• Shopping Cart
    There are no items in your cart

ISA 20 : 1981

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

SPECIFICATION FORMS FOR PROCESS MEASUREMENT AND CONTROL INSTRUMENTS, PRIMARY ELEMENTS AND CONTROL VALVES

Available format(s)

Hardcopy

Superseded date

12-01-2014

Language(s)

English

Published date

01-01-1981

1 Purpose
2 Scope
3 Receiver instruments
4 Annunciators
5 Potentiometer instruments specification sheet
   instructions
6 Temperature instruments (filled systems)
7 Thermocouples and thermowells
8 Resistance temperature sensors
9 Bi-metal thermometers
10 Differential pressure instruments
11 Orifice plates and flanges
12 Rotameters
13 Magnetic flowmeters
14 Turbine flowmeters
15 Positive displacement meters
16 Level instruments (displacer or float)
17 Level instruments, capacitance type
18 Gage glasses and cocks
19 Traps and drainers
20 Pressure instruments
21 Pressure gages
22 Pressure switches
23 Instructions for control valve data sheet - ISA Form
   S20.50, Rev. 1
24 Pressure control valves - pilots & regulators
25 Self-actuated temperature regulators
26 Pressure relief valves
27 Rupture discs
28 Solenoid valves

Gives uniformity in instrument specifications, both in content and form. Due to the complexity of present day instruments and controls it is desirable to have some type of specification form to list pertinent details for use by all interested parties.

Committee
SP20
DevelopmentNote
Formerly it was ISA-S20 (05/2001) Also available in: Forms in Excel format on CD-ROM format, Instrument Forms Plus LITE. (01/2007)
DocumentType
Standard
Pages
98
PublisherName
International Society of Automation
Status
Superseded
SupersededBy

API RP 14C : 2017 ANALYSIS, DESIGN, INSTALLATION, AND TESTING OF SAFETY SYSTEMS FOR OFFSHORE PRODUCTION FACILITIES
ISA RP60.4 : 1990 DOCUMENTATION FOR CONTROL CENTERS
CSA C22.4 No. 1 : 2009(R2018) OBJECTIVE-BASED INDUSTRIAL ELECTRICAL CODE
CSA C22.4 PACKAGE : 2009 CONSISTS OF C22.4 NO. 1-09, OBJECTIVE-BASED INDUSTRIAL ELECTRICAL CODE AND C22.4 NO. 2-09, OBJECTIVE-BASED INDUSTRIAL ELECTRICAL CODE - SAFETY MANAGEMENT SYSTEM REQUIREMENTS
UFC 3-430-11 : 2001 UNIFIED FACILITIES CRITERIA - BOILER CONTROL SYSTEMS
ANSI/ISA TR77.70.01 : 2010(R2015) TRACKING AND REPORTING OF INSTRUMENT AND CONTROL DATA
PIP PCEDO001 : 2015 GUIDELINES FOR CONTROL SYSTEMS DOCUMENTATION
PIP PCCLI001 : 2014 LEVEL MEASUREMENT DESIGN CRITERIA
PIP PCCCV001 : 2016 CONTROL VALVES SELECTION CRITERIA
PIP PCSPS001 : 2015 PACKAGED EQUIPMENT INSTRUMENTATION SPECIFICATION

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.