INCITS/ISO/IEC 10026-3 : 1998 : R2007
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
INFORMATION TECHNOLOGY - OPEN SYSTEMS INTERCONNECTION - DISTRIBUTED TRANSACTION PROCESSING - PART 3: PROTOCOL SPECIFICATION
Hardcopy , PDF
24-04-2024
English
01-01-2007
Foreword
Introduction
1 Scope
2 Normative references
3 Definitions
4 Abbreviations
5 Conventions
6 Model of the PM
6.1 Overview
6.2 OSI TP Protocol structure
7 Execution Rules
7.1 Operation of the PM
7.2 Procedure rules
7.3 Definitions
7.4 Log records used by the PM
7.5 Recovery-context-handle
8 Use of ACSE, CCR and the Presentation Layer
8.1 Introduction
8.2 Use of ACSE Service primitives
8.3 Use of CCR Service primitives
8.4 Use of the Presentation Layer
8.5 Association Management
9 TP-ASE description
9.1 Introduction
9.2 AF Service Definition
9.3 AF-Services and TP APDUS: parameters and field
Mappings
9.4 Procedures
9.5 Mapping
10 SACF description
10.1 Introduction
10.2 SACF states
10.3 Service definitions for SAF service
10.4 Procedure for SAF primitives
10.5 Procedures for TP-ASE, CCR, ACSE, and Presentation
Service Primitives
10.6 SACF internal events
10.7 Concatenation
10.8 Routeing
11 MACF description
11.1 Introduction
11.2 CAF service definition
11.3 Main procedures
11.4 Internal event procedures
11.5 Common Procedures
12 Structure and encoding of TP APDUs
12.1 Abstract syntax of the TP-ASE APDUs
12.2 Rules of extensibility
13 Conformance
13.1 Static conformance requirements
13.2 Dynamic conformance requirements
13.3 Protocol Implementation Conformance Statement
13.4 Receiving TP APDUs
14 Compliance
15 Precedence statement
16 Index of Actions and Events
Annexes
Annex A (normative) OSI TP protocol - State tables
A.1 General
A.2 Introduction
A.3 Processing rules
A.4 MACF state tables
A.5 TPASE
A.6 SACF
A.7 Predicates
Annex B (normative) Requirements for writing U-ASEs and
application contexts
Annex C (informative) Scenarios
C.1 Introduction
C.2 Scenarios with a single dialogue (successful cases)
C.3 Scenarios with a single dialogue (unsuccessful cases)
C.4 Scenarios with a single dialogue (failure cases)
C.5 Collision scenarios on a single dialogue
C.6 Tree with multiple dialogues (successful cases)
C.7 Tree with multiple dialogues (unsuccessful cases)
C.8 Heuristic decisions and reporting
C.9 Scenarios for SACP
C.10 Scenarios for CPM
C.11 Read-only scenarios
C.12 Early-exit scenarios
C.13 Static one-phase commitment scenarios
C.14 Implicit prepare scenarios
C.15 TP-ROLLBACK scenarios
C.16 Dynamic Commitment scenarios
C.17 Scenarios showing token movement during transaction
termination
C.18 Recovery context handle on dialogue scenario
Annex D (informative) Summary of assigned object identifier
values
Annex E (informative) Recovery from destruction of atomic
action data
E.1 Introduction
E.2 Recovery actions
Annex F (informative) TPPM transaction states
F.1 TPPM transaction states
Annex G (informative) Managing association pools by inference
G.1 Introduction
G.2 Definitions
G.3 Rules
G.4 Benefits
G.5 Suggested System Management Objects
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.