DRAFT GUIDE FOR THE COMMISSIONING OF ELECTRICAL SYSTEMS IN HYDROELECTRIC POWER PLANTS
01-10-1998
12-01-2013
1 SCOPE AND INTRODUCTION
1.1 SCOPE
1.2 INTRODUCTION
2 REFERENCES AND STANDARDS
3 DEFINITIONS
4 STARTUP ORGANIZATION
4.1 GENERAL
4.2 OWNER
4.3 CONTRACTOR
4.4 ENGINEER
4.4.1 Project Engineering
4.4.2 Lead Test Engineer
4.5 MANUFACTURER/VENDOR
5 COMMISSIONING PROGRAM
5.1 COMMISSIONING PROGRAM PHASES
5.1.1 Construction Test Phase
5.1.2 Pre-operational Test Phase
5.1.3 Operational Test Phase
6 COMMISSIONING PHASES
6.1 GENERAL
6.2 CONSTRUCTION COMPLETION PHASE
6.2.1 Electrical
6.2.2 Mechanical
6.2.3 Piping
6.2.4 Instrumentation
6.3 PRE-OPERATIONAL TESTING PHASE
6.3.1 Electrical
6.3.2 Mechanical
6.3.3 Piping
6.3.4 Instrumentation
6.4 UNIT STARTUP AND OPERATIONAL PHASE
7 APPLICATION OF GUIDE
7.1 GENERAL
7.2 USING THE GUIDE TO DEVELOP A TEST PROGRAM
7.3 COORDINATING COMMISSIONING TESTS OF SYSTEMS AND UNITS
8 PLANT EQUIPMENT
8.1 LIST OF EQUIPMENT AND TEST MATRIXES
9 SYSTEMS TESTS
9.1 LIST OF TESTS AND TEST DESCRIPTIONS
10 DOCUMENTATION
10.1 RECORD KEEPING
10.2 ENGINEERING DOCUMENTATION
10.3 FACTORY DOCUMENTATION
10.3.1 Factory Testing of Equipment
10.4 ON-SITE DOCUMENTATION
11 BIBLIOGRAPHY
11.1 Generators and Motors
11.2 Transformers
11.3 Governors
11.4 Cable and Raceway
11.5 Protection and Relaying?
11.6 Excitation
11.7 Insulation
11.8 Batteries, Ups, and Standby Power Systems
11.9 Breakers, Switchgear, Panelboards, and Motor
Control Centers
11.10 Control and Scada
11.11 Grounding
11.12 Definitions, Codes, References, and Tables
11.13 Maintenance
11.14 Fire Protection
11.15 Miscellaneous
LIST OF FIGURES AND TABLES
Figure 7-1 Example, Equipment Test Matrix
Figure 7-2 Example, Test Description
Figure 7-3 Test Package, Excitation System Control
Figure 7-4 Road Map for a Plant Commissioning Program
Table A1 Equipment / System Tests
Directed to the designers, contractors and plant owners involved in the commissioning of electrical systems of hydroelectric plants.
DocumentType |
Draft
|
PublisherName |
Institute of Electrical & Electronics Engineers
|
Status |
Superseded
|
SupersededBy |
IEEE 62-1995 | IEEE Guide for Diagnostic Field Testing of Electric Power Apparatus - Part 1: Oil Filled Power Transformers, Regulators, and Reactors |
ANSI C50.12 : 2005 | SYNCHRONOUS GENERATORS AND GENERATOR/MOTORS FOR HYDRAULIC TURBINE APPLICATIONS, REQUIREMENTS FOR SALIENT POLE SYNCHRONOUS |
ANSI C50.10 : 1990 | ROTATING ELECTRICAL MACHINERY - SYNCHRONOUS MACHINES |
IEEE 4-2013 | IEEE Standard for High-Voltage Testing Techniques |
IEEE 95-2002 | IEEE Recommended Practice for Insulation Testing of AC Electric Machinery (2300 V and Above) With High Direct Voltage |
IEEE 115-2009 REDLINE | IEEE Guide for Test Procedures for Synchronous Machines Part I—Acceptance and Performance Testing Part II—Test Procedures and Parameter Determination for Dynamic Analysis |
IEEE 43-2013 REDLINE | IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.