• I.S. EN 45510-8-1:1998

    Current The latest, up-to-date edition.

    GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 8-1: CONTROL AND INSTRUMENTATION

    Available format(s):  Hardcopy, PDF

    Language(s):  English

    Published date:  01-01-1998

    Publisher:  National Standards Authority of Ireland

    For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
    Only cited Standards give presumption of conformance to New Approach Directives/Regulations.

    Dates of withdrawal of national standards are available from NSAI.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    1 Scope
    2 Normative references
    3 Definitions
        3.1 Organisational terms
        3.2 Technical terms
        3.3 General terms
    4 Brief overall project description
        4.1 Role and organization of purchaser
        4.2 Site location
        4.3 Equipment task
        4.4 Equipment to be purchased
        4.5 Control and instrumentation
        4.6 Electrical supplies and other services
        4.7 Other interfaces
        4.8 Project programme
        4.9 Equipment identification systems
    5 Extent of supply
    6 Terminal points
    7 Operational requirements
        7.1 Operating environment
        7.2 Manning levels
        7.3 Normal operation
        7.4 Operating hours
        7.5 Start-up and shut-down
        7.6 Abnormal conditions
        7.7 Further operational requirements
    8 Life expectancy
        8.1 Design life
        8.2 Components requiring periodic maintenance
    9 Performance requirements
        9.1 Duty
        9.2 Performance
        9.3 Equipment margins
        9.4 Availability
        9.5 Levels of component redundancy
        9.6 Further performance requirements
    10 Design and fabrication
        10.1 Specific equipment features
        10.2 Design justification
        10.3 Material selection
        10.4 Safety
        10.5 Interchangeability
        10.6 Fabrication methods
    11 Maintenance requirements
        11.1 Planned maintenance
        11.2 Personnel safety
        11.3 Requirements for access
        11.4 Lifting requirements
        11.5 Special tools
        11.6 Test equipment
        11.7 Spare parts strategy
        11.8 Special precautions
    12 Technical documentation requirements
        12.1 Tender documentation
        12.2 Contract documentation
    13 Applicable legislation, regulations, standards and
        further requirements
        13.1 Legislation and regulations
        13.2 Standards
        13.3 Further requirements
    14 Evaluation criteria
        14.1 General
        14.2 Technical criteria
    15 Quality measures
        15.1 General
        15.2 Approvals procedure
        15.3 Inspection requirements
        15.4 Non-conformity
    16 Site factors
        16.1 Access
        16.2 Facilities
        16.3 Site specific requirements
    17 Verification of specified performance
        17.1 General
        17.2 Works tests
        17.3 Tests during installation and commissioning
        17.4 Technical conditions for trial run
        17.5 Functional and performance tests
    Annex A (informative) Bibliography
    Annex B (informative) Checklist for extent of supply
    Annex C (informative) Properties of measurement systems

    Abstract - (Show below) - (Hide below)

    Provides guidance on writing the technical specification for the procurement of Control and Instrumentation (C&I) for use in electricity generating stations (power stations).

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher National Standards Authority of Ireland
    Status Current
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective