BS EN 50152-1 : 2012
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR ALTERNATING CURRENT SWITCHGEAR - PART 1: CIRCUIT-BREAKERS WITH NOMINAL VOLTAGE ABOVE 1 KV |
EN 61000-4-30:2015/AC:2017-01
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS (IEC 61000-4-30:2015/COR1:2016) |
BS EN 60255-1:2010
|
Measuring relays and protection equipment Common requirements |
BS 8431:2010
|
Electrical static meters for secondary metering and sub-metering. Specification |
CLC/TR 60919-2 : 2010
|
PERFORMANCE OF HIGH-VOLTAGE DIRECT CURRENT (HVDC) SYSTEMS WITH LINE-COMMUTATED CONVERTERS - PART 2: FAULTS AND SWITCHING |
UNE-EN 61000-4-30:2015
|
Electromagnetic compatibility (EMC) - Part 4-30: Testing and measurement techniques - Power quality measurement methods |
BS EN 61036:1997
|
ALTERNATING CURRENT STATIC WATT-HOUR METERS FOR ACTIVE ENERGY (CLASSES 1 AND 2) |
11/30235280 DC : 0
|
BS EN 50152-1 - RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR ALTERNATING CURRENT SWITCHGEAR - PART 1: CIRCUIT-BREAKERS WITH NOMINAL VOLTAGE ABOVE 1 KV |
BS EN 60255-24:2001
|
Electrical relays Common format for transient data exchange (COMTRADE) for power systems |
03/113813 DC : 0
|
IEC 60034-2. ED.4 - ROTATING ELECTRICAL MACHINES - PART 2: METHODS FOR DETERMINING LOSSES AND EFFICIENCY FROM TESTS (EXCLUDING MACHINES FOR TRACTION VEHICLES) |
06/30159310 DC : 0
|
IEC 61000-4-30 - ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS |
BS EN 62271-203:2012
|
High-voltage switchgear and controlgear Gas-insulated metal-enclosed switchgear for rated voltages above 52 kV |
CEI EN 60255-24 : 2003
|
ELECTRICAL RELAYS - PART 24: COMMON FORMAT FOR TRANSIENT DATA EXCHANGE (COMTRADE) FOR POWER SYSTEMS |
I.S. EN 60044-8:2002
|
INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRANSFORMERS |
CSA C60044-8 : 2007 : R2016
|
INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRANSFORMERS |
BS EN 62271-100 : 2009
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 100: ALTERNATING-CURRENT CIRCUIT-BREAKERS (IEC 62271-100:2008) |
I.S. EN 61000-4-30:2015
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS |
BS PD IEC TR 60919-2 : 2008
|
PERFORMANCE OF HIGH-VOLTAGE DIRECT CURRENT (HVDC) SYSTEMS WITH LINE-COMMUTATED CONVERTERS - PART 2: FAULTS AND SWITCHING |
NF EN 62271-205 : 2008
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 205: COMPACT SWITCHGEAR ASSEMBLIES FOR RATED VOLTAGES ABOVE 52 KV |
I.S. EN 61400-21:2008
|
WIND TURBINES - PART 21: MEASUREMENT AND ASSESSMENT OF POWER QUALITY CHARACTERISTICS OF GRID CONNECTED WIND TURBINES |
UNE-EN 62271-203:2013
|
High-voltage switchgear and controlgear - Part 203: Gas-insulated metal-enclosed switchgear for rated voltages above 52 kV |
EN 62271-205:2008/corrigendum:2008
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 205: COMPACT SWITCHGEAR ASSEMBLIES FOR RATED VOLTAGES ABOVE 52 KV |
EN 62053-22:2003/A1:2017/AC:2018-05
|
ELECTRICITY METERING EQUIPMENT (A.C.) - PARTICULAR REQUIREMENTS - PART 22: STATIC METERS FOR ACTIVE ENERGY (CLASSES 0,2 S AND 0,5 S) (IEC 62053-22:2003/A1:2016/COR1:2018) |
BS EN 61400-21:2008
|
Wind turbines Measurement and assessment of power quality characteristics of grid connected wind turbines |
