• IEC 61400-25-5:2017

    Current The latest, up-to-date edition.

    Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing

    Available format(s):  Hardcopy, PDF, PDF 3 Users, PDF 5 Users, PDF 9 Users

    Language(s):  English, English - French

    Published date:  20-09-2017

    Publisher:  International Electrotechnical Committee

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    INTRODUCTION
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 Abbreviated terms
    5 Introduction to compliance testing
    6 Device related compliance testing
    7 Performance tests
    Annex A (informative) - Examples of test procedure
            template

    Abstract - (Show below) - (Hide below)

    IEC 61400-25-5:2017 specifies standard techniques for testing of compliance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of users to purchase systems that integrate easily, operate correctly, and support the applications as intended. This part of IEC 61400-25 defines: the methods and abstract test cases for compliance testing of server and client devices used in wind power plants; the metrics to be measured in said devices according to the communication requirements specified in IEC 61400-25 (all parts). This new edition includes the following significant technical changes with respect to the previous edition:
    - harmonization with structure and test cases in IEC 61850-10:2012;
    - reduction of overlap between standards and simplification by increased referencing to the IEC 61850 standard series.

    General Product Information - (Show below) - (Hide below)

    Committee TC 88
    Development Note Stability Date: 2020. (09/2017)
    Document Type Standard
    Publisher International Electrotechnical Committee
    Status Current
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    16/30340907 DC : 0 BS EN 61400-25-6 ED 2.0 - WIND TURBINES - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
    CEI EN 61400-25-6 : 2011 WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
    IEC 61400-25-4 REDLINE : 2ED 2016 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
    CLC/TS 61400-26-3:2017 Wind energy generation systems - Part 26-3: Availability for wind power stations
    IEC 61400-25-4:2016 RLV Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
    EN 61400-25-4:2017 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
    EN 61400-25-6:2017 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
    UFC 3-540-08 : 2017 UNIFIED FACILITIES CRITERIA - UTILITY-SCALE RENEWABLE ENERGY SYSTEMS
    BS EN 61400-25-4:2008 Wind turbines Communications for monitoring and control of wind power plants. Mapping to communication profile
    08/30184178 DC : DRAFT JUNE 2008 BS EN 61400-25-6 - WIND TURBINES - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
    I.S. EN 61400-25-6:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
    S.R. CLC/TS 61400-26-2:2017 WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES
    PD CLC/TS 61400-26-2:2017 Wind turbines Production-based availability for wind turbines
    CEI EN 61400-25-4 : 2009 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
    IEC TS 61400-26-2:2014 Wind turbines - Part 26-2: Production-based availability for wind turbines
    CLC/TS 61400-26-2:2017 Wind turbines - Part 26-2: Production-based availability for wind turbines
    BS EN 61400-25-6:2017 Wind energy generation systems Communications for monitoring and control of wind power plants. Logical node classes and data classes for condition monitoring
    BS PD IEC TS 61400-26-2 : 2014 WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES
    I.S. EN 61400-25-4:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
    NF EN 61400-25-4 : 2017 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
    S.R. CLC/TS 61400-26-3:2017 WIND ENERGY GENERATION SYSTEMS - PART 26-3: AVAILABILITY FOR WIND POWER STATIONS
    IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
    IEC TS 61400-26-3:2016 Wind energy generation systems - Part 26-3: Availability for wind power stations
    PD CLC/TS 61400-26-3:2017 Wind energy generation systems Availability for wind power stations
    PD IEC/TS 61400-26-3:2016 Wind energy generation systems Availability for wind power stations
    IEC 61400-25-6:2016 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
    IEC 61850-6:2009 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
    IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
    IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
    IEC 61400-25-1:2017 Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
    IEC 61850-4:2011 Communication networks and systems for power utility automation - Part 4: System and project management
    IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
    IEC 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
    IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
    IEC 61850-10:2012 Communication networks and systems for power utility automation - Part 10: Conformance testing
    IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective