BS EN 62475:2010
|
High-current test techniques. Definitions and requirements for test currents and measuring systems |
CEI EN 62008 : 2006
|
PERFORMANCE CHARACTERISTICS AND CALIBRATION METHODS FOR DIGITAL DATA ACQUISITION SYSTEMS AND RELEVANT SOFTWARE |
06/30149562 DC : DRAFT APR 2006
|
IEC 61083-2 - INSTRUMENTS AND SOFTWARE USED FOR MEASUREMENTS IN HIGH-VOLTAGE IMPULSE TEST - PART 2: REQUIREMENTS FOR SOFTWARE |
NF EN 60060-2 : 2011
|
HIGH-VOLTAGE TEST TECHNIQUES - PART 2: MEASURING SYSTEMS |
CEI EN 62475 : 2011
|
HIGH-CURRENT TEST TECHNIQUES - DEFINITIONS AND REQUIREMENTS FOR TEST CURRENTS AND MEASURING SYSTEMS |
07/30161538 DC : 0
|
BS EN 60060-2 - HIGH-VOLTAGE TEST TECHNIQUES - PART 2: MEASURING SYSTEMS |
CEI EN 61083-2 : 2014
|
INSTRUMENTS AND SOFTWARE USED FOR MEASUREMENT IN HIGH-VOLTAGE AND HIGH-CURRENT TESTS - PART 2: REQUIREMENTS FOR SOFTWARE FOR TESTS WITH IMPULSE VOLTAGES AND CURRENTS |
BS EN 61643-21 : 2001
|
LOW VOLTAGE SURGE PROTECTIVE DEVICES - PART 21: SURGE PROTECTIVE DEVICES CONNECTED TO TELECOMMUNICATIONS AND SIGNALLING NETWORKS - PERFORMANCE REQUIREMENTS AND TESTING METHODS |
IEEE C62.50 : 2012
|
PERFORMANCE CRITERIA AND TEST METHODS FOR PLUG-IN (PORTABLE) MULTISERVICE (MULTIPORT) SURGE-PROTECTIVE DEVICES FOR EQUIPMENT CONNECTED TO A 120 V/240 V SINGLE PHASE POWER SERVICE AND METALLIC CONDUCTIVE COMMUNICATION LINE(S) |
IEC 61180-2:1994
|
High-voltage test techniques for low-voltage equipment - Part 2: Test equipment |
EN 61083-2:2013
|
Instruments and software used for measurement in high-voltage and high-current tests - Part 2: Requirements for software for tests with impulse voltages and currents |
EN 62008:2005
|
Performance characteristics and calibration methods for digital data acquisition systems and relevant software |
EN 61180:2016
|
High-voltage test techniques for low-voltage equipment - Definitions, test and procedure requirements, test equipment |
EN 61180-2:1994
|
High-voltage test techniques for low-voltage equipment - Part 2: Test equipment |
EN 60060-2:2011
|
High-voltage test techniques - Part 2: Measuring systems |
EN 62475 : 2010
|
HIGH-CURRENT TEST TECHNIQUES - DEFINITIONS AND REQUIREMENTS FOR TEST CURRENTS AND MEASURING SYSTEMS |
CEI EN 61643-341 : 2002
|
COMPONENTS FOR LOW-VOLTAGE SURGE PROTECTIVE DEVICES - PART 341: SPECIFICATION FOR THYRISTOR SURGE SUPPRESSOR (TSS) |
CEI EN 60076-3 : 2015
|
POWER TRANSFORMERS - PART 3: INSULATION LEVELS, DIELECTRIC TESTS AND EXTERNAL CLEARANCES IN AIR |
03/100554 DC : DRAFT APR 2003
|
IEC 60060-3 ED.1 - HIGH VOLTAGE TEST TECHNIQUES - PART 3: DEFINITIONS AND REQUIREMENTS FOR ON-SITE TESTS |
BS EN 60060-2:1995
|
HIGH-VOLTAGE TEST TECHNIQUES - PART 2: MEASURING SYSTEMS |
BS EN 62008:2005
|
Performance characteristics and caliberation for digital data acquisition systems and relevant software |
BS EN 61083-2:2013
|
Instruments and software used for measurement in high-voltage and high-current tests Requirements for software for tests with impulse voltages and currents |
CEI EN 60076-4 : 2003
|
POWER TRANSFORMERS - PART 4: GUIDE TO LIGHTNING IMPULSE AND SWITCHING IMPULSE TESTING - POWER TRANSFORMERS AND REACTORS |
DIN EN 61180-2 : 1995
|
HIGH-VOLTAGE TEST TECHNIQUES FOR LOW-VOLTAGE EQUIPMENT - PART 2: TEST EQUIPMENT |
VDE 0432-11 : 1995
|
HIGH-VOLTAGE TEST TECHNIQUES FOR LOW-VOLTAGE EQUIPMENT - PART 2: TEST EQUIPMENT |
IEC TS 62561-8:2018
|
Lightning protection system components (LPSC) - Part 8: Requirements for components for isolated LPS |
IEC 61643-21:2000+AMD1:2008+AMD2:2012 CSV
|
Low voltage surge protective devices - Part 21: Surge protective devices connected to telecommunications and signalling networks - Performance requirements and testing methods |
I.S. EN 62008:2005
|
PERFORMANCE CHARACTERISTICS AND CALIBRATION METHODS FOR DIGITAL DATA ACQUISITION SYSTEMS AND RELEVANT SOFTWARE |
I.S. EN 60076-4:2002
|
POWER TRANSFORMERS - PART 4: GUIDE TO THE LIGHTNING IMPULSE AND SWITCHING IMPULSE TESTING - POWER TRANSFORMERS AND REACTORS |
IEC 60060-2:2010
|
High-voltage test techniques - Part 2: Measuring systems |
IEEE 4-2013
|
HIGH-VOLTAGE TESTING TECHNIQUES |
10/30232718 DC : 0
|
BS EN 60076-3 - POWER TRANSFORMERS - PART 3: INSULATION LEVELS, DIELECTRIC TESTS AND EXTERNAL CLEARANCES IN AIR |
NF EN 61211 : 2005
|
INSULATORS OF CERAMIC MATERIAL OR GLASS FOR OVERHEAD LINES WITH A NOMINAL VOLTAGE GREATER THAN 1 000 V - IMPULSE PUNCTURE TESTING IN AIR |
CEI EN 61180 : 1ED 2017
|
HIGH-VOLTAGE TEST TECHNIQUES FOR LOW-VOLTAGE EQUIPMENT - DEFINITIONS, TEST AND PROCEDURE REQUIREMENTS, TEST EQUIPMENT |
I.S. EN 60060-2:2011
|
HIGH-VOLTAGE TEST TECHNIQUES - PART 2: MEASURING SYSTEMS |
I.S. EN 61211:2005
|
INSULATORS OF CERAMIC MATERIAL OR GLASS FOR OVERHEAD LINES WITH A NOMINAL VOLTAGE GREATER THAN 1000 V - IMPULSE PUNCTURE TESTING IN AIR |
ISO 23552-1:2007
|
Safety and control devices for gas and/or oil burners and gas and/or oil appliances — Particular requirements — Part 1: Fuel/air ratio controls, electronic type |
IEC 60076-3:2013+AMD1:2018 CSV
|
POWER TRANSFORMERS - PART 3: INSULATION LEVELS, DIELECTRIC TESTS AND EXTERNAL CLEARANCES IN AIR |
IEC 61180:2016
|
High-voltage test techniques for low-voltage equipment - Definitions, test and procedure requirements, test equipment |
EN 61643-341:2001
|
Components for low-voltage surge protective devices - Part 341: Specification for thyristor surge suppressors (TSS) |
BS EN 60060-1:2010 (published 2011-02)
|
High-voltage test techniques General definitions and test requirements |
I.S. EN 60076-3:2013
|
POWER TRANSFORMERS - PART 3: INSULATION LEVELS, DIELECTRIC TESTS AND EXTERNAL CLEARANCES IN AIR |
BIS IS/IEC 60060-2 : 2010
|
HIGH-VOLTAGE TEST TECHNIQUES - PART 2: MEASURING SYSTEMS |
DIN IEC 60060-1 : 1994
|
HIGH VOLTAGE TEST TECHNIQUES - GENERAL SPECIFICATIONS AND TEST REQUIREMENTS |
13/30294291 DC : 0
|
BS EN 62561-8 - LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 8: REQUIREMENTS FOR COMPONENTS FOR ISOLATED LPS |
BS EN 60076-4:2002
|
Power transformers Guide to the lightning impulse and switching impulse testing. Power transformers and reactors |
BS EN 61643-341:2001
|
LOW VOLTAGE SURGE PROTECTIVE DEVICES - SPECIFICATION FOR THYRISTOR SURGE SUPPRESSORS (TSS) |
BS EN 61211:2005
|
INSULATORS OF CERAMIC MATERIAL OR GLASS FOR OVERHEAD LINES WITH A NOMINAL VOLTAGE GREATER THAN 1 000 V - IMPULSE PUNCTURE TESTING IN AIR |
BS EN 61180-2:1995
|
HIGH-VOLTAGE TEST TECHNIQUES FOR LOW-VOLTAGE EQUIPMENT - PART 2: TEST EQUIPMENT |
DIN EN 61180-1 : 1995
|
HIGH-VOLTAGE TEST TECHNIQUES FOR LOW-VOLTAGE EQUIPMENT - PART 1: DEFINITIONS, TEST AND PROCEDURE REQUIREMENTS |
UNE-EN 60060-2:2012
|
High-voltage test techniques -- Part 2: Measuring systems. |
CEI EN 60060-1 : 2015
|
HIGH-VOLTAGE TEST TECHNIQUES - PART 1: GENERAL DEFINITIONS AND TEST REQUIREMENTS |
I.S. EN 61180-2:1995
|
HIGH VOLTAGE TEST TECHNIQUE FOR LOW-VOLTAGE EQUIPMENT - PART 2: TEST EQUIPMENT |
I.S. EN 61180:2016
|
HIGH-VOLTAGE TEST TECHNIQUES FOR LOW-VOLTAGE EQUIPMENT - DEFINITIONS, TEST AND PROCEDURE REQUIREMENTS, TEST EQUIPMENT |
I.S. EN 61643-21:2001
|
LOW VOLTAGE SURGE PROTECTIVE DEVICES - PART 21: SURGE PROTECTIVE DEVICES CONNECTED TO TELECOMMUNICATIONS AND SIGNALLING NETWORKS - PERFORMANCE REQUIREMENTS AND TESTING METHODS (IEC 61643-21:2000 (EQV) + CORRIGENDUM MAR. 2001 (EQV)) |
I.S. EN 60060-1:2010
|
HIGH-VOLTAGE TEST TECHNIQUES - PART 1: GENERAL DEFINITIONS AND TEST REQUIREMENTS |
IEC 60076-4:1976
|
Power transformers - Part 4: Tappings and connections |
IEC 60060-1:2010
|
High-voltage test techniques - Part 1: General definitions and test requirements |
IEC 62008:2005
|
Performance characteristics and calibration methods for digital data acquisition systems and relevant software |
IEC 61211:2004
|
Insulators of ceramic material or glass for overhead lines with a nominal voltage greater than 1 000 V - Impulse puncture testing in air |
IEC 61083-2:2013
|
Instruments and software used for measurement in high-voltage and high-current tests - Part 2: Requirements for software for tests with impulse voltages and currents |
IEC 62475:2010
|
High-current test techniques - Definitions and requirements for test currents and measuring systems |
UNE-EN 60060-1:2012
|
High-voltage test techniques - Part 1: General definitions and test requirements |
UNE-EN 61180:2017
|
High-voltage test techniques for low-voltage equipment - Definitions, test and procedure requirements, test equipment |
12/30265513 DC : DRAFT MAY 2012
|
BS EN 61180 - HIGH-VOLTAGE TEST TECHNIQUES FOR LOW VOLTAGE EQUIPMENT - DEFINITIONS, TEST AND PROCEDURE REQUIREMENTS, TEST EQUIPMENT |
UNE-EN 62475:2012
|
High-current test techniques - Definitions and requirements for test currents and measuring systems |
I.S. EN 62475:2010
|
HIGH-CURRENT TEST TECHNIQUES - DEFINITIONS AND REQUIREMENTS FOR TEST CURRENTS AND MEASURING SYSTEMS |
BS EN 60076-3 : 2013
|
POWER TRANSFORMERS - PART 3: INSULATION LEVELS, DIELECTRIC TESTS AND EXTERNAL CLEARANCES IN AIR |
I.S. EN 61083-2:2013
|
INSTRUMENTS AND SOFTWARE USED FOR MEASUREMENT IN HIGH-VOLTAGE AND HIGH-CURRENT TESTS - PART 2: REQUIREMENTS FOR SOFTWARE FOR TESTS WITH IMPULSE VOLTAGES AND CURRENTS (IEC 61083-2:2013 (EQV)) |
CEI EN 60060-2 : 2015
|
HIGH-VOLTAGE TEST TECHNIQUES - PART 2: MEASURING SYSTEMS |
IEC 61643-341:2001
|
Components for low-voltage surge protective devices - Part 341: Specification for thyristor surge suppressors (TSS) |
EN 61643-21:2001/A2:2013
|
LOW VOLTAGE SURGE PROTECTIVE DEVICES - PART 21: SURGE PROTECTIVE DEVICES CONNECTED TO TELECOMMUNICATIONS AND SIGNALLING NETWORKS - PERFORMANCE REQUIREMENTS AND TESTING METHODS (IEC 61643-21:2000/A2:2012) |
EN 60060-1:2010
|
High-voltage test techniques - Part 1: General definitions and test requirements |
EN 60076-4:2002
|
Power transformers - Part 4: Guide to the lightning impulse and switching impulse testing - Power transformers and reactors |
EN 61211:2005
|
Insulators of ceramic material or glass for overhead lines with a nominal voltage greater than 1 000 V - Impulse puncture testing in air |
EN 60076-3:2013/A1:2018
|
POWER TRANSFORMERS - PART 3: INSULATION LEVELS, DIELECTRIC TESTS AND EXTERNAL CLEARANCES IN AIR (IEC 60076-3:2013/A1:2018) |