BIS IS/IEC 61400-21 : 2008
|
WIND TURBINES - PART 21: MEASUREMENT AND ASSESSMENT OF POWER QUALITY CHARACTERISTICS OF GRID CONNECTED WIND TURBINES |
UNE-EN 50152-2:2013
|
Railway applications - Fixed installations - Particular requirements for alternating current switchgear - Part 2: Disconnectors, earthing switches and switches with nominal voltage above 1 kV |
CEI EN 50470-1 : 2007
|
ELECTRICITY METERING EQUIPMENT (A.C.) - PART 1: GENERAL REQUIREMENTS, TESTS AND TEST CONDITIONS - METERING EQUIPMENT (CLASS INDEXES A, B AND C) |
PD IEC/TR 62001:2009
|
High-voltage direct current (HVDC) systems. Guidebook to the specification and design evaluation of A.C. filters |
I.S. EN 62271-203:2012
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 203: GAS-INSULATED METAL-ENCLOSED SWITCHGEAR FOR RATED VOLTAGES ABOVE 52 KV (IEC 62271-203:2011 (EQV)) |
EN 62271-100 : 2009 AMD 2/COR 18
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 100: ALTERNATING-CURRENT CIRCUIT-BREAKERS (IEC 62271-100:2008/A2:2017/COR1:2018) |
BS EN 60044-6:1999
|
INSTRUMENT TRANSFORMERS - PART 6: REQUIREMENTS FOR PROTECTIVE CURRENT TRANSFORMERS FOR TRANSIENT PERFORMANCE |
CEI EN 62053-22 : 2003
|
ELECTRICITY METERING EQUIPMENT (A.C.) - PARTICULAR REQUIREMENTS - PART 22: STATIC METERS FOR ACTIVE ENERGY (CLASSES 0,2 S AND 0,5 S) |
12/30229120 DC : 0
|
BS EN 62053-24 ED 1.0 - ELECTRICITY METERING EQUIPMENT (A.C.) - PARTICULAR REQUIREMENTS - PART 24: STATIC METERS FOR FUNDAMENTAL COMPONENT REACTIVE ENERGY (CLASSES 0,5 S, 1S AND 1) |
BS EN 45510-2-7:2002
|
GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 2-7: ELECTRICAL EQUIPMENT - SWITCHGEAR AND CONTROLGEAR |
11/30148668 DC : 0
|
IEC 61400-12-2 - WIND TURBINES - PART 12-2: POWER PERFORMANCE OF ELECTRICITY PRODUCING WIND TURBINES BASED ON NACELLE ANEMOMETRY |
11/30245197 DC : 0
|
BS EN 60143-2 - SERIES CAPACITORS FOR POWER SYSTEMS - PART 2: PROTECTIVE EQUIPMENTS FOR SERIES CAPACITOR BANKS |
PD CLC/TR 50579:2012
|
Electricity metering equipment (A.C.). Severity levels, immunity requirements and test methods for conducted disturbances in the frequency range 2 kHz-150 kHz |
CEI UNI EN 45510-2-7 : 2006
|
GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 2-7: ELECTRICAL EQUIPMENT - SWITCHGEAR AND CONTROLGEAR |
I.S. EN 62271-100:2009
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 100: ALTERNATING-CURRENT CIRCUIT-BREAKERS |
CEI EN 62488-1 : 2013
|
POWER LINE COMMUNICATION SYSTEMS FOR POWER UTILITY APPLICATIONS - PART 1: PLANNING OF ANALOGUE AND DIGITAL POWER LINE CARRIER SYSTEMS OPERATING OVER EHV/HV/MV ELECTRICITY GRIDS |
UNE-EN 61557-12:2010
|
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures -- Part 12: Performance measuring and monitoring devices (PMD) |
CSA C60044-8 : 2007 : R2011
|
INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRANSFORMERS |
IEC TS 62600-100:2012
|
Marine energy - Wave, tidal and other water current converters - Part 100: Electricity producing wave energy converters - Power performance assessment |
BS EN 60044-8:2002
|
Instrument transformers Electronic current transformers |
BIS IS/IEC 62271-203 : 2003
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 203: GAS-INSULATED METAL-ENCLOSED SWITCHGEAR FOR RATED VOLTAGES ABOVE 52 KV |
S.R. CLC/TR 50579:2012
|
ELECTRICITY METERING EQUIPMENT (A.C.) - SEVERITY LEVELS, IMMUNITY REQUIREMENTS AND TEST METHODS FOR CONDUCTED DISTURBANCES IN THE FREQUENCY RANGE 2 KHZ - 150 KHZ |
BS EN 50600-2-2:2014
|
Information technology. Data centre facilities and infrastructures Power distribution |
IEC 61400-12-0:1998
|
Wind turbine generator systems - Part 12: Wind turbine power performance testing |
DIN EN 60044-6 : 1999
|
INSTRUMENT TRANSFORMERS - PART 6: REQUIREMENTS FOR PROTECTIVE CURRENT TRANSFORMERS FOR TRANSIENT PERFORMANCE |
DIN EN 61400-12 : 1999
|
WIND TURBINE GENERATOR SYSTEMS - PART 12: WIND TURBINES POWER PERFORMANCE TESTING |
VDE 0414-7 : 1999
|
INSTRUMENT TRANSFORMERS - PART 6: REQUIREMENTS FOR PROTECTIVE CURRENT TRANSFORMERS FOR TRANSIENT PERFORMANCE |
VDE 0127-12 : 1999
|
WIND TURBINE GENERATOR SYSTEMS - PART 12: WIND TURBINES POWER PERFORMANCE TESTING |
02/207950 DC : DRAFT JULY 2002
|
IEC 61400-121 ED.1 - WIND TURBINES - PART 121: POWER PERFORMANCE MEASUREMENTS OF GRID CONNECTED WIND TURBINES |
BS EN 62488-1:2013
|
POWER LINE COMMUNICATION SYSTEMS FOR POWER UTILITY APPLICATIONS - PART 1: PLANNING OF ANALOGUE AND DIGITAL POWER LINE CARRIER SYSTEMS OPERATING OVER EHV/HV/MV ELECTRICITY GRIDS |
BS IEC 61892-3:2012
|
Mobile and fixed offshore units. Electrical installations Equipment |
08/30179468 DC : DRAFT MAR 2008
|
BS EN 62271-203 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 203: GAS-INSULATED METAL-ENCLOSED SWITCHGEAR FOR RATED VOLTAGES ABOVE 52 KV |
I.S. EN 50600-2-2:2014
|
INFORMATION TECHNOLOGY - DATA CENTRE FACILITIES AND INFRASTRUCTURES - PART 2-2: POWER DISTRIBUTION |
BS EN 61000-4-30:2015
|
Electromagnetic compatibility (EMC) Testing and measurement techniques. Power quality measurement methods |
16/30328917 DC : DRAFT APR 2016
|
BS EN 62488-2 ED 1.0 - POWER LINE COMMUNICATION SYSTEMS FOR POWER UTILITY APPLICATIONS - PART 2: ANALOGUE POWER LINE CARRIER TERMINALS (APLC) |
IEEE 1861 : 2014
|
GUIDE FOR ON-SITE ACCEPTANCE TESTS OF ELECTRICAL EQUIPMENT AND SYSTEM COMMISSIONING OF 1000 KV AC AND ABOVE |
12/30262567 DC : 0
|
BS EN 61000-4-30 ED 3 - ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS |
BS EN 50327:2003
|
Railway applications. Fixed installations. Harmonisation of the rated values for converter groups and tests on converter groups |
BS EN 50463 : 2007
|
RAILWAY APPLICATIONS - ENERGY MEASUREMENT ON BOARD TRAINS |
CSA C61000-4-30 : 2010
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS |
DD IEC PAS 62001 : 2004
|
GUIDE TO THE SPECIFICATION AND DESIGN EVALUATION OF A.C. FILTERS FOR HVDC SYSTEMS |
BS EN 60143-2:2013
|
Series capacitors for power systems Protective equipment for series capacitor banks |
NF EN 60044-8 : 2006
|
INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRANSDUCERS |
CEI EN 60143-2 : 2014
|
SERIES CAPACITORS FOR POWER SYSTEMS - PART 2: PROTECTIVE EQUIPMENT FOR SERIES CAPACITOR BANKS |
CSA C60044-8 :2007
|
INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRANSFORMERS |
NF EN 62052-11 : 2003 AMD 1 2017
|
ELECTRICITY METERING EQUIPMENT (A.C.) - GENERAL REQUIREMENTS, TESTS AND TEST CONDITIONS - PART 11: METERING EQUIPMENT |
PREN 50152-1 : DRAFT 2011
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR ALTERNATING CURRENT SWITCHGEAR - PART 1: CIRCUIT-BREAKERS WITH NOMINAL VOLTAGE ABOVE 1 KV |
BS EN 62053-22 : 2003
|
ELECTRICITY METERING EQUIPMENT (A.C.) - PARTICULAR REQUIREMENTS - PART 22: STATIC METERS FOR ACTIVE ENERGY (CLASSES 0,2 S AND 0,5 S) (IEC 62053-22:2003) |
I.S. EN 50152-2:2012
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR ALTERNATING CURRENT SWITCHGEAR - PART 2: DISCONNECTORS, EARTHING SWITCHES AND SWITCHES WITH NOMINAL VOLTAGE ABOVE 1 KV |
I.S. EN 62488-1:2013
|
POWER LINE COMMUNICATION SYSTEMS FOR POWER UTILITY APPLICATIONS - PART 1: PLANNING OF ANALOGUE AND DIGITAL POWER LINE CARRIER SYSTEMS OPERATING OVER EHV/HV/MV ELECTRICITY GRIDS (IEC 62488-1:2012 (EQV)) |
I.S. EN 62271-205:2008
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 205: COMPACT SWITCHGEAR ASSEMBLIES FOR RATED VOLTAGES ABOVE 52 KV |
I.S. EN 50463:2007
|
RAILWAY APPLICATIONS - ENERGY MEASUREMENT ON BOARD TRAINS |
IEC 61892-3:2012
|
Mobile and fixed offshore units - Electrical installations - Part 3: Equipment |
IEC 60044-8:2002
|
Instrument transformers - Part 8: Electronic current transformers |
EN 50600-2-2:2014
|
Information technology - Data centre facilities and infrastructures - Part 2-2: Power distribution |
BS EN 61400-12:1998
|
WIND TURBINE GENERATOR SYSTEMS - PART 12: WIND TURBINE POWER PERFORMANCE TESTING |
NF EN 62053-22 : 2003 AMD 1 2017
|
ELECTRICITY METERING EQUIPMENT (A.C.) - PARTICULAR REQUIREMENTS PART 22: STATIC METERS FOR ACTIVE ENERGY (CLASSES 0,2 S AND 0,5 S) |
01/205932 DC : DRAFT AUG 2001
|
BS 8431 - CODE OF PRACTICE FOR ELECTRICAL STATIC METERING FOR SECONDARY OR SUB-METERING |
CEI EN 60044-8 : 2004
|
INSTRUMENT TRANSFORMERS - PART 8: ELECTRONIC CURRENT TRASFORMERS |
PD IEC/TS 62600-100:2012
|
Marine energy. Wave, tidal and other water current converters Electricity producing wave energy converters. Power performance assessment |
06/30148073 DC : DRAFT MAR 2006
|
IEC 61400-21 - WIND TURBINES - PART 21: MEASUREMENT AND ASSESSMENT OF POWER QUALITY CHARACTERISTICS OF GRID CONNECTED WIND TURBINES |
BS EN 62271-205:2008
|
High-voltage switchgear and controlgear Compact switchgear assemblies for rated voltages above 52 kV |
IEC TR 62001:2009
|
High-voltage direct current (HVDC) systems - Guidebook to the specification and design evaluation of A.C. filters |
S.R. CLC/TR 50462:2008
|
RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS |
CLC/TR 50579:2012
|
ELECTRICITY METERING EQUIPMENT (A.C.) - SEVERITY LEVELS, IMMUNITY REQUIREMENTS AND TEST METHODS FOR CONDUCTED DISTURBANCES IN THE FREQUENCY RANGE 2 KHZ - 150 KHZ |
PD IEC/TR 61869-100:2017
|
Instrument transformers Guidance for application of current transformers in power system protection |
11/30235283 DC : 0
|
BS EN 50152-2 - RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR ALTERNATING CURRENT SWITCHGEAR - PART 2: DISCONNECTORS, EARTHING SWITCHES AND SWITCHES WITH NOMINAL VOLTAGE ABOVE 1 KV |
CEI EN 62052-11 : 2003
|
ELECTRICITY METERING EQUIPMENT (AC) - GENERAL REQUIREMENTS, TESTS AND TEST CONDITIONS - PART 11: METERING EQUIPMENT |
