National foreword
FOREWORD
1 Scope
2 Normative references
3 Terms and definitions
4 Synthetic testing techniques and methods for
short-circuit breaking tests
5 Synthetic testing techniques and methods for
short-circuit making tests
6 Specific requirements for synthetic tests for
making and breaking performance related to the
requirements of 6.102 through 6.111 of
IEC 62271-100:2008
Annex A (informative) - Current distortion
Annex B (informative) - Current injection methods
Annex C (informative) - Voltage injection methods
Annex D (informative) - Skeats or duplicate transformer
circuit
Annex E (normative) - Information to be given and
results to be recorded for synthetic tests
Annex F (normative) - Synthetic test methods for
circuit-breakers with opening resistors
Annex G (informative) - Synthetic methods for
capacitive-current switching
Annex H (informative) - Re-ignition methods to
prolong arcing
Annex I (normative) - Reduction in di/dt and TRV
for test duty T100a
Annex J (informative) - Three-phase synthetic test
circuits
Annex K (normative) - Test procedure using a
three-phase current circuit and one voltage
circuit
Annex L (normative) Splitting of test duties in test
series taking into account the associated TRV
for each pole-to-clear
Annex M (normative) - Tolerances on test quantities
for type tests
Annex N (informative) - Typical test circuits for
metal-enclosed and dead tank circuit-breakers
Annex O (informative) - Combination of current
injection and voltage injection methods
Bibliography
Annex ZA (normative) - Normative references to
international publications with their
corresponding European publications