IEC 61850-7-410:2012
NA
Status of Standard is Unknown
Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
30-10-2012
IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.
Committee |
TC 57
|
DocumentType |
Standard
|
Pages |
159
|
PublisherName |
International Electrotechnical Committee
|
Status |
NA
|
Supersedes |
Standards | Relationship |
UNE-EN 61850-7-410:2013 | Identical |
EN 61850-7-410:2013 | Identical |
BS EN 61850-7-410:2013+A1:2016 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.