IEC 61557-12:2007
|
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 12: Performance measuring and monitoring devices (PMD) |
UNE-EN 50152-1:2013
|
Railway applications - Fixed installations - Particular requirements for alternating current switchgear - Part 1: Circuit-breakers with nominal voltage above 1 kV |
UNI CEI EN 45510-2-7 : 2011
|
GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 2-7: ELECTRICAL EQUIPMENT - SWITCHGEAR AND CONTROLGEAR |
CSA C61400-12-1 : 2007 : R2012
|
WIND TURBINES - PART 12-1: POWER PERFORMANCE MEASUREMENTS OF ELECTRICITY PRODUCING WIND TURBINES |
15/30267585 DC : 0
|
BS EN 61400-12-1 ED.2 - WIND TURBINES - PART 12-1: POWER PERFORMANCE MEASUREMENTS OF ELECTRICITY PRODUCING WIND TURBINES |
CEI CLC/TR 50579 : 2013
|
ELECTRICITY METERING EQUIPMENT - SEVERITY LEVELS, IMMUNITY REQUIREMENTS AND TEST METHODS FOR CONDUCTED DISTURBANCES IN THE FREQUENCY RANGE 2 KHZ - 150 KHZ |
NF EN 61400-21 : 2009
|
WIND TURBINES - PART 21: MEASUREMENT AND ASSESSMENT OF POWER QUALITY CHARACTERISTICS OF GRID CONNECTED WIND TURBINES |
I.S. EN 62053-22:2003
|
ELECTRICITY METERING EQUIPMENT (A.C.) - PARTICULAR REQUIREMENTS - PART 22: STATIC METERS FOR ACTIVE ENERGY (CLASSES 0,2 S AND 0,5 S) (IEC 62053-22:2003/A1:2016/COR1:2018) |
I.S. EN 50152-1:2012
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR ALTERNATING CURRENT SWITCHGEAR - PART 1: CIRCUIT-BREAKERS WITH NOMINAL VOLTAGE ABOVE 1 KV |
BS EN 50470-1 : 2006
|
ELECTRICITY METERING EQUIPMENT (A.C.) - PART 1: GENERAL REQUIREMENTS, TESTS AND TEST CONDITIONS - METERING EQUIPMENT (CLASS INDEXES A, B AND C) |
IEEE C37.234-2009
|
IEEE Guide for Protective Relay Applications to Power System Buses |
I.S. EN 61557-12:2008
|
ELECTRICAL SAFETY IN LOW VOLTAGE DISTRIBUTION SYSTEMS UP TO 1000 V A.C. AND 1500 V D.C. - EQUIPMENT FOR TESTING, MEASURING OR MONITORING OF PROTECTIVE MEASURES - PART 12: PERFORMANCE MEASURING AND MONITORING DEVICES (PMD) |
CSA CEI/IEC 61000.4.30 : 2004
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS |
I.S. EN 61036:1997
|
ALTERNATING CURRENT STATIC WATT-HOUR METERS FOR ACTIVE ENERGY (CLASSES 1 AND 2) |
CEI EN 60255-1 : 2011
|
MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 1: COMMON REQUIREMENTS |
PREN 50152-2 : DRAFT 2011
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR ALTERNATING CURRENT SWITCHGEAR - PART 2: DISCONNECTORS, EARTHING SWITCHES AND SWITCHES WITH NOMINAL VOLTAGE ABOVE 1 KV |
CEI EN 61557-12 : 2013
|
ELECTRICAL SAFETY IN LOW VOLTAGE DISTRIBUTION SYSTEMS UP TO 1000 V A.C. AND 1500 V D.C. - EQUIPMENT FOR TESTING, MEASURING OR MONITORING OF PROTECTIVE MEASURES - PART 12: PERFORMANCE MEASURING AND MONITORING DEVICES (PMD) |
CEI EN 62271-205 : 2012
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 205: COMPACT SWITCHGEAR ASSEMBLIES FOR RATED VOLTAGES ABOVE 52 KV |
CEI EN 50152-2 : 2013
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR ALTERNATING CURRENT SWITCHGEAR - PART 2: DISCONNECTORS, EARTHING SWITCHES AND SWITCHES WITH NOMINAL VOLTAGE ABOVE 1 KV |
IEC 62505-3-2:2009
|
Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 3-2: Measurement, control and protection devices for specific use in a.c. traction systems - Single-phase current transformers |
IEC PAS 62001:2004
|
Guide to the specification and design evaluation of a.c. filters for HVDC systems |
IEC TR 61869-100:2017
|
Instrument transformers - Part 100: Guidance for application of current transformers in power system protection |
IEC 62271-203:2011
|
High-voltage switchgear and controlgear - Part 203: Gas-insulated metal-enclosed switchgear for rated voltages above 52 kV |
IEC 62052-11:2003+AMD1:2016 CSV
|
Electricity metering equipment (a.c.) - General requirements, tests and test conditions - Part 11: Metering equipment |
IEC 61000-4-30 : 3.0EN+(REDLINE+VERSION)
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS |
IEC 60255-1:1967
|
Electrical relays - Part 1: Instantaneous all-or-nothing relays |
IEC 60143-2:2012
|
Series capacitors for power systems - Part 2: Protective equipment for series capacitor banks |
IEC TR 61869-103:2012
|
Instrument transformers - The use of instrument transformers for power quality measurement |
IEC 61000-4-30:2015 RLV
|
Electromagnetic compatibility (EMC) - Part 4-30: Testing and measurement techniques - Power quality measurement methods |
IEC 62053-22:2003+AMD1:2016 CSV
|
Electricity metering equipment (a.c.) - Particular Requirements - Part 22: Static meters for active energy (classes 0,2 S and 0,5 S) |
IEC 62271-205:2008
|
High-voltage switchgear and controlgear - Part 205: Compact switchgear assemblies for rated voltages above 52 kV |
IEC 62488-1:2012
|
Power line communication systems for power utility applications - Part 1: Planning of analogue and digital power line carrier systems operating over EHV/HV/MV electricity grids |
10/30230568 DC : 0
|
BS EN 61892-3 - MOBILE AND FIXED OFFSHORE UNITS - ELECTRICAL INSTALLATIONS - PART 3: EQUIPMENT |
IEC 61400-21:2008
|
Wind turbines - Part 21: Measurement and assessment of power quality characteristics of grid connected wind turbines |
EN 45510-2-7:2002
|
Guide for procurement of power station equipment - Part 2-7: Electrical equipment - Switchgear and controlgear |
CEI EN 62271-203 : 2013
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 203: GAS-INSULATED METAL-ENCLOSED SWITCHGEAR FOR RATED VOLTAGES ABOVE 52 KV |
CEI CLC/TR 50462 : 2009
|
RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS |
S.R. CLC/TR 60919-2:2010
|
PERFORMANCE OF HIGH-VOLTAGE DIRECT CURRENT (HVDC) SYSTEMS WITH LINE-COMMUTATED CONVERTERS - PART 2: FAULTS AND SWITCHING |
BS EN 61557-12:2008
|
Electrical safety in low voltage distribution systems up to 1000 V a.c. and 1500 V d.c. Equipment for testing, measuring or monitoring of protective measures Performance measuring and monitoring devices (PMD) |
I.S. EN 60143-2:2013
|
SERIES CAPACITORS FOR POWER SYSTEMS - PART 2: PROTECTIVE EQUIPMENT FOR SERIES CAPACITOR BANKS (IEC 60143-2:2012 (EQV)) |
I.S. EN 50470-1:2006
|
ELECTRICITY METERING EQUIPMENT (A.C.) - PART 1: GENERAL REQUIREMENTS, TESTS AND TEST CONDITIONS - METERING EQUIPMENT (CLASS INDEXES A, B AND C) |
CEI CLC/TR 60919-2 : 2013
|
PERFORMANCE OF HIGH-VOLTAGE DIRECT CURRENT (HVDC) SYSTEMS WITH LINE-COMMUTATED CONVERTERS - PART 2: FAULTS AND SWITCHING |
IEC TR 60919-2:2008+AMD1:2015 CSV
|
Performance of high-voltage direct current (HVDC) systems withline-commutated converters - Part 2: Faults and switching |
CLC/TR 50462:2008
|
Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors |
CSA C61000-4-30 : 2010 : R2014
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS |
CSA C61400-12-1:2007
|
WIND TURBINES - PART 12-1: POWER PERFORMANCE MEASUREMENTS OF ELECTRICITY PRODUCING WIND TURBINES |
BS EN 50152-2:2012
|
Railway applications. Fixed installations. Particular requirements for alternating current switchgear Disconnectors, earthing switches and switches with nominal voltage above 1 kV |
IEEE 3004.1-2013
|
RECOMMENDED PRACTICE FOR THE APPLICATION OF INSTRUMENT TRANSFORMERS IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS |
EN 50470-1:2006
|
Electricity metering equipment (a.c.) - Part 1: General requirements, tests and test conditions - Metering equipment (class indexes A, B and C) |
CEI EN 61400-21 : 2011
|
WIND TURBINES - PART 21: MEASUREMENT AND ASSESSMENT OF POWER QUALITY CHARACTERISTICS OF GRID CONNECTED WIND TURBINES |
NF EN 60255-1 : 2010
|
MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 1: COMMON REQUIREMENTS |
I.S. EN 60255-1:2010
|
MEASURING RELAYS AND PROTECTION EQUIPMENT - PART 1: COMMON REQUIREMENTS |
IEC 61972:2002
|
Method for determining losses and efficiency of three-phase cage induction motors |
IEC 62271-100:2008+AMD1:2012+AMD2:2017 CSV
|
High-voltage switchgear and controlgear - Part 100: Alternating-current circuit-breakers |
EN 62488-1:2013
|
Power line communication systems for power utility applications - Part 1: Planning of analogue and digital power line carrier systems operating over EHV/HV/MV electricity grids |
EN 61036:1996/A1:2000
|
ALTERNATING CURRENT STATIC WATT-HOUR METERS FOR ACTIVE ENERGY (CLASSES 1 AND 2) |
EN 50327 : 2003 AMD 1 2005
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - HARMONISATION OF THE RATED VALUES FOR CONVERTER GROUPS AND TESTS ON CONVERTER GROUPS |
EN 50152-2:2012
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR ALTERNATING CURRENT SWITCHGEAR - PART 2: DISCONNECTORS, EARTHING SWITCHES AND SWITCHES WITH NOMINAL VOLTAGE ABOVE 1 KV |
EN 61400-21:2008
|
WIND TURBINES - PART 21: MEASUREMENT AND ASSESSMENT OF POWER QUALITY CHARACTERISTICS OF GRID CONNECTED WIND TURBINES |
EN 61557-12:2008
|
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 12: Performance measuring and monitoring devices (PMD) |
EN 60255-1:2010
|
Measuring relays and protection equipment - Part 1: Common requirements |
EN 60143-2:2013
|
Series capacitors for power systems - Part 2: Protective equipment for series capacitor banks |
EN 62271-203:2012
|
High-voltage switchgear and controlgear - Part 203: Gas-insulated metal-enclosed switchgear for rated voltages above 52 kV |
EN 50152-1 : 2012 AMD 1 2013
|
RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR ALTERNATING CURRENT SWITCHGEAR - PART 1: CIRCUIT-BREAKERS WITH NOMINAL VOLTAGE ABOVE 1 KV |
EN 60044-8:2002
|
Instrument transformers - Part 8: Electronic current transformers |
EN 50463:2007
|
Railway applications - Energy measurement on board trains |
CEI 18-58 : 2013
|
MOBILE AND FIXED OFFSHORE UNITS - ELECTRICAL INSTALLATIONS - PART 3: EQUIPMENT |