IEC PAS 62337:2002
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Milestones and activities during commissioning of electrical instrumentation and control systems in the process industry
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
08-11-2006
English
30-08-2002
INTRODUCTION
1 Scope
2 Definitions
3 Recommendations for the usage of this document
4 General preparations before acceptance of plant
5 Completion of erection
5.1 Mechanical checks and tests
5.2 Procedure
6 Precommissioning (mechanical completion)
6.1 General
6.2 Procedure
7 Commissioning
7.1 General
7.2 Procedure
8 Performance test and acceptance of plant
8.1 General
8.2 Conditions for Commencement of Performance Test
8.3 Execution of Performance Test
8.4 Evaluation and report of Performance Test
Annex A (normative) List of documents to be utilized for
the precommissioning and commissioning phase
A.1 Technical documents
A.2 Procedures
A.3 General and coordination documents
Annex B (informative) Description of precommissioning activities
Annex C (normative) Mechanical completion certificate
Annex D (normative) Description of commissioning activities
Annex E (normative) Acceptance of plant certificate
Annex F (normative) Project specific items
Figure
Tables
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.