6:2001 | Space project management - General requirements - Part 6: Information/Documentation management |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.