IEC PAS 62381:2004

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) for automation systems in the process industry

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Superseded date

15-11-2006

Superseded by

IEC 62381:2012

Language(s)

English

Published date

28-01-2004

€244.32
Excluding VAT

FOREWORD
INTRODUCTION
1 Scope
2 Definitions
3 Abbreviations
4 General preparation before conducting the FAT
  4.1 Documents typically prepared by the OWNER/CONTRACTOR
  4.2 Documents typically prepared by the VENDOR
5 Factory acceptance test
  5.1 General
  5.2 Test schedule
  5.3 Test procedure
  5.4 FAT rework
  5.5 Documentation of FAT in accordance with Annex A
6 Site acceptance test
  6.1 General
  6.2 Test schedule
7 Site integration test
  7.1 General
  7.2 Test schedule
Annex A (informative) FAT checklists
      A.1 Documentation check
      A.2 HW and SW inventory check
      A.3 Mechanical inspection
      A.4 Wiring and termination inspection
      A.5 Start-up text and general system functions
      A.6 System alarm test
      A.7 Hardware redundancy and diagnostic check
      A.8 Visualization/operation
      A.9 Test of functionality against FBD, FUP, etc.
      A.10 Complex functionality and operation modes
      A.11 Integration of subsystems
Annex B (informative) SAT checklist
Annex C (informative) SIT checklist
Annex D (informative) Factory acceptance test certificate
Annex E (informative) Site acceptance test certificate
Annex F (informative) Site integration test certificate
Annex G (informative) Automation system acceptance certificate
Annex H (informative) FAT punch list
Annex I (informative) SAT punch list
Annex J (informative) SIT punch list

defines procedures and specifications for the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification.

Committee
TC 65
DocumentType
Miscellaneous Product
Pages
35
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy

Standards Relationship
DIN IEC 62381:2004-08 (Draft) Identical
NEN NPR IEC/PAS 62381 : 2004 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.