CSA S832 : 2014
|
SEISMIC RISK REDUCTION OF OPERATIONAL AND FUNCTIONAL COMPONENTS (OFCS) OF BUILDINGS |
BS EN 60143-4:2010
|
SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS |
02/210916 DC : DRAFT OCT 2002
|
IEC 62271-002 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 002: SEISMIC QUALIFICATION FOR RATED VOLTAGES OF 72,5 KV AND ABOVE |
CEI EN 60068-2-57 : 2014
|
ENVIRONMENTAL TESTING - PART 2-57: TESTS - TEST FF: VIBRATION - TIME HISTORY AND SINE-BEAT METHOD |
BS EN 62040-5-3:2017
|
Uninterruptible power systems (UPS) DC output UPS. Performance and test requirements |
CEI EN 62271-207 : 2014
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 207: SEISMIC QUALIFICATION FOR GAS-INSULATED SWITCHGEAR ASSEMBLIES FOR RATED VOLTAGES ABOVE 52 KV |
BS EN 61758-1:2008
|
Fibre optic interconnecting devices and passive components. Interface standard for closures General and guidance |
17/30347294 DC : 0
|
BS EN 60076-22-1 - POWER TRANSFORMER AND REACTOR FITTINGS - PART 22-1: PROTECTIVE DEVICES |
BS EN 60068-2-57:2013
|
ENVIRONMENTAL TESTING - PART 2-57: TESTS - TEST FF: VIBRATION - TIME-HISTORY AND SINE-BEAT METHOD |
07/30167951 DC : 0
|
BS EN 60076-1 - POWER TRANSFORMERS - PART 1: GENERAL |
I.S. EN 60143-4:2010
|
SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS |
NF EN 60068-2-57 : 2013
|
ENVIRONMENTAL TESTING - PART 2-57: TESTS - TEST FF: VIBRATION - TIME-HISTORY AND SINE-BEAT METHOD |
I.S. EN 60068-2-57:2013
|
ENVIRONMENTAL TESTING - PART 2-57: TESTS - TEST FF: VIBRATION - TIME-HISTORY AND SINE-BEAT METHOD (IEC 60068-2-57:2013 (EQV)) |
EN 50216-2 : 2002 AMD 1 2002
|
POWER TRANSFORMER AND REACTOR FITTINGS - PART 2: GAS AND OIL ACTUATED RELAY FOR LIQUID IMMERSED TRANSFORMERS AND REACTORS WITH CONSERVATOR |
EN 61758-1:2008
|
Fibre optic interconnecting devices and passive components - Interface standard for closures - Part 1: General and guidance |
EN 50216-1:2002
|
Power transformer and reactor fittings - Part 1: General |
EN 62040-5-3:2017
|
Uninterruptible power systems (UPS) - Part 5-3: DC output UPS - Performance and test requirements |
EN 61587-2:2011
|
MECHANICAL STRUCTURES FOR ELECTRONIC EQUIPMENT - TESTS FOR IEC 60917 AND IEC 60297 - PART 2: SEISMIC TESTS FOR CABINETS AND RACKS (IEC 61587-2:2011) |
EN 60255-21-3:1995
|
Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section 3: Seismic tests |
01/203455 DC : DRAFT MAY 2001
|
IEC 60143-1 ED.4.0 - SERIES CAPACITORS FOR POWER SYSTEMS |
BS EN 50216-2:2002
|
Power transformers and reactor fittings Gas and oil actuated relay for liquid immersed transformers and reactors with conservator |
BS EN 61587-5:2014
|
MECHANICAL STRUCTURES FOR ELECTRONIC EQUIPMENT - TESTS FOR IEC 60917 AND IEC 60297 - PART 5: SEISMIC TESTS FOR CHASSIS, SUBRACKS AND PLUG-IN UNITS |
BS 142-1.5.3(1993) : 1993 AMD 8833
|
ELECTRICAL PROTECTION RELAYS - INFORMATION AND REQUIREMENTS FOR ALL PROTECTION RELAYS - VIBRATION, SHOCK, BUMP AND SEISMIC TESTING - SEISMIC TESTS |
05/30132701 DC : DRAFT APR 2005
|
IEC 62271-300 ED 1 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 300: SEISMIC QUALIFICATION OF ALTERNATING CURRENT CIRCUIT-BREAKERS |
EN 60780-323 : 2017
|
Nuclear facilities - Electrical equipment important to safety - Qualification |
CEI EN 61587-2 : 2012
|
MECHANICAL STRUCTURES FOR ELECTRONIC EQUIPMENT - TESTS FOR IEC 60917 AND IEC 60297 - PART 2: SEISMIC TESTS FOR CABINETS AND RACKS |
