IEC 62271-100:2008+AMD1:2012+AMD2:2017 CSV
|
High-voltage switchgear and controlgear - Part 100: Alternating-current circuit-breakers |
IEC 61850-5:2013
|
Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEC 61850-7-2:2010
|
Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
ISO/IEC 7498-1:1994
|
Information technology Open Systems Interconnection Basic Reference Model: The Basic Model |
IEC 62271-202:2014
|
High-voltage switchgear and controlgear - Part 202: High-voltage/ low-voltage prefabricated substation |
IEC 61850-7-410:2012+AMD1:2015 CSV
|
Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
IEC 61850-6:2009
|
Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEEE 802.3-2012
|
ETHERNET - CORRIGENDUM 1: MULTI-LANE TIMESTAMPING |
ISO/IEC 8802-3:2000
|
Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 3: Carrier sense multiple access with collision detection (CSMA/CD) access method and physical layer specifications |
IEC TR 62271-302:2010
|
High-voltage switchgear and controlgear - Part 302: Alternating current circuit-breakers with intentionally non-simultaneous pole operation |
IEC 60870-4:1990
|
Telecontrol equipment and systems. Part 4: Performance requirements |
IEC TR 61850-1:2013
|
Communication networks and systems for power utility automation - Part 1: Introduction and overview |
IEC 61869-9:2016
|
Instrument transformers - Part 9: Digital interface for instrument transformers |
IEC 61850-7-1:2011
|
Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 61850-8-1:2011
|
Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC TR 62063:1999
|
High-voltage switchgear and controlgear - The use of electronic and associated technologies in auxiliary equipment of switchgear and controlgear |
IEC 62271-103:2011
|
High-voltage switchgear and controlgear - Part 103: Switches for rated voltages above 1 kV up to and including 52 kV |
IEC 61850-9-2:2011
|
Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC 61850-4:2011
|
Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 61850-7-420:2009
|
Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
ISO/IEC 8823-2:1997
|
Information technology Open Systems Interconnection Connection-oriented presentation protocol: Protocol Implementation Conformance Statement (PICS) proforma |
IEC 61850-7-4:2010
|
Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 62271-1:2017
|
High-voltage switchgear and controlgear - Part 1: Common specifications for alternating current switchgear and controlgear |
IEC 61850-7-3:2010
|
Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 61850-10:2012
|
Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC 61754-20:2012
|
Fibre optic interconnecting devices and passive components - Fibre optic connector interfaces - Part 20: Type LC connector family |
ISO/IEC 8802-2:1998
|
Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 2: Logical link control |
IEC TS 61850-2:2003
|
Communication networks and systems in substations - Part 2: Glossary |
IEC 61850-3:2013
|
Communication networks and systems for power utility automation - Part 3: General requirements |
IEC 62271-104:2015
|
High-voltage switchgear and controlgear - Part 104: Alternating current switches for rated voltages higher than 52 kV |
IEC 62271-102:2001+AMD1:2011+AMD2:2013 CSV
|
High-voltage switchgear and controlgear - Part 102: Alternatingcurrent disconnectors and earthing switches |