IEC PAS 62559:2008
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
IntelliGrid methodology for developing requirements for energy systems
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
30-04-2015
English
29-01-2008
FOREWORD
EPRI DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES
1 SCOPE AND OBJECTIVES
1.1 Scope of the Specification
1.2 Overview of the Methodology
1.3 Objectives of this Specification
1.4 Audience of this Specification
2 NORMATIVE REFERENCES
3 DEFINITIONS AND ABBREVIATIONS
4 GLOSSARY OF TERMS
4.1 Referenced Sources of Glossary Terms
4.2 Terms and Definitions
5 INTRODUCTION TO THE INTELLIGRID ARCHITECTURE
5.1 History and Rationale
5.2 Basic Concepts
5.3 The Pyramid
5.4 Business Needs and Functional Requirements
5.5 Development Phases
5.6 Development Streams
5.7 Scope Addressed in this Specification
6 PHASE 1: EXECUTIVES DETERMINE BUSINESS NEEDS AND PLAN
PROJECTS
7 PHASE 2: STAKEHOLDERS DEFINE USER REQUIREMENTS WITH
USE CASES
7.1 Use Case Methodology
7.2 Use Case Workshops to Develop Requirements
7.3 Use Case Analysis
8 PHASES 3-5: TECHNOLOGY SELECTION AND DEPLOYMENT
8.1 Design an Architecture
8.2 Select Technologies
A - ANNEX A: HOW TO DEVELOP USE CASES
A.1 What is a Use Case?
A.2 Purpose of the IntelliGrid PAS Use Case Template
A.3 IntelliGrid PAS Use Case Template: Setting the Stage
A.4 IntelliGrid PAS Use Case Template: A Picture is Worth
a Thousand Words
A.5 IntelliGrid PAS Use Case Template: Step-by-Step
Interactions within Function
A.6 IntelliGrid PAS Use Case Template: Characteristics of
Steps
B - ANNEX B: USE CASE TEMPLATE
B.1 Description of the User Requirements of a Function
B.2 Drawing or Diagram of Function
B.3 Step by Step Analysis of Function
C - ANNEX C: EXAMPLE OF TRANSMISSION SYNCHRO-PHASOR USE CASE
C.1 Description of the User Requirements of a Function
C.2 Drawing or Diagram of Function
Step by Step Analysis of Function
EXAMPLE OF DISTRIBUTION AUTOMATION USE CASE
C.3 Description of the User Requirements of a Function
C.4 Drawing or Diagram of Function
C.5 Step by Step Analysis of Function
D - EXAMPLE OF CONSUMER USE CASE
D.1 Description of the User Requirements of a Function
D.2 Step by Step Analysis of Function
This Publicly Available Specification (PAS) defines a methodology for power system domain experts to determine and describe their user requirements for automation systems, based on their utility business needs. This methodology was originally developed as part of the IntelliGrid Architecture developed by the Electrical Power Research Institute (EPRI), as a means to implement the "IntelliGrid vision" of the automated, self-healing, and efficient power system of the future.
DevelopmentNote |
Stability date: 2012. (10/2012)
|
DocumentType |
Miscellaneous Product
|
Pages |
126
|
PublisherName |
International Electrotechnical Committee
|
Status |
Superseded
|
Standards | Relationship |
NEN NPR IEC/PAS 62559 : 2008 | Identical |
SAC GB/Z 28805 : 2012 | Identical |
BS ISO 15118-1 : 2013 | ROAD VEHICLES - VEHICLE TO GRID COMMUNICATION INTERFACE - PART 1: GENERAL INFORMATION AND USE-CASE DEFINITION |
I.S. EN 62559-2:2015 | USE CASE METHODOLOGY - PART 2: DEFINITION OF THE TEMPLATE FOR USE CASES, ACTOR LIST AND REQUIREMENTS LIST |
IEC TS 62746-3:2015 | Systems interface between customer energy management system and the power management system - Part 3: Architecture |
EN IEC 62559-3:2018 | Use case methodology - Part 3: Definition of use case template artefacts into an XML serialized format |
BS EN ISO 15118-1:2015 | Road vehicles. Vehicle to grid communication interface General information and use-case definition |
IEC TR 62351-13:2016 | Power systems management and associated information exchange - Data and communications security - Part 13: Guidelines on security topics to be covered in standards and specifications |
IEC 62559-2:2015 | Use case methodology - Part 2: Definition of the templates for use cases, actor list and requirements list |
EN 62559-2:2015 | Use case methodology - Part 2: Definition of the template for use cases, actor list and requirements list |
12/30227495 DC : 0 | BS ISO 15118-1 - ROAD VEHICLES - VEHICLE TO GRID COMMUNICATION INTERFACE - PART 1: GENERAL INFORMATION AND USE-CASE DEFINITION |
I.S. EN IEC 62559-3:2018 | USE CASE METHODOLOGY - PART 3: DEFINITION OF USE CASE TEMPLATE ARTEFACTS INTO AN XML SERIALIZED FORMAT |
ISO 15118-1:2013 | Road vehicles Vehicle to grid communication interface Part 1: General information and use-case definition |
I.S. EN ISO 15118-1:2015 | ROAD VEHICLES - VEHICLE TO GRID COMMUNICATION INTERFACE - PART 1: GENERAL INFORMATION AND USE-CASE DEFINITION (ISO 15118-1:2013) |
EN ISO 15118-1:2015 | Road vehicles - Vehicle to grid communication interface - Part 1: General information and use-case definition (ISO 15118-1:2013) |
16/30318378 DC : 0 | BS EN 62559-3 ED 1.0 - USE CASE METHODOLOGY - PART 3: DEFINITION OF USE CASE TEMPLATE ARTEFACTS INTO AN XML SERIALIZED FORMAT |
BS EN 62559-2:2015 | Use case methodology Definition of the template for use cases, actor list and requirements list |
17/30347638 DC : 0 | BS EN ISO 15118-1 - ROAD VEHICLES - VEHICLE TO GRID COMMUNICATION INTERFACE - PART 1: GENERAL INFORMATION AND USE-CASE DEFINITION |
PD IEC/TS 62746-3:2015 | Systems interface between customer energy management system and the power management system Architecture |
IEC 62559-3:2017 | Use case methodology - Part 3: Definition of use case template artefacts into an XML serialized format |
14/30284944 DC : 0 | BS EN 62559-2 ED 1.0 - USE CASE METHODOLOGY - PART 2: DEFINITION OF USE CASE TEMPLATE, ACTOR LIST AND REQUIREMENT LIST |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.