BS IEC/IEEE 60780-323 : 2016
|
NUCLEAR FACILITIES - ELECTRICAL EQUIPMENT IMPORTANT TO SAFETY - QUALIFICATION |
I.S. EN 61587-2:2011
|
MECHANICAL STRUCTURES FOR ELECTRONIC EQUIPMENT - TESTS FOR IEC 60917 AND IEC 60297 - PART 2: SEISMIC TESTS FOR CABINETS AND RACKS (IEC 61587-2:2011) |
08/30179134 DC : DRAFT MAR 2008
|
BS EN 60143-4 - SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS |
NF EN 300019 1-4 : 2014
|
ENVIRONMENTAL ENGINEERING (EE) - ENVIRONMENTAL CONDITIONS AND ENVIRONMENTAL TESTS FOR TELECOMMUNICATIONS EQUIPMENT - PART 1-4: CLASSIFICATION OF ENVIRONMENTAL CONDITIONS - STATIONARY USE AT NON-WEATHERPROTECTED LOCATIONS (V2.2.1) |
IEC TR 62271-300:2006
|
High-voltage switchgear and controlgear - Part 300: Seismic qualification of alternating current circuit-breakers |
CEI EN 61587-5 : 2014
|
MECHANICAL STRUCTURES FOR ELECTRONIC EQUIPMENT - TESTS FOR IEC 60917 AND IEC 60297 - PART 5: SEISMIC TESTS FOR CHASSIS, SUBRACKS AND PLUG-IN UNITS |
I.S. EN 61587-5:2014
|
MECHANICAL STRUCTURES FOR ELECTRONIC EQUIPMENT - TESTS FOR IEC 60917 AND IEC 60297 - PART 5: SEISMIC TESTS FOR CHASSIS, SUBRACKS AND PLUG-IN UNITS |
CEI EN 50216-1 : 2002
|
POWER TRANSFORMER AND REACTOR FITTINGS - PART 1: GENERAL |
I.S. EN 62040-5-3:2017
|
UNINTERRUPTIBLE POWER SYSTEMS (UPS) - PART 5-3: DC OUTPUT UPS - PERFORMANCE AND TEST REQUIREMENTS |
CEI EN 60143-4 : 2012
|
SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS |
IEC TS 62271-210:2013
|
High-voltage switchgear and controlgear - Part 210: Seismic qualification for metal enclosed and solid-insulation enclosed switchgear and controlgear assemblies for rated voltages above 1 kV and up to and including 52 kV |
I.S. EN 62040-3:2011
|
UNINTERRUPTIBLE POWER SYSTEMS (UPS) - PART 3: METHOD OF SPECIFYING THE PERFORMANCE AND TEST REQUIREMENTS |
UNE-EN 62271-207:2012
|
High-voltage switchgear and controlgear - Part 207: Seismic qualification for gas-insulated switchgear assemblies for rated voltages above 52 kV |
CEI EN 62040-3 : 2015
|
UNINTERRUPTIBLE POWER SYSTEMS (UPS) - PART 3: METHOD OF SPECIFYING THE PERFORMANCE AND TEST REQUIREMENTS |
NF EN 62271-2 : 2004
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 2: SEISMIC QUALIFICATION FOR RATED VOLTAGES OF 72,5 KV AND ABOVE |
NF EN 300019-1-3 : 2014
|
ENVIRONMENTAL ENGINEERING (EE) - ENVIRONMENTAL CONDITIONS AND ENVIRONMENTAL TESTS FOR TELECOMMUNICATION EQUIPMENT - PART 1-3: CLASSIFICATION OF ENVIRONMENTAL CONDITIONS - STATIONARY USE AT WEATHERPROTED LOCATIONS (V2.4.1) |
BS IEC 60780:1998
|
NUCLEAR POWER PLANTS - ELECTRICAL EQUIPMENT OF THE SAFETY SYSTEM - QUALIFICATION |
14/30297921 DC : 0
|
BS EN 62040-5-3 - UNINTERRUPTIBLE POWER SYSTEMS (UPS) - PART 5-3: METHOD OF SPECIFYING THE PERFORMANCE AND TEST REQUIREMENTS FOR D.C. UPS |
10/30232728 DC : 0
|
BS EN 62271-207 ED 2 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 207: SEISMIC QUALIFICATION FOR GAS-INSULATED SWITCHGEAR ASSEMBLIES FOR RATED VOLTAGES ABOVE 52 KV |
BS EN 60076-1:2011
|
Power transformers General |
09/30211740 DC : 0
|
BS EN 62271-210 ED1 - HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 210: SEISMIC QUALIFICATION FOR METAL-ENCLOSED SWITCHGEAR AND CONTROLGEAR FOR RATED VOLTAGES ABOVE 1 KV AND UP TO AND INCLUDING 52 KV |
I.S. EN 50216-2:2002
|
POWER TRANSFORMER AND REACTOR FITTINGS - PART 2: GAS AND OIL ACTUATED RELAY FOR LIQUID IMMERSED TRANSFORMERS AND REACTORS WITH CONSERVATOR |
