IEEE DRAFT 1012 : 0
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
DRAFT STANDARD FOR SOFTWARE VERIFICATION AND VALIDATION
Hardcopy , PDF
20-07-1998
English
1 SCOPE AND FIELD OF APPLICATION
1.1 PURPOSE
1.2 FIELD OF APPLICATION
1.3 V&V OBJECTIVES
1.4 ORGANIZATION OF THE STANDARD
1.5 AUDIENCE
1.6 COMPLIANCE
1.7 DISCLAIMER
1.8 LIMITATIONS
2 NORMATIVE REFERENCES
3 DEFINITIONS AND ABBREVIATIONS
3.1 DEFINITIONS
3.2 ABBREVIATIONS
3.3 CONVENTIONS
4 V&V PROCESSES FRAMEWORK AND SOFTWARE
INTEGRITY LEVELS
4.1 V&V PROCESSES FRAMEWORK
4.2 SOFTWARE INTEGRITY LEVELS
5 VERIFICATION AND VALIDATION PROCESSES
5.1 PROCESS: ACQUISITION
5.1.1 Activity: Acquisition Support V&V
5.2 PROCESS: SUPPLY
5.2.1 Activity: Planning V&V
5.3 PROCESS: DEVELOPMENT
5.3.1 Activity: Management of V&V
5.3.2 Activity: Concept V&V
5.3.3 Activity: Requirements V&V
5.3.4 Activity: Design V&V
5.3.5 Activity: Implementation V&V
5.3.6 Activity: Test V&V
5.3.7 Activity: Installation and Checkout V&V
5.4 PROCESS: OPERATION
5.4.1 Activity: Operation V&V
5.5 PROCESS: MAINTENANCE
5.5.1 Activity: Maintenance V&V
6 SOFTWARE VERIFICATION AND VALIDATION REPORTING,
ADMINISTRATIVE, AND DOCUMENTATION REQUIREMENTS
6.1 VERIFICATION AND VALIDATION REPORTING REQUIREMENTS
6.2 ADMINISTRATIVE V&V REQUIREMENTS
6.3 V&V TEST DOCUMENTATION
6.4 SVVP DOCUMENTATION
6.4.1 (SVVP Section 1.) Purpose
6.4.2 (SVVP Section 2.) Referenced Documents
6.4.3 (SVVP Section 3.) Definitions
6.4.4 (SVVP Section 4.) Verification and Validation
Overview
6.4.5 (SVVP Section 4.1) Organization
6.4.6 (SVVP Section 4.2) Master Schedule
6.4.7 (SVVP Section 4.3) Resources Summary
6.4.8 (SVVP Section 4.4) Responsibilities
6.4.9 (SVVP Section 4.5) Tools, Techniques, and
Methodologies
6.4.10 (SVVP Section 5.) Verification and Validation
Processes
6.4.11 (SVVP Sections 5.1 through 5.5) ``Software Life
Cycle' V&V
6.4.12 (SVVP Section 6.) V&V Reporting Requirements
6.4.13 (SVVP Section 7.) Administrative V&V Requirements
6.4.14 (SVVP Section 7.1) Anomaly Resolution and
Reporting
6.4.15 (SVVP Section 7.2) Task Iteration Policy
6.4.16 (SVVP Section 7.3) Deviation Policy
6.4.17 (SVVP Section 7.4) Control Procedures
6.4.18 (SVVP Section 7.5) Standards, Practices, and
Conventions
Table 1 V&V Task Criteria, Inputs, and Outputs
Table 2 Minimum V&V Tasks Assigned to Each Software
Integrity Level
Table 3 Optional V&V Tasks and Suggested Applications
in the Life Cycle
Figure 1 An Example of A Software Verification and
Validation Overview
Figure 2 An Example of Timephasing of V&V Test Products
and Test Execution Tasks
Figure 3 Framework of V&V Processes, Activities, and
Tasks Hierarchy
Annex A. Mapping of ISO/IEC 12207 V&V Requirements to
IEEE STd 1012 V&V Activities and Tasks
Annex B: An Illustration of A Software Integrity Level
Scheme
Annex C: Definition of Independent Verification and
Validation (IV&V)
Annex D. V&V of Reusable Software
Annex E. V&V Metrics
Annex F. Example of V&V Organizational Relationship to
Other Project Responsibilities
Annex G. Optional V&V Task Descriptions
DocumentType |
Standard
|
Pages |
108
|
PublisherName |
Institute of Electrical & Electronics Engineers
|
Status |
Superseded
|
SupersededBy |
ISO/IEC 12207:2008 | Systems and software engineering — Software life cycle processes |
IEEE 829-2008 | IEEE Standard for Software and System Test Documentation |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.