I.S. EN 61850-4:2011/A1:2020
Current
The latest, up-to-date edition.
Communication networks and systems for power utility automation - Part 4: System and project management
Hardcopy , PDF
English
04-01-2021
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Dates of withdrawal of national standards are available from NSAI.
FOREWORD
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Engineering requirements
6 System life cycle
7 Quality assurance
Annex A (informative) Announcement of discontinuation (example)
Annex B (informative) Delivery obligations after discontinuation (example)
Bibliography
This part of IEC 61850 applies to projects associated with processes near automation systems of power utilities (UAS, utility automation system), such as substation automation systems (SAS).
Committee |
IEC/TC 57
|
DocumentType |
Standard
|
ISBN |
978-2-8322-8925-9
|
Pages |
132
|
ProductNote |
The date of any NSAI previous adoption may not match the date of its original CEN/CENELEC document.
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Current
|
Supersedes |
Standards | Relationship |
EN 61850-4:2011/A1:2020 | Identical |
IEC 61850-4:2011/AMD1:2020 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.