BS EN 62271-2:2003
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 2: SEISMIC QUALIFICATION FOR RATED VOLTAGES OF 72,5 KV AND ABOVE |
IEC TS 60076-23:2018
|
Power transformers - Part 23: DC magnetic bias suppression devices |
EN 62040-3:2011
|
Uninterruptible power systems (UPS) - Part 3: Method of specifying the performance and test requirements |
IEC/IEEE 60780-323:2016
|
Nuclear facilities - Electrical equipment important to safety - Qualification |
I.S. EN 61758-1:2008
|
FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS - INTERFACE STANDARD FOR CLOSURES - PART 1: GENERAL AND GUIDANCE |
BS EN 62040-3:2011
|
Uninterruptible power systems (UPS) Method of specifying the performance and test requirements |
I.S. EN 62271-207:2012
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 207: SEISMIC QUALIFICATION FOR GAS-INSULATED SWITCHGEAR ASSEMBLIES FOR RATED VOLTAGES ABOVE 52 KV (IEC 62271-207:2012 (EQV)) |
CEI EN 61758-1 : 2010
|
FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS - INTERFACE STANDARD FOR CLOSURES - PART 1: GENERAL AND GUIDANCE |
IEC 60780:1998
|
Nuclear power plants - Electrical equipment of the safety system - Qualification |
IEC 60143-4:2010
|
Series capacitors for power systems - Part 4: Thyristor controlled series capacitors |
CEI 45-60 : 2009
|
NUCLEAR POWER PLANTS - ELECTRICAL EQUIPMENT OF THE SAFETY SYSTEM - QUALIFICATION |
BS EN 60780-323:2017
|
Nuclear facilities. Electrical equipment important to safety. Qualification |
05/30134423 DC : DRAFT JUN 2005
|
IEC 62271-207 - HV SWITCHGEAR ASSEMBLIES - PART 207: SEISMIC QUALIFICATION FOR GAS-INSULATED SWITCHGEAR ASSEMBLIES FOR RATED VOLTAGES ABOVE 52 KV |
CEI EN 60255-21-3 : 1998
|
ELECTRICAL RELAYS - PART 21: VIBRATION, SHOCK, BUMP AND SEISMIC TESTS ON MEASURING RELAYS AND PROTECTION EQUIPMENT - SECTION 3: SEISMIC TESTS |
BS EN 50216-1:2002
|
Power transformers and reactor fittings General |
PD IEC/TS 61463:2016
|
Bushings. Seismic qualification |
IEC TS 61463:2016
|
Bushings - Seismic qualification |
11/30249337 DC : 0
|
BS EN 61587-5 - MECHANICAL STRUCTURES FOR ELECTRONIC EQUIPMENT - TESTS FOR IEC 60917 AND IEC 60297 - PART 5: SEISMIC TESTS FOR CHASSIS, SUBRACKS, AND ASSOCIATED PLUG-IN UNIT |
15/30249614 DC : 0
|
BS IEC/IEEE 60780-323 ED 1.0 - NUCLEAR FACILITIES - ELECTRICAL EQUIPMENT IMPORTANT TO SAFETY - QUALIFICATION |
BS EN 62271-207:2012
|
High-voltage switchgear and controlgear Seismic qualification for gas-insulated switchgear assemblies for rated voltages above 52 kV |
10/30216308 DC : 0
|
BS EN 60068-2-57:2000+A1 - ENVIRONMENTAL TESTING - PART 2-57: TEST METHODS - TEST FF: VIBRATION - TIME-HISTORY & SINE-BEAT METHOD |
BS 2011-2.1FE(1991) : 1991 AMD 7841
|
ENVIRONMENTAL TESTING - TESTS - TEST FE AND GUIDANCE - VIBRATION (SINE-BEAT METHOD) |
I.S. EN 62271-2:2003
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - SEISMIC QUALIFICATION FOR RATED VOLTAGES OF 72,5 KV AND ABOVE |
I.S. EN 50216-1:2002
|
POWER TRANSFORMER AND REACTOR FITTINGS - PART 1: GENERAL |
I.S. EN 60780-323:2017
|
NUCLEAR FACILITIES - ELECTRICAL EQUIPMENT IMPORTANT TO SAFETY - QUALIFICATION |
CEI EN 60076-1 : 2015
|
POWER TRANSFORMERS - PART 1: GENERAL |
UNE-EN 60076-1:2013
|
Power transformers - Part 1: General |
IEC 62040-5-3:2016
|
Uninterruptible power systems (UPS) - Part 5-3: DC output UPS - Performance and test requirements |
IEC 61166:1993
