IEC 60839-5-2:2016
Current
The latest, up-to-date edition.
Alarm and electronic security systems - Part 5-2: Alarm transmission systems - Requirements for supervised premises transceiver (SPT)
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
English - French
03-02-2016
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 General requirements
5 Functional requirements
6 Operation
7 Documentation
8 Housing and tamper protection - Tamper
protection requirements
9 Tests
Annex A (normative) - Requirements of the
interface between AS and SPT
Bibliography
IEC 60839-5-2:2016 specifies the general equipment requirements for the performance, reliability, resilience, security and safety characteristics of supervised premises transceiver (SPT) installed in supervised premises and used in alarm transmission systems (ATS). A supervised premises transceiver can be a stand-alone device or an integrated part of an alarm system. These requirements also apply to the SPT sharing means of interconnection, control, communication and power supplies with other applications. The alarm transmission system requirements and classifications are defined within IEC 60839-5-1. This new edition includes the following significant technical changes with respect to the previous edition:
- reflects the current technological state of art (IP networks);
- harmonizes with the ATS categories introduced in IEC 60839-5-1:2014;
- introduces test requirements.
Committee |
TC 79
|
DevelopmentNote |
Stability Date: 2019. (02/2016)
|
DocumentType |
Standard
|
Pages |
63
|
PublisherName |
International Electrotechnical Committee
|
Status |
Current
|
Supersedes |
Standards | Relationship |
BS EN 50525-2-51:2011 | Identical |
IEC 60839-5-4:1991 | Alarm systems - Part 5: Requirements for alarm transmission systems - Section 4: Alarm transmission systems using dedicated alarm transmission paths |
IEC 60839-5-3:2016 | Alarm and electronic security systems - Part 5-3: Alarm transmission systems - Requirements for receiving centre transceiver (RCT) |
IEC 60839-5-1:2014 | Alarm and electronic security systems - Part 5-1: Alarm transmission systems - General requirements |
IEC 62820-3-2:2018 | Building intercom systems - Part 3-2: Application guidelines - Advanced security building intercom systems (ASBIS) |
IEC 60839-5-6:1991 | Alarm systems - Part 5: Requirements for alarm transmission systems - Section 6: Requirements for voice communicator systems using the public switched telephone network |
IEC 60839-7-7:2001 | Alarm systems - Part 7-7: Message formats and protocols for serial data interfaces in alarm transmission systems - Alarm system interfaces for plug-in alarm system transceivers |
IEC 60839-5-1:2014 | Alarm and electronic security systems - Part 5-1: Alarm transmission systems - General requirements |
IEC 60839-5-3:2016 | Alarm and electronic security systems - Part 5-3: Alarm transmission systems - Requirements for receiving centre transceiver (RCT) |
IEC 62599-1:2010 | Alarm systems - Part 1: Environmental test methods |
IEC 62599-2:2010 | Alarm systems - Part 2: Electromagnetic compatibility - Immunity requirements for components of fire and security alarm systems |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.