I.S. EN 61839:2014
Current
The latest, up-to-date edition.
NUCLEAR POWER PLANTS - DESIGN OF CONTROL ROOMS - FUNCTIONAL ANALYSIS AND ASSIGNMENT
Hardcopy , PDF
English
01-01-2014
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Dates of withdrawal of national standards are available from NSAI.
FOREWORD
1 Scope and object
2 Normative references
3 Definitions
4 Process of functional analysis and
assignment
5 Functional analysis
6 Assignment of functions
Annex A (informative) - Examples of decomposition of
goals and subgoals
Annex B (informative) - Beginning of PWR (pressurized
water reactor) functional analysis
Bibliography
Annex ZA (normative) - Normative references to
international publications with their
corresponding European publications
Defines functional analysis and assignment procedures for the design of the control-room system for nuclear power plants and gives rules for developing criteria for the assignment of functions.
| DevelopmentNote |
For CENELEC adoptions of IEC publications, please check www.iec.ch to be sure that you have any corrigenda that may apply. (01/2017)
|
| DocumentType |
Standard
|
| Pages |
50
|
| PublisherName |
National Standards Authority of Ireland
|
| Status |
Current
|
| Standards | Relationship |
| EN 61839:2014 | Identical |
| UNE-EN 61839:2014 | Equivalent |
| BS EN 61839:2014 | Equivalent |