|
High-voltage alternating current circuit-breakers - Guide for seismic qualification of high-voltage alternating current circuit-breakers |
IEC 61747-1:1998+AMD1:2003 CSV
|
Liquid crystal and solid-state display devices - Part 1: Generic specification |
IEC 60068-2-57:2013
|
Environmental testing - Part 2-57: Tests - Test Ff: Vibration - Time-history and sine-beat method |
IEC 60076-1:2011
|
Power transformers - Part 1: General |
IEC 61587-5:2013
|
Mechanical structures for electronic equipment - Tests for IEC 60917 and IEC 60297 - Part 5: Seismic tests for chassis, subracks and plug-in units |
IEC 62040-3:2011
|
Uninterruptible power systems (UPS) - Part 3: Method of specifying the performance and test requirements |
IEC 61587-2:2011
|
Mechanical structures for electronic equipment - Tests for IEC 60917 and 60297 - Part 2: Seismic tests for cabinets and racks |
IEC 62271-2:2003
|
High-voltage switchgear and controlgear - Part 2: Seismic qualification for rated voltages of 72,5 kV and above |
IEC 61758-1:2008
|
Fibre optic interconnecting devices and passive components - Interface standard for closures - Part 1: General and guidance |
NF EN 60255 21-3 : 1998
|
ELECTRICAL RELAYS - PART 21: VIBRATION, SHOCK, BUMP AND SEISMIC TESTS ON MEASURING RELAYS AND PROTECTION EQUIPMENT - SECTION 3: SEISMIC TESTS |
PD IEC/TS 62271-210:2013
|
High-voltage switchgear and controlgear Seismic qualification for metal enclosed and solid-insulation enclosed switchgear and controlgear assemblies for rated voltages above 1 kV and up to and including 52 kV |
16/30349321 DC : 0
|
BS EN 60076-11 ED 2.0 - POWER TRANSFORMERS - PART 11: DRY-TYPE TRANSFORMERS |
BS EN 61587-2:2011
|
MECHANICAL STRUCTURES FOR ELECTRONIC EQUIPMENT - TESTS FOR IEC 60917 AND IEC 60297 - PART 2: SEISMIC TESTS FOR CABINETS AND RACKS |
I.S. EN 60255-21-3:1997
|
ELECTRICAL RELAYS - PART 21: VIBRATION, SHOCK, BUMP AND SEISMIC TESTS ON MEASURING RELAYS AND PROTECTION EQUIPMENT - SECTION 3: SEISMIC TESTS |
I.S. EN 60076-1:2011
|
POWER TRANSFORMERS - PART 1: GENERAL (IEC 60076-1:2011) |
NF EN 60068 2-59 : 1994
|
ENVIRONMENTAL TESTING - PART 2: TEST METHODS - TEST FE: VIBRATION SINE BEAT METHOD |
IEC 60300-3-5:2001
|
Dependability management - Part 3-5: Application guide - Reliability test conditions and statistical test principles |
IEC 60255-21-3:1993
|
Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section 3: Seismic tests |
IEC 62271-207:2012
|
High-voltage switchgear and controlgear - Part 207: Seismic qualification for gas-insulated switchgear assemblies for rated voltages above 52 kV |
EN 62271-207:2012
|
HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 207: SEISMIC QUALIFICATION FOR GAS-INSULATED SWITCHGEAR ASSEMBLIES FOR RATED VOLTAGES ABOVE 52 KV (IEC 62271-207:2012) |
EN 62271-2:2003
|
High-voltage switchgear and controlgear - Part 2: Seismic qualification for rated voltages of 72,5 kV and above |
EN 60068-2-57:2013
|
Environmental testing - Part 2-57: Tests - Test Ff: Vibration - Time-history and sine-beat method |
EN 60143-4 : 2010
|
SERIES CAPACITORS FOR POWER SYSTEMS - PART 4: THYRISTOR CONTROLLED SERIES CAPACITORS |
EN 61587-5:2014
|
Mechanical structures for electronic equipment - Tests for IEC 60917 and IEC 60297 - Part 5: Seismic tests for chassis, subracks and plug-in units |
EN 60076-1:2011
|
POWER TRANSFORMERS - PART 1: GENERAL (IEC 60076-1